8.0. SR 09-23-2002Ikiver MEMORANDUM Item ~ 8 TO: Mayor and City Council FROM: Pat Klaers, City Administrator DATE: September 23, 2002 SUBJECT: CIP Worksession Attached for your review is the first draft of the Capital Improvement Program (CIP) for the worksession on Monday, September 23, 2002. Also attached is a memo from Finance Director Lori Johnson, which explains the format of the CIP and the basis for how the material was put together. Lori did a great job of putting all of the information and requests from department heads into an understandable format for the City Council review and discussion on priorities. The Council is requested to note that this CIP is based on requests from department heads and that the city will very likely not be able to afford all of these requests. Individually, the requests from each department seem reasonable, but collectively it becomes very difficult to afford. Another point to note is that some projects will skew the bottom line or make the total expenditures seem out of proportion. Items such as the city hall remodeling/construction project in 2003 make the total expenditures for 2003 significantly more than 2004-07 years. Also the pavement rehabilitation program is an every other year project so this expenditure makes the 2003, 2005, and 2007 total amount seem high or conversely, the 2004 and 2006 expenditure totals seem low. Additionally, it is important to look at the source of funds for the projects in order to get a complete picture and understanding of what is taking place on a year-to-year basis. For example, some street projects may be entirely financed with MnDot or federal dollars and/or city MSA dollars, and there will be no use of city tax money or city reserves on the project. Accordingly, while the total for the street project (and the total expenditure for that year) may seem high, the source of funds for the project will make the situation acceptable. As the city is unlikely to be able to afford all of the requests, it should be acknowledged that some of 2003 requests will "slide" into 2004 requests. Also, projects and programs are constantly changing and this will lead department heads to make revisions to their requests next year, or the year beyond, etc. either because of changes due to technology, equipment breakdowns, or additional equipment being identified that would be beneficial to the department. One of the £mancial issues for the city relates to spending reserve monies that have limited additional revenues such as the equipment reserves or the capital project street reserve. Another concern the city has financially relates to the equipment certificates and keeping the tax impact consistent from year-to-year. A couple of additional items to note includes the large one time expenditures for equipment items such as the frre trucks; the number and type of police vehicles being annually requested; and how the city can afford the ice arena floor improvement when the ice arena fund is not sufficient to pay its current bonds. Finally, two items to note include the lack of major park land or park development expenditures and this may lead us to believe that a referendum is appropriate at some time in the future. Also, funds need to be identified in case the county ever moves the fairgrounds and the city desires to purchase this property for the expansion of the city campus/park area. MEMORANDUM TO: FROM: Mayor and City Council Lori Johnson, Finance Director DATE: September 23, 2002 SUBJECT: Discuss Draft Five-Year Capital Improvement Plan The Financial Management Plan adopted earlier this year addresses the need to have a five- year Capital Improvement Plan (CIP) approved by the City Council each year. Attached is the fLrst draft of the CIP for the years 2003-2007. The draft plan also includes data for the years 2008-2012 to help give a long term prospective to the City's capital needs. After the Council has had a chance to review and revise the draft CIP, it