00-005 RES RESOLUTION 00- 5
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION ADOPTING FEES FOR SERVICES FOR 2000
WHEREAS,
WHEREAS,
the council has reviewed the fees charged for services; and
the attached fee schedule reflects the fees charged for
services rendered by the city of Elk River
NOW, THEREFORE, BE IT RESOLVED, that the attached fee schedule is
effective for the year 2,000.
Passed and adopted by the City Council of the City of Elk River this 10th day
of January, 2000.
· Klinzin~May~or
ATTEST:
Sandra A. Peine, City Clerk
S: \ DOCUMENT \ RESOLUTI \ feeresol.doc
CITY OF ELK RIVER 2000 FEE SCHEDULE
ASSESSMENT SEARCH CERTIFICATION ........ $15/each
ANIMAL LICENSES
Cat .......................................................
Dog ......................................................
Duplicate Cat or Dog License .................
Residential Kennel ..................................
Commercial Kennel ................................
$5/2 years
$10/2 years
$2 each
$50/year
$75/year
AUDIO/VISUAL
Dubbing Police Audio Tapes ...................
Dubbing Audio Tapes .............................
Dubbing Video Tapes ............................
Video Operator .....................................
$20/tape
$1 O/tape
$30/tape
$40/hour - ($80 minimum)
BUILDING PERMIT
Industrial, commercial, multifamily
residential, single family homes, and
additions ..............................................
State Residential Contractor License
Search ..................................................
Miscellaneous Building Permits .................
Heating, Ventilation and Air Conditioning.
Gas Fitting Permit Fee .............................
Gas Fitter's License .................................
Plumbing Permit .....................................
State permit fee, UBC Table 1~ plus 65%
plan check fee (valuation based on
current State of MN building valuation
data)
$5/permit
City permit fee schedule Exhibit C plus
State Surcharge
City permit fee schedule Exhibit B - 1.5%
City permit fee schedule Exhibit A
$35/year
City permit fee Schedule D - $8/fixture
BURNING PERMITS
Residential Special Burning Permit .............
Residential Special Burning Permit to Clear
Land ......................................................
Residential Special Burning Permit -
Daytime Hours .........................................
$10 each
$25 each
$25 each
COMMUNITY PROFILE ............................... $.20 each
COPIES ................................................... $.15 each
CUPS - ELK RIVER
$2.25 each
DOCUMENTS
Audit .....................................................
Budget ...................................................
City Code ..............................................
Housing Maintenance Ordinance ............
Meeting Packets .....................................
Microfilm Document ................................
Sign Ordinance .......................................
Subdivision Ordinance .............................
Zoning Ordinance ...................................
$0
$75 each
$5 each
$5/packet
$1/page
$5 each
$5 each
$25 each
FALSE ALARMS
Fire .........................................................
Other ......................................................
FLAG - (CJt~) ...........................................
GARBAGE HAULER LICENSE ........................
GRADING PERMIT .....................................
LABOR RATE - Research, Computer
Services, Etc ............................................
LIQUOR LICENSE
Club .......................................................
Intoxicating On Sale .................................
Intoxicating Sunday On Sale .....................
Investigation Fee
Corporation ..........................................
Single ...................................................
Non-Intoxicating Off Sale ..........................
Non-Intoxicating On Sale .........................
Set Up ....................................................
Wine ......................................................
Temporary Non-Intoxicating .....................
Temporary Intoxicating ............................
Premises Extension Permit (on-sale) ............
MAPS
Aerial Photos ...........................................
Aerial Topography Maps ..........................
Large Base, Zoning, or Land Use Map ........
Medium Base or Zoning Map ....................
Medium Base Ward Map ..........................
Copies of Maps from Xerox Machine
MARKETING BROCHURE ............................
5150 for the 4th alarm, $50 for each
successive alarm thereafter
$50 for 5th alarm
$32 each
$60 1st truck plus 515 each additional truck
$50 plus city consultant fees if required to
process application
$15/hr (15 minutes minimum)
$300/year
$4,000/year
$200/year
$250
$150
$75/year
$225/year
$75/year
$650/year
$20/day
$20/day
$25
$6/sheet
$15/per acre
$3 each
$2 each
$2 each
$2 each
$3 each
MASSAGE ESTABLISHMENT ........................
