3.3. SR 09-23-2002TO: FROM: DATE: SUBJECT: MEMORANDUM Mayor and Council Lori Johnson, Finance Director September 23, 2002 Pay Estimates **Item 3.3.** Attached are pay estimates for various improvement projects currently under construction. The city engineer has reviewed the pay estimates and recommends approval. Also attached are the first pay estimates for the Public Safety Facility and City Hall Expansion building projects. These pay estimates have been reviewed and approved by Kraus-Anderson and Tushie Montgomery. Payments will be made directly to the contractors listed on page one of the application and certificate for payment. Page two lists all of the contracts awarded to date along with the contract amount, this pay request, and the balance remaining. Pay Est. Project No. Contractor Amount Zane Ave. 2 S.R. Weidema $ 35,641.06 Jackson St. Lift Stn. 1 Quality Flow Systems, Inc. 41,420.00 Orono Parkway 1 Jay Brothers, Inc. 38,304.00 175~h Ave. 1 S.R. Weidema 58,298.13 Public Safety Facility 1 City Hall Expansion 1 Various 381,081.00 Various 17,777.00 Action Requested The City Council is asked to approve the pay estimates as listed above for improvement projects and as attached for the Public Safety and City Hall Expansion building projects. PARTIAL PAYMENT ESTIdATE NO. 2 FROM: August 1, 2002 TO: Septembe~ 3, 2002 CONTRACTOR: S.R. WEIDEMA ADDRESS: 17600 113'1~1 AVE N., MAPLE GROVE, MN 5.5369 OWNER: CITY OF ELK RIVER, MINNESOTA pROdECT: ZANE AVENUE IMPROVEMENTS DffiPLEI'ION DATE AMOUNT OF CONTRACT: ORIGINAL: ORIGINAL: REVISED: RE~I~ED: ~02,308.40 TOTAL BID ~RY THIS PERIOD $37,516.90 TOTAL 8ID SUMMARY TO DATE ~MOL/NT EARNED $37,516.g0 $179,901 ~MOL~T RETAINED $1,875.85 $8.995.08 dATERIAL ON SITE $0.00 ' $0.00 dATERIAL OEDUCT. $0.00 ............. $135,265.51 o:~orol~515640J~Payest #2~090902 PAGE PARTIAL PAYMENT ESTIMATE NO. 1 FROM: August 1,2002 TO: August 30. 2002 CONTRACTOR: Quality Flow Systems, Inc, ADDRESS; 800 - 6th Street NW, New Prague, MN 56071 OWNER: City of Elk River, Minnesota PROJECT: Jackson Street Lift Station ModifiactJons COMPLETION DATE: ORIGINAL: September 3, 2002 REVISED: AMOUNT OF CONTRACT: ORIGINAL: REVISED: $43,600.00 $43,600,00 ITEM DESCRIPTION BID REMOVAL OF EXISTING PUMP STATION EQUIPMENT; FURNISHING AND INSTALLATION OF NEW PUMPING EQUIPMENT; PROCESS PIPING MODIFICATIONS;CONCRETE CONTROL PANEL PAD; ELECTRICAL CONTROLS; CONTROL PANEL AND SERVICE ENTRY EQUIPMENT; ELECTRICAL WIRING MODIFICATIONS; ACCESS HATCH REPLACEMENT; MINOR DEMOLITION WORK; STARTUP AND TRAINING; AND CLEANUP; SITE GRADING AND SEEDING. T BID-TOTAL BID SUMIVJARY BID - TOTAL TOTAL BID SUMMARY THIS PERIOD TOTAL BID SUMMARY TO DATE AMOUNT EARNED AMOUNT RETAINED MATERIAL ON SITE MATERIAL DEDUCT PREVIOUS PAYMENTS AMOUNT DUE CONTRACT ITEMS UNIT QTY UNIT PRICE LS 1 $ 43,600.00 $43,600.00 TOTAL THIS PERIOD $41,420.00 5% $2,071.00 $ - $ $ $39,349 THIS PERIOD QTY AMOUNT 95% $41.420.00 $ - $41.420,00 TOTAL TO DATE $41,420.00 $2,071.00 $ $39,349.00' TOTAL TO D-ATE QTY,. AMOUNT $41,420.00 $ - $4t ,420.00 