will be put on a future agenda for final approval before the end of the year. Before reviewing the details of the CIP, a brief summary of the source of the data, the parameters used, and the new format will be helpful in understanding the document. The f~rst step in the process was to have all department heads, the city administrator, and the city engineer submit their capital requests for at least the next five years and longer if possible. In order to be considered a capital asset, the equipment, machinery, building, improvement, or other asset must have a value of more than $7,500 and a useful life of at least two years. The attached draft CIP was generated based on the requests and comments submitted this summer by the staff noted above. Therefore, other than a few changes by the City Administrator, the data remains as submitted. The data is categorized several ways: 1. Year requested. 2. Department. 3. Category - e.g. vehicles, equipment, buildings, land, park improvements, and etc. 4. Funding source. 5. Priority (priority 1 means the project is critical, 2 is high priority, 3 is important, 4 is low priority, and 5 is future consideration). A project name and number are assigned to each project as well. Because the information is categorized many ways, there are also many formats in which the CIP can be printed. I have provided the reports that I thought are easiest to understand while still providing the necessary information. For each of the five-year plans, the information is presented in the following formats: 1. Projects by Year. 2. Category Summary. 3. Category Summary by Department. 4. Projects by Department and Expenditure Type. 5. Sources of Revenue Summary. 6. Projects by Funding Source. 7. Detail by Project. As I stated earlier, the draft plan includes all of the requests submitted along with justification comments if provided. Unless the submittal included a priority ranking, I assigned one. Suggested funding sources have been identified but may change for many of the requests due to budget issues and funds available at the time of the project. The next draft of the CIP will include additional financial information to the extent it is available including projected balances for the various funding sources. At Monday's meeting we will review the proposed requests and discuss potential funding sources. Of course, ultimately, the requests need to correspond to the funds available. Once the Council pfioritizes the requests, the funding side of the plan will become more defined. Additional changes may be required after the Council prioritizes the requests depending upon available funds. Action Requested At this point, the Council should review the requests, add, delete, and change as needed, and assign a priority to each request with attention given to the 2003-2007 projects. Action to approve the final Capital Improvement Plan will be requested at a future meeting after all of the Council's changes have been incorporated. CAPITAL PLAN City of Elk River, Minnesota PROJECTS BY YEAR 2OO3 thru 2OO7 Project Name Department Project # Priority Project Value 2003 Outdoor Warning Sirens Shop Equipment Vehicle Replacement Dodge Avenue Street Improvements nodh of 5th St.' Highland Road Improvements Annual Street Overlay Program - Not Assessed Assessable Street Overlay Projects Pavement Management Program Annual Street Seatcoat Program Land Acquisition Park Development Park Development - Youth Athletic Complex Park Landscaping and Grounds Improvements Trail Development Playground Structures and Improvements Marked Squad Replacement & Additions Office Equipment City Hall Expansion Small Theater at lSD 728 High School JetNacuum truck Scum Pit Covers Buildings Vehicle Replacement - pickup trucks Dump Truck Replacement Heavy Equipment Replacement Other Equipment Replacement Street Depadment Buildings 2OO4 Vehicle Replacement Fire Truck Replacement- Grass Rigs Main Street Intersection Improvements at Hwy 10 Annual