Initial Fee (Includes Investigation Fee)
Single .................................................. $200
Corporation ......................................... $300
Partnership ........................................... $300
Renewal Fee ........................................... $150
MASSAGE THERAPIST ..............................
Initial Fee (Includes Investigation Fee) ...... $150
Renewal Fee .......................................... $100
MECHANICAL AMUSEMENT
Mechanical Rides ...................................
Pin Ball Games .......................................
Pool Tables (Coin Operated) ...................
Video Games .........................................
$15/per establishment plus:
$15/ride
$15/machine
$15/ta ble
$15/game
MINERAL EXTRACTION ..............................
PARK DEDICATION FEE (Resolution 95-89)
Residential ..............................................
Commercial ............................................
Industrial .................................................
PARK AND GAZEBO RESERVATION FEE
0-100 People ...........................................
101-250 People ........................................
251-500 People ........................................
Over 500 People ......................................
Large Community Events ..........................
$20/acre to be actively mined in
forthcoming year or not reclaimed
$5/acre approved but not actively mined
(to be amended 3/99)
$1,400/dwelling unit
$3,000/acre
$2,000/acre
$50
$75
$100
$200
$5oo
(Deposits are refundable if the shelter and
surrounding area are cleared of refuse and
debris prior to leaving the area.)
PARKING FINES (Resolution 97-30)
Overtime Parking .................................... $10
Prohibited/Improper Parking .................... $15
No Parking 2 a.m. to 6 a.m ....................... $15
Winter Parking Ordinance ........................ $15
Other ...................................................... $15
Fire Lane/Hydrant .................................... $20
Handicap Parking Only ............................ $200
PARKING STICKERS
Railroad Parking Lot .................................
Commuter Parking ...................................
Duplicate (for lost stickers)
PAWN SHOPS ...........................................
Investigation Fee ......................................
PINS
Plastic - Elk River .......................................
Metal- Elk River ........................................
RENTAL DWELLING LICENSE .........................
$12/space (3 stickers/space maximum)
$12/space (2 stickers/space)
$1/sticker
$12,000/yea r
$1,500
$.35 each
2.50 each
$12/dwelling unit
SEPTIC INSTALLATION AND REPAIR .............. $60
SEWER AVAILABILITY CHARGE (SAC)
(Plant replacement interceptor) ................
$1,300
SIGN PERMITS
Up to 100 square feet ............................... $30
101-300 square feet .................................. $90
Over 300 square feet ................................ $150
Yearly Advertising Structure (Billboard)
Inspection ............................................... $10
SOLID WASTE FACILITY LICENSE ..................
STREET DISRUPTION/UTILITY HOOKUP PERMIT..
SURFACE WATER MANAGEMENT IMPACT FEE.
(3% annual increase) (Resolution 94-110)
TOBACCO ...............................................
TRANSIENT MERCHANT LICENSE ..................
WATER ACCESS CHARGE (WAC) .................
(Contact Municipal Utilities - 441-2020)
WATER CONNECTION CHARGE ...................
(Contact Municipal Utilities - 441-2020)
ZONING/PLANNING APPLICATIONS
Administrative Subdivision .........................
Conditional Use Permit
Commercial/Industrial ............................
Residential .............................................
Amendments and renewals requiring
public hearings ......................................
Easement Vacation ..................................
General Zoning Requests ..........................
Land Use Plan Amendment .......................
Nonconforming Sign Alteration ..................
Ordinance Amendment ...........................
Plats .......................................................
Permitted Home Occupations ...................
Planned Unit Development (PUD) ...............
Site Plan Review .......................................
Variance .................................................
Zone Change ..........................................
$2,000 plus cost of reviewing license.
Amount of annual cost incurred by the city
for monitoring and inspecting the facility
plus the license.