FROM: TO: PARTIAL PAYMENT ESTIMATE NO. 1 August 1, 2002 August 31, 2002 CONTRACTOR: ADDRESS: OWNER: PROJECT: Jay Brothers, Inc. P.O. Box 700, Forest Lake, MN 55025 City of Elk River, Minnesota Orono Parkway Median Modifications COMPLETION DATE ORIGINAL: REVISED: AMOUNT OF CONTRACT: ORIGINAL: $98,204.00 REVISED: BID SUMMARY SCHEDULE 1.0 - ORONO PARKWAY - TOTAL SCHEDULE 2.0 - EVANS STJt93RD AVENUE - TOTAL TOTAL THIS PERIOD $40,320.00 TOTAL TO DATE $40,320.00 $0.00 $0.00 TOTAL BIO SUMMARY THIS PERIOD TOTAL BID SUMMARY TO DATE $40,320. O0 $40,320.00 FROM: TO: PARTt~. PAYMENT EStTIMATE NO. 1 AUGUST IS. 2002 AUGUST 30, 2002 CONTRACTOR: ADDRESS: OWNER: PROJECT: S.R. WEIDEMA 1760~ t 133~1 AVE N., MAPLE GROVE, MN 55369 Cl3'f OF ELK RIVER, MINNESOTA t 751h AVENUE STREET AND UTILITY IMPROVEMENTS COMPt. ETION DATE AMOUNT OF CONTRACT: ORICJNAL: $ 729,435.30 RE,TEED: ~1,O S Ull41vlAR y SCHEDULE t.0 * 175TH AVENUE - TOTAL SCHEDULE Z.0. ALTERNATE - TOTAL TOTAL BID SUMMARY THIS PERIOD TOTAL BiD SUM&IARy TO DATE TOTAL THIS PERIOD $61,366.45 $0.00 $61~366.45 TOTAL TO DAT~' $61,366.45 $61,366.45 ~OUNT RETAINED $3 068 32 MATERIAL DEDUCT $0 0~ $58,296.13 $61,306.45 $3,088.32 $0.00 $0.00 $o.0o 806550J-0071Payest ~1 2 APPLICATION AND CERTIFICATE FOR PAYMENT Page 1 of 2 TO (OWNER): City of Elk River - Pat Klaers PROJECT: Elk River Public Safety Facility APPLICATION #: CONSTRUCTION MANAGER: Kraus-Anderson Construction ZOO Grand Avenue Saint Paul, MN 5510Z ARCHITECT: Tushie Montgomery PERIOD FROM: 8/1/OZ PERIOD TO: 8/31/OZ CONTRACTOR'S PROJECT #7713 CONTRACT DATE SECTION CONTRACTOR/SUPPLIER CURRENT PAYMENT DUE 1 Dryden Excavation 57,997 5 Dryden Excavation 37,877 8 Kelleher Constr. 178,600 10 Serice Constr. 26,045 26 Steinbrecher 1,472 45 Collins Electric 33,250 Kraus-Anderson 45,840 0 0 0 0 0 0 0 0 0 0 0 TOTAL: 381,081 ARCHITECT'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising the above situation, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work is in accordance with the Contract Documents, and the Contractors are entitled to payment of the AMOUNT INDICATED. C~.struct!on ~Manager: Kraus-Anderson Construction Co. Project: Elk River Public Safety Facility Address: 200 Grand Avenue St. Paul, MN 55102 Application Number: 1 Application Date: Aug 28, 2002 Owner: City of Elk River - Pat Klaers Period to: Aug 31, 2002 Project Number: 7713 Total Value Total Value Total of Net Due Balance To Revised of Work of Work Previous This Complete Bid Pkg# Description of Work Contractor Contract Adjustments Contract Completed Retainage Earned Payments Request Plus Retainage General Field Conditions Kraus-Anderson 295,680 0i 295,680 41,753 2,088: 39,665 0 39,665 256,015 Site demo/Earthwork Dryden Excavat 118,399 0 118,399 61,049 3,052 57,997 0 57,997 60~402 3 Bituminous Pavin~l Omann Bros 130,896 0 130,896 0 0 0 0 0 130,896 4 Concrete curb&~lutter Duncan Concr 176,000 O 176,000 O 0 O O O 1 76,OOO 5 Site Utilities Dryden Excavat 54,741 O 54,741 39,871 1,994 37,877 O 37,877 16,865 8 Concrete-Formwk,reinforc Kelleher