Slreet Overlay Program- Not Assessed Assessable Street Overlay Projects Annual Street Sealcoat Program Park Development Emergency Preparedness Equipment Services Fire Infrastructure Im Infrastructure Im 'Infrastructure Im Infrastructure Im Infrastructure Im Infrastructure Im Library Park Dedication Park Dedication Park Dedication Park Dedication Park Dedication Police Police Public Buildings Recreation/Culture Sewer Department Sewer Department Sewer Department Streets Streets Streets Streets Streets 3rovements 3rovements 3rovements 3rovements 3rovements 3rovements EP-01 3 14,300 EQ-01 3 37,600 FD-01 3 32,000 11-08 4 150,000 11-09 2 50,000 OV-02 3 25,000 OV-03 3 100,000 PM-01 2 1,000,000 SC-02 3 60,000 LB-01 3 150,000 PF-61 3 10,0OO PF-62 5 . 20,000 PF-63 3 31,200 PF-64 3 9,700 PF-71 _3 10,000 PD-01 3 205,700 PD-05 3 37,400 BL-02 2 3,500,000 CR-90 3 112,600 WW-03 1 250,000 WW-04 3 8,000 WW-05 2 20,00O ST-01 3 25,050 ST-02 3 40,000 ST-03 3 155,650 ST-.04 3 0 ST-09 3 50,000 Total for 2003 6,104,200 Building & Environmental BZ-01 3 21,000 Fire FD-02 3 45,000 Infrastructure Improvements 11-07 2 541,812 Infrastructure Improvements OV-02 3 25,000 Infrastructure Improvements OV-03 3 0 Infrastructure Improvements SC-02 3 60,000 Park Dedication PF-61 3 10,000 Page I of 3 Friday, September 13, 2002 Project Name Department Project # Priority Project Value Park Development - Youth Athletic Complex Park Landscaping and Grounds Improvements Playground Structures and Improvements Marked Squad Replacement & Additions Unmarked Squad Replacement & Additions CSO Vehicle Replacement & Additions Office Equipment Small Theater at ISD 728 High School Lift Station Rehabilitation Buildings Vehicle Replacement Dump Truck Replacement Heavy Equipmenl Replacement Other Equipment Replacement 2005 Fire Truck Replacement- Engines Replace Arena Floor in Barn Annual Street Overlay Program - Not Assessed Assessable Street Overlay Projects Pavement Management Program Annual Street Sealcoat Program Park Development Park Development - Youth Athletic Complex Trail Development Playground Structures and Improvements Park Maintenance Equipment Marked Squad Replacement & Addilions Unmarked Squad Reptacemenl & Additions CSO Vehicle Replacement & Additions Small Theater at lSD 7:28 High School Phosphorous Removal Digester Cover Replacement Vehicle Replacement - pickup trucks HeaW Equipment Replacement 2006 Fire Truck Replacement - Grass Rigs Annual Street Overlay Program - Not Assessed Assessable Street Overlay Projects Annual Street Sealcoat Program Westbound Liquor Store Park Development Park Development - Youth Athletic Complex Trail Development Playground Structures and Improvements Park Shelters Park Dedication PF-62 5 20,000 Park Dedication PF-63 3 9,600 Park Dedication PF-71 3 30,000 Police PD-01 3 32,000 Police PD-02 3 75,000 Police PO-03 3 26,000 Police PD-05 3 15,000 Recreation/Culture CR-90 3 112,600 Sewer Department WW-02 3 30,000 Sewer Department WW-05 2 25,000 Sewer Department WW-06 2 25,000 Streets ST-02 3 135,000 Streets ST-03 3 90,000 Streets ST-04 3 15,0OO Total for 2004 1,343,012 Fire FD-03 3 375,000 Ice Arena PB-06 3 500,000 Infrastructure Improvements OV-02 3 25,000 Infrastructure Improvements OV-03 3 100,0OO Infrastructure Improvements PM-01 2 1,250,000 Infrastructure Improvements SC-02 3 65,000 Park Dedication PF-61 3 10,0OO Park Dedication PF-62 5 20,000 Park Dedication PF-64 3 15,000 Park Dedication PF-71 3 30,000 Park Maintenance PK-01 3 55,000 Police PD-01 3 154,OOO Police PD-02 3 27,000 Police PD-03 3 26,000 Recreation/Culture CE-90 3 112,6OO Sewer Department WW-07 1 150,000 Sewer Department WW-08 1 325,000 Streets ST-01 3 25,000 Streets ST-03 3 150,000 Total for 2005 3,414,600 Fire FD-02 3 45,000 Infrastructure Improvements DY-02 3 25,000 Infrastructure Improvements OV-03 3 0 Infrastructure Improvements SC-02 3 65,000 Liquor Fund LS-02 5 1,500,000 Park Dedication PF-61 3 10,000 Park Dedication PF-62 5 20,000 Park Dedication PF-64 