$35
$73.02/residential lot (rural)
$146.07/residential lot (urban)
$876.41/acre (multifamily, commercial, and
industrial)
$100/year
$50/year
$300
$1,050
$150 plus Park Dedication if applicable
$300
$100
$75
$150
$50
$300
$110
$3OO
$500 + $5/Iotfor each lot over50
$15
Charge for whatever planning applications
are needed forthe PUD, i.e. CUP, Rezoning,
etc.
$250
$150
$250
\ \elkriver\sys\shrdoc \document\resoluti\99fees.doc
EXHIBIT A
CITY OF ELK RIVER
FUEL-GAS PIPING PERMIT FEES
The Chief Building Inspector, before issuing any permit for the installation of
any fuel-gas piping, shall require the payment by the applicant for such permit
of fees in the amount herein provided.
Minimum Fee
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be less than Eighteen Dollars ($18.00).
Basic Fees
(A)
The fees for all fuel-gas piping permits shall be computed on the basis of the
number of fuel-gas appliances. The fee for each appliance so provided for shall,
except as hereinafter otherwise specifically provided, be Six Dollars ($6.00) for
each fuel-gas appliance.
(B)
Where any such permit is issued for roughing-in of fuel-gas lines for future
appliances, a fee of Six Dollars ($6.00) shall be charged for each line or lines.
(c)
In addition to the Six Dollar ($6.00) charge for each fuel-gas appliance and
future fuel-gas lines run for appliance, a Six Dollar ($6.00) charge for the main
fuel-gas supply in the building shall be charged.
(D)
For the purpose of this article, a gas appliance shall be taken to mean a
furnace, range, water heater, dryer, fireplace, barbecue, etc.
s: \b&z\ord-fuel.doc
EXItlBIT B
CITY OF ELK RIVER
HEATING, VENTILATION AND AIR CONDITIONING
PERMIT FEES
FEES REQUIRED
The Chief Building Inspector, before issuing any permit for the installation,
alteration, or repair of any heating, ventilation, and air conditioning
appliance items, connections or appendages, shall require the payment by the
applicant for such permit of fees in the amount herein.
MINIMUM FEE
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be less that $18.00.
MAXIMUM FEE
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be more than $100.00 for a single family home.
PERMIT FEE FOR HEATING, VENTILATION AND AIR
CONDITIONING APPLIANCE ITEMS, CONNECTIONS OR
APPENDAGES
For any permit for the installation, alteration or repair of the above-
referenced items, the fee shall be one and one-half percent (1.5%) of the
valuation of the work or as calculated under the Uniform Mechanical Code,
whichever is greater.
\ \ elkriver \ sys \ shrdoc \ b& z \ heatvent.doc
EXHIBIT C
CITY OF ELK RIVER
MISCELLANEOUS PERMIT FEES
Decks
$8.00 per square foot for valuation for permit fee; plus state surcharge. Plan
check is included with this price.
Fences
Under 6 feet no charge
Over 6 feet - $15.00 plus state surcharge
Fireplaces and Wood Stoves
$20.00 plus state surcharge
$15.00 plus state surcharge for a burning appliance installed into an existing
chimney.
Garages and Basement Finish
$10.00 per square foot for valuation, use building permit fee plus state
surcharge. Plan check is included with this price.
Re-roof
Residential - $35.00 plus state surcharge. Commercial/Industrial - $.50 per
square foot for valuation for permit fee plus state surcharge.
Swimming Pools
$35.00 plus state surcharge
3 Season Porches
$40.00 x square footage = valuation for permit fee plus state surcharge. Plan
check is included with this price.
Moving Structures
Moving structures in - $150.00 plus state surcharge
Moving structures out - $35.00 permit fee
s:\b&z\fees.doc
EXHIBIT D
CITY OF ELK RIVER
PLUMBING PERMIT FEES
The Chief Building Inspector, before issuing any permit for the installation of
any plumbing work, fixture, or device, shall require the payment by the
applicant for such permit of fees in the amount herein provided.