Constr 343,647 0 343,647 188,000 9,400 178,600 O 178,600 165~O47 9 Precast Concrete Plank Molin Concrete 53,581 O 53,581 O O O O O 53,581 10 Concrete&Masonry Serice Constr 1,017,500 0 1,017,500 27,416 1,371 26,045: 0 26~045 991,455 11 Structural Steel,Joist,Deck Daka Corp 164,500 0 164,500 0 0 0 0 0 164,500 12 Erection of Structural Steel Western Steel 109,370 0 109,370 0 0 0 0 0 109,370 13 ~psum Dryw311 Re,Iai Contract 263,452 0 263,452 0 0 0 0 0 263,452 14 Rou~lh&Finish Carpentry George F Cook 390,900 0 390,900 0 0 0 0 0 390,900 ! 15 Waterproofin,q Kremer&Davis 21,000 0 Z1,000 0 0 0 0 0 Z1,000 16 Exterior Insul&Finish S~/stm Custom Dr)~rall 109,900 0 109,900 Oi 0 0 0 0 109,900 17 !Membrane Roof&Sheetmetal Weather Proof 118,637 0 118,637 0 0 0 0 0 118,637 18 Caulkin~ Carciofini Caulk 17,126 O 17,126 0 O O O 0 17,126 19 Hollow Metal&Wood Doors Glewwe Doors 54,925 0 54,925 0 O 0 O O 54,925 ZO Overhead Doors Garage Dr Store 25,750 O 25,750 0 O O 0 0 25,750 21 Alum Entrances&Windows Empirehouse 154,781 O 154,781 0 O O O 0' 154,781 23 Acoustical Treatments St Cloud Acoust 30,950 0 30,950 0 O 0 0 0 30,950 24 Concr Floor Coatin~l Conc Specialties 17,500 O 17,500 O 0 O O 0 17,5OO 26 Wallcovering&Pain ting Steinbrecher 1 OO,8OO O 100,800 1,550 78 1,472 0 1,472 99,328 27 Final Cleaning Ivarsden Meint 11,O80 O 11,080 0 O O 0 0 11,O80 28 Ext Bldg Signage Bartley Sales 7,700 0 7,700 0 O 0 0 0 7,700 29 Lockers Bartley Sales 65,280 0 65,280 O O O 0 0 65,280 39 Hydraulic Elevators Schindler Elev 71,380 O 71,380 O O O O 0 71,380 40 Plumbing&Hydr&Piping Northern Air 299,500 O 299,500 O O O O 0 299,500 41 Fire Protection Systems Tri-State Fire 53,200 0 53,200 0 0 0 0 0 53,200 42 Geothermal Loop Northern Air 290,000 0 290,000 O O O O O 290,OOO 43 HVAC&Ductwork Systems 5entra~Sota 245,600 0 245,600 O O O O 0 245,600 44 HVAC Control Systems Prairie Technol 38,385 0 38,385 0 O 0 0 0 38,385 45 Electrical Collins Electric 741,350 O 741,350 35,000 1,750 33,250 0 33,250 708,100 46 Test&Adiust&Balancing Systems Mgmt 9,740 O 9,740 0 O 0 O O 9,740 Constr Management Fee Kraus-Anderson 114,346 0 114,346 6,175 O 6,175 O 6,175 108,171 713 TOTAL 5,717,596 0 5,717,596 400,814 19,733 381,081 0 381,081 5,336,516 Page 1 AP. PLICATION AND CERTIFICATE FOR PAYMENT Page1 of 2 TO (OWNER): City of Elk River - Pat Klaers PROJECT: Elk River Public City Hall APPLICATION #: CONSTRUCTION MANAGER: Kraus-Anderson Construction ZO0 Grand Avenue Saint Paul, MN 55102 ARCHITECT: Tushie Montgomery PERIOD FROM: PERIOD TO: 8/1/02 8/31/O2 CONTRACTOR'S PROJECT #7751 CONTRACT DATE SECTION CONTRACTOR/SUPPLIER CURRENT PAYMENT DUE 7 Minnetonka Iron 3,800 ZZ Steinbrecher 1,140 38 Reliance Electric 10,21Zi Kraus-Anderson 2,625 0 Oi 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL: 17,777 ARCHITECT'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising the ~bove situation, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work is in accordance with the Contract Documents, and the Contractors are entitled to payment of the AMOUNT INDICATED. Construction Han~ger: Kraus-Anderson Construction Co. Project: Elk River City Hall AddresS. 