3 7,000 Park Dedication PF-71 3 10,0OO Park Dedication PF-81 3 25,000 Page 2 of 3 Friday, September 13, 2002 Project Name Department Project # Priority Project Value Land Acquisition Park Maintenance Equipment Office Equipment Marked Squad Replacement 8, Additions Lift Station Rehabilitation Vehicle Replacement Upgrade Alarm System Bar Screen Replacement Dump Truck Replacement Heaw Equipment Replacement Public Works Building Maintenance 2007 Fire Truck Replacement - Tankers Annual Street Overlay Program - Not Assessed Assessable street Overlay projects Pavement Management Program Annual Stre;t Sealcoat Program Library Expansion Park Development Park Development - Youth Athletic Complex Park Landscaping and Grounds Improvements Trail Development Unmarked Squad Replacement 8, Additions Lift Station Rehabilitation Vehicle Replacement Vehicle Replacement - pickup trucks Dump Truck Replacement GRAND TOTAL Park Dedication PF-90 3 200,000 Park Maintenance PK-01 3 42,000 Planning PN-01 3 8,000 Police PD-01 3 248,000 Sewer Department WW-02 3 55,000 Sewer Department WW-06 2 27,000 Sewer Department WW-09 2 80,000 Sewer Department WW-10 2 45,0OO Streets ST-02 3 150,000 Streets ST-03 3 20,000 Streets ST-11 3 50,000 Total for 2006 2,632,000 Fire FD-04 3 175,000 Infrastructure Improvements OV-02 3 25,000 Infrastructure Improvements OV-03 3 100,000 Infrastructure Improvements PM-01 2 1,500,000 Infrastructure Improvements SC-02 3 70,000 Library BL-05 5 1,000,000 Park Dedication PF-61 3 10,000 Park Dedication PF-62 5 20,000 Park Dedication PF-63 3 14,500 Park Dedication PF-64 3 15,000 Police PD-02 3 60,000 Sewer Department WW-02 3 50,000 Sewer Department WW-06 2 27,000 Streets ST-01 3 27,000 Streets ST-02 3 207,000 Total for 2007 3,300,500 16,794,312 Report criteria: Ail Project Types All Departments All Categories All Priority Levels All Enterprise Fund data All Other Funding Commitment data Page 3 of 3 Friday, September 13, 2002 Category CAPITAL PLAN City of Elk River, Minnesota CATEGORY SUMMARY 2003 thru 2007 2003 2004 2005 2006 2007 Total Future Building Maintenance 112,600 112.600 437,600 50,000 712,800 210,000 Buildings 3,570,000 25,000 500,000 1,525,000 1,000,000 6,620,000 4,275,000 Equipment 89,300 30,000 205,000 175,000 499,300 560,000 Heaw Equipment 445,650 225,000 150,000 170,000 207,000 1,197,650 1,030,000 Land 150,000 200,000 350,000 Park improvements 71,200 69,600 60,000 40,000 44,500 285,300 30,000 Street & Utility Construction 1,000,000 1,250,000 1,500,000 3,750,000 3,750,000 Street Construction 200,000 541,812 741,812 150,000 Street Maintenance 185,000 85,000 190,000 90,000 195,000 745.000 Trail improvements 9.700 15,000 7,000 15,000 46,700 Utilities 8,000 30,000 55,000 50,000 143,000 125,000 Vehicles 262,750 224,000 607,000 320,000 289,000 1,702,750 2,753,000 Total: 6,104,200 1,343,012 3,414,600 2,632,000 3,300,500 16,794,312 12,883,000 Report criteria: All Project Types All Departments All Categories All Priority Levels All Enterprise Fund data All Other Funding Commitment data Page 1 of 1 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota CATEGORY SUMMARY BY DEPARTMENT Department Category 2003 tlu-u 2007 2003 2004 2005 2006 2007 Total Futur Building & Environmental Vehicles Emergency Preparedness Equipment Equipment Services Equipment Fire Buildings Vehicles Ice Arena Buildings Infrastructure Improvements Street & Utility Construction Street Construction Street Maintenance Library Buildings Land Liquor Fund Building Maintenance Buildings Park Dedication Buildings Land Park Improvements Trail Improvements Park Maintenance Equipment Planning Equipment Police Total: 21 ,OO0 14,300 Total: 14,300 37,600 Toial: 37,600 32,000 45,000 375,000 45,000 175,000 Total: 32,000 45,000 375,000 45,000 175,000 21,000 81,000 21,000 81,000 14,300 14,300 37,600 37,600 2,250,OO0 672,000 1,380,000 672,000 3,630,000 500,000 500,000 Total: 500,000 500,000 1,0OO,O00 1,250,000 1,500,000 200,000 541,812 185,000 85,000 190,OO0 90,000 