MINIMUM FEE
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be less than Twenty-Four Dollars ($24.00)
BASIC FEES
(A)
The fees for all plumbing permits shall be computed on the basis of the
number of fixture openings, plumbing fixtures, or devices provided for in such
permits, whether subsequently so installed or not, and the fee for each fixture
so provided for shall, except as hereinafter otherwise specifically provided, be
Eight Dollars ($8.00) for each fixture installed or replaced or set only (no
waste or vent piping), the fee for each such fixture shall be Eight Dollars
($8.00).
(B)
Where any such permit is issued for roughing in plumbing openings only,
providing for certain proposed fixtures, which are to be installed or set later,
a fee of Eight Dollars ($8.00) shall be charged for each such opening, which
fee shall be in addition to the fee charged for other plumbing work included
in the same permit.
(c)
For the purpose of this article, a plumbing fixture shall be taken to mean and
include any sink, laundry tub, bathtub, wash basin, drinking fountain, floor
drain, or any other plumbing device arranged to be connected with the sewer
or plumbing system, either directly or indirectly, and required to be trapped.
CITY UTILITY HOOK-UP PERMIT
Building Sewer Plant ............................................................................. $18.00
Curb Stop Water Connection Permit ..................................................... $21.00
Abandoning or Repairing Water Service Permit .................................. $21.00
Storm Sewer Connection Permit and Inspection Fee ............................ $18.00
City of Elk River
Plumbing Permit Fees-Exhibit D
ALTERATIONS, REPAIRS
Page 2
For each permit for the alteration or repairing of existing plumbing work not
included above, the fee shall be Six Dollars and Twenty-five Cents ($6.25) for
the first Five Hundred Dollars ($500.00) or fraction thereof in the estimated
cost of such proposed work. For each additional Five Hundred Dollars
($500.00) or fraction thereof in such estimated cost, Six Dollars and Twenty-
five Cents ($6.25) shall be added to the above described fee for such permit.
\ \ elkriver \ sys \ shrdoc \ b&z \ ord-plum.doc
VI. COST FOR SERVICES
a. Photocopy rate
(Flat Rate) ................................. $
b. Labor rate
(research, assembly,
computer services etc.) ..............
c. Postage .....................................
d. Microfilm services
.15 per page
$15.00 per hour (15 minutes minimum)
Prevailing rate
From film to hard copy ................. $ 1.00 per page (includes labor cost)
e. Dubbing audio tapes
Police Department ........................ $20.00/tape
Other .......................................... $10.00/tape
f. Dubbing video tapes .................. $ 30.00 per tape
g. Meeting Packets ........................ $ 5.00 per packet
These rates are subject to change. The rates will be included in the fee schedule,
which is adopted by council resolution.
\ \ elkriver \ sys \ shrdoc \ forms \ infdiscr.doc
Meeting Packet Request Form
Meeting packet information is available at City Hall for public
inspection at no charge.
Copies of the complete packet or individual items from the packet are
available at the rates listed below. Please fill out the following form and
return with payment. Full packet requests must be made by 3 p.m. on the
Wednesday preceding the meeting.
Entire Packet
Meeting packets are available on the Friday preceding the meeting. Upon
receipt of payment, packets may be picked up on Friday after 4 p.m. If
requested, packets will be mailed (we do not guarantee mailed packets will be
delivered in time for meeting).
Type of Meeting (ie, City Council,
Planning Commission, etc. Date of Meeting #Packets Total
x $5 =
x $5 =
x $5 =
x $5 =
TOTAL x $5 =
Individual Items
Cost for individual agenda items (ie, memo/back-up on a certain item) is $. 15
per page. A labor charge of $15.00 per hour will be included after 50 copies.
(15 minutes minimum).
Type of Meeting (ie, City Council, Meeting Agenda
Planning Commission, etc. Date Item # # Copies Total
x $.15=
x $.15 =
x $.15 =
x $.15 =
x $.15 =
Labor Charge (over 50 copies) # Hours X $15 =
TOTAL
Name:
Address:
Phone:
\ \ forms \ pktrqst.doc