200 Grand Avenue St. Paul. MN 55102 Application Number: 1 Application Date: Aug 28. 2002 Owner: City of Elk River - Pat Klaers Period to: Aug 31. 2002 Project Number: 7751 Total Value Total Value Total of Net Due Balance To Revised of Work of Work Previous This Complete Bid Pkg# Description of Work Contractor Contract Adiustments Contract Completed Retainage Earned Payments Request Plus Retainage General Field Conditions Kraus-Anderso 188.360 0 188.360 2.100 105 1.995 0 1.995 186.365 1 Select ive BIdg Demo George F Cook 144.000 Oi 144.000 0 0 0 0 0 144.000 2 Earthwork/Found Drainage Schluender Con 26.450 0 26.450 0 0 0 0 0 26.450 3 Concrete-Formwk.reinforc RHC Constructr 149.506 0 149.506 0 0 0 0 0 149.506 4 Precast Concrete Plank ~4olin Concrete 40.555 0 40.555 0 0 0 0 0 40.555 5 Concrete&~lasonr¥ Dakwood Bulld~ 208.600 0 208.600 0 0 0 0 0 208.600 7 Structural SteeI.Joist. Dec~ Hinnetonka Irol 76.074 0 76.074 4.000 200 3.800 0 3.800 72.274 8 [rection of Structural Stee Western Steel 78.275 0 78.275 0 0 0 0 0 78.275 91 Gypsum Drywalt Re,Iai Contract 266.812 0 266~812 0 0 0 0 0 266.812 10i Rough&Finish Carpentry Geor~le F Cook 304.700 0 304.700 0 0 0 0 0 304.700 11 i Waterproofin~l <remer&Davis 12.750 0 12.750 0 0 0 0 0 12.750 12!,Ext Insul&Finish System 31¥mpic Wall 48~650 0 48.650 0 0 0 0 0 48.650 13!Hembrane Roof&Sheetmeta Roof Tech 180.600 0 180.600 0 0 0 0 0 180.600 14j Hetal Roof&Prefab Specialty Systl S9.372 0 59.372 0 0 0 0 0 S9.372 15 Caulkin~l Carciofini Caul 12,080 0 12,080 0 0 0 0 0 12,080 16!Hol Iow I~etal&Wood Doors Glewwe Doors 43.400 0 43.400 0 0 0 0 0 43.400 71 Coilin~l Doors&Secur Grille Sara~le Dr Stor~ 12.555 g 12.555 0 0 0 0 0 12.555 1 18; Alum Entrances&Windows _~mpirehouse 111.905 0 111.905 0 (3 0 0 0 111.905 19: Ceramic Tile Twin City Tile 98.860 0 98.860 0 0 0 0 0 98.860 20i Acoustical Treatments Ceill%ls&Floor 48.485 0 48.485 0 (3 0 0 0 48.485 21 i Resil Floor&Carpeting Spectra Contra 74,600 0 74,600 0 (3 0 0 0 74.600 22 Wallcover lng&Paint ing Steinbrecher 76,800 0 76,800 1,200 60 1,140 0 1,14(3 75,660 23 Final Cleaning Harsden ivlaint 8.685 0 8.685 0 0 0 0 0 8.685 24 Exterior Bldg Signage Bartley Sales 4.541 (3 4.541 0 O! 0 0 0 4.541 28 Loading Dock Equipment V Anderson 5.300 0 5.300 0 0 0 0 0 5.300 33 Hydraulic Elevators Schindler Elev 44.760 0 44.760 0 0 0 0 0 44.760 34 Plumblng~Hydr&Piping Albers ~4echan 287.045 (3 287.045 0 0 0 0 0 287.045 35 Fire Protection Systems Tri-State Fire 27.200 0 27.200 0 0 0 0 0 27.200 36 HVAC&Ductwork Systems Yeidner Plumb 224.000 0 224.000 0 0 O~ 0 (3 224.000 37 HVAC Control Systems Prairie Techno 102.793 0 102.793 0 0 O! 0 0= 102.793 38 [lectrical Rel lance E lectr 384.672 0 384.672 10.750 538 10.212 0 10.212 374.460 39 Test&Adiust&Balancing Systems l~gmt 14.700 0 14.700 0 0 0 0 0 14.700 Constr Management Fee Kraus-Anderso 62,956 0 62,956 630 0 630 0 630 62,326 574 TOTAL 3,430,041 0 3,430,041 18,680 903 17,777 0 17,777 3,41Z,Z64 Page 1