195,000 Total: 1,385,000 626,812 1,440,000 90,000 1,695,000 150,000 1,000,000 Total: 150,000 1 ,OOO,O00 1,500,000 Total: 1,500,000 25,000 200,000 71,200 69,600 60,000 40,000 44,500 9,700 15,000 7,000 15,000 Total: 80,900 3,750,000 3,750,000 741,812 150,000 745,000 5,236,812 3,900,000 Total: 1,000,000 150,000 1,150,000 Total: 1,500,000 10,000 1,500,000 IO,OOO 25,000 25,OO0 200,000 285,300 30,000 46,700 69,600 75,000 272,000 59,500 557,000 55,000 55,000 42,000 97,000 170,OO0 55,000 42,000 97,000 170,000 8,OOO 8,000 8,000 Page 1 of 2 Friday, September 13, 2002 Department Category 200:3 2004 2005 2006 2007 Total Futur Equipment Vehicles Public Buildings Buildings Recreation/Culture Building Maintenance Sewer Department Building Maintenance Buildings Equipment HeaW Equipment Utilities Vehicles Streets Building Maintenance Buildings Equipment HeaW Equipment Vehicles 37,400 15,000 52,400 205.700 133,000 207,000 248,000 60,000 853.700 1,200,000 Total: 243,100 148.000 207,000 248,000 60,000 906,100 1,200,000 3,500,000 3.500,000 Total: 3,500,000 3,500,000 112,600 112.600 112,600 337,800 Total: 112,600 112,600 112,600 337,800 325,000 325,000 200,000 20,000 25,000 45,000 150,000 125,000 275,000 390,000 250,000 250,000 8,000 30,000 55,000 50,000 143,000 125,000 25,000 27.000 27,000 79,000 62,000 Total: 278,000 80,000 475,000 207,000 77,000 1,117,000 777,000 50,000 50,000 50,000 50,000 2,000,000 15,000 15,000 195.650 225,000 150,000 170,000 207,000 947,650 1,030,000 25.050 25,000 27,000 77,050 30,000 Total: 270,700 240,000 175.000 220,000 234,000 1.139,700 3,060,000 GRAND TOTAL: 6,104.200 1.343,012 3,414,600 2,632.000 3.300,500 16,794,312 12,883,000 Report criteria: All Project Types All Departments All Categories All Priority Levels All Enterprise Fund data All Other Funding Commitment data Page 2 of 2 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota PROJECTS BY DEPARTMENT AND EXPENDITURE TYPE 2003 tlum 2007 Department Projectg Priority 2003 2004 2005 2006 2007 Total Buildings Ice Arena Replace Arena Floor in Barn Library Library Expansion Liquor Fund Westbound Liquor Store Public Buildings City Hall Expansion Sewer Department Buildings Streets Street Depadment Buildings Ice Arena Total Library Total Liquor Fund Total Public Buildings Total Sewer Department Total Streets Total Buildings Total Construction/Maintenance Infrastructure Improvements Main Street Intersection Improvements at Hwy 10 Dodge Avenue Street Improvements north of 5th St. Highland Road Improvements Annual Street Overlay Program - Not Assessed PB-06 3 500,000 500,000 500,000 500,000 BL-05 5 1,000,000 1,000,000 1,000,000 1,000,000 LS-02 5 1,500,000 1,500,000 1,500,000 1,500,000 8L-02 2 3,500,000 3,500,0~0 3,500,000 3,500,000 WW-05 2 20,000 25,000 45,000 20,000 25,000 45,000 ST49 3 50,000 50,000 50,000 50,000 3,570,000 25,000 500,000 1,500,000 1,000,000 6,595,000 11-07 2 541,812 541,812 11-08 4 150,000 150,000 11-09 2 50,000 50,000 OV-02 3 25,000 25,000 25,000 25,000 25,000 125,000 Page I of 4 Friday, September/.7, 2002 Department Project# Priority 2003 2004 2005 2006 2007 Total Assessable Street Overlay Proiects OV-03 Pavement Management Program PM-01 Annual S[reet Sealcoat Program SC-02 Infrastructure Improvements Total Park Dedication Trail Development Park Dedication Total Recreation/Culture Small Theater at lSD 728 High School Recreation/Culture Total PF-64 CR-90 Sewer Department Lift Station Rehabilitation WW-02 Scum Pit Covers WW-04 Digester Cover Replacement WW-08 Sewer Department Total Streets Public Works Building Maintenance Streets Total Construction/Maintenance Total Equipment Emergency Preparedness Outdoor Warning Sirens Emergency Preparedness Total Equipment Services Shop Equipment Equipment Services Total Park Maintenance Park Maintenance Equipment Park Maintenance Total Planning Office Equipment Planning Total Police ST-11 EP-01 EQ-01 PK-01 PN-01 3 100,000 0 100,000 0 100,000 300,000 2 1,000,000 1,250,000 1,500,000 3,750,000 3 60,000 60,000 65,000 65,000 70,000 320,000 1,395,000 625,912 1,440,000 90,000 1,695,000 5,236,812 3 9,700 15,000 7,000 15,000 46,700 9,700 15,000 7,000 15,000 46,700 3 112,600 112,600 112,600 337,800 112,000 112,000 112,600 337,800 3 30,000 55,000 50,000 135,000 3 8,000 1 325,000 325,000 8,000 30,000 325,000 55,000 50,000 468,000 3 50,000 50,000 ., 50,000 50,00~ 1,515,300 769,412 1,892,600 202,000 1,760,000 6,139,312 3 14,300 14,300 14,300 14,300 3 37,600 37,600 37,600 37,600 3 55,000 42,000 97,000 55,000 42,000 97,000 3 8,000 8,000 8,000 8,000 Page 2 of 4 Friday, September 13, 2002 Department Projec~ Priority 2003 2004 2005 2006 2007 Total DJ'rice Equipment PO-05 3 37,400 15,000 52,400 Police Total 37,400 15,000 52,400 Sewer Department JetNacuum truck WW-03 1 250,000 250,000 Phosphorous Removal WW-07 1 150,000 150,000 Upgrade Alarm System WW-09 2 80,000 80,000 Bar Screen Replacement WW-10 2 45,000 45,000 Sewer Department Total 250,000 150,000 125,000 525,000 Streets Dump Truck Replacement ST-02 Heavy Equipment Replacement ST-03 Other Equipmenl Replacement ST-04 Land Acquisition Library Land Acquisition 3 40,000 135,000 150,000 207,000 532,000 3 155,650 90,000 150,000 20,000 415,650 3 0 15,000 15,000 Streets Total 195,.650 240,000 150,000 170,000 207,000 962,650 Equipment Total 534,950 255,000 355,000 345,000 207,000 1,696,950 Library Total Park Dedication Land Acquisition Park Dedication Total Land Acquisition Total LB-01 3 150,000 150,000 150,000 150,000 PF-90 3 200,000 200,000 200,000 2O0,O00 150,000 200,000 350,000 Park Improvements Park Dedication Park Development Park Development - Youth Athletic Complex Park Landscaping and Grounds Improvements Play§round Structures and Improvements Park Shelters PF-61 3 10,000 10,000 10,000 10,000 10,000 50,000 PF-62 5 20,000 20,000 20,000 20,000 20,000 100,000 PF-63 3 31,200 9,600 14,500 55,300 PF-71 3 10,000 30,000 30,000 10,000 80,000 PF-81 3 25,000 25,000 Park Dedication Total 71,200 89,800 60,000 $5,000 44,500 310,300 71,200 89,600 00,000 65,000 44,500 310,300 Park Improvements Total Vehicles Building & Environmental Vehicle Replacement BZ-01 3 21,000 21,000 Pag~ 3 of 4 Friday, September 13, 2002 Department Projec~ Priority 2003 2004 2005 2006 2007 Total Building & Environmental Total 21,000 21,000 Fire Vehicle Replacement FO-01 3 32,000 32,000 Fire Truck Replacement- Grass Rigs FD-02 3 45,000 45,000 90,0~0 Fire Truck Replacement - Engines FD-03 3 375,000 375,000 Fire Truck Replacement - Tankers FD-04 3 175,000 175,000 Police Marked Squad Replacement & Additions Unmarked Squad Replacement & Additions CSO Vehicle Replacement & Additions Fire Total 32,000 45,000 375,000 45,000 175,000 672,000 Sewer Department Vehicle Replacement Police Total Sewer Department Total Streets Total PD-.01 3 205,700 32,000 154,000 248,000 639,700 PD-02 3 75,000 27,000 60,000 162,000 PO--03 3 26,000 26,000 52,000 WW-06 2 ST-01 3 205,700 133,000 207,000 248,000 60,000 853,700 25,000 27,000 27,000 79,000 25,000 27,000 27,000 79,000 25,050 25,000 27,000 77,050 25,050 25,000 27,000 77,050 Vehicles Total 262,750 224,000 607,000 320,000 289,000 1,702,750 Streets Vehicle Replacement- pick~ trucks GRAND TOTAL 6,104,200 1,343,012 3,414,600 2,632,000 3,300,500 16,794,312 Report criteria: All Project Types All Departments All Categories All Priority Levels All Enterprise Fund data All Other Funding Commitment data Page 4 of 4 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota SOURCES OF REVENUE SUMMARY 2003 thru 2007 Source 2003 2004 2005 2006 2007 Total Capital Equipment Reserve - Undesignated 51,900 51,900 Capital Projects - Assessment Revenue 100,000 0 100,000 0 100,000 300,000 Equipment Certificates 458,400 418,000 812,000 505,000 469,000 2,662,400 Federal Grants 300,000 300,000 General Fund Operating Budget 122,400 121,000 90,000 148,000 95,000 576,400 General Fund Reserve 50,000 50,000 Government Buildings Reserve 3,500,000 3,500,000 Ice Arena 500,000 500,000 Library 150,000 1,000,000 1,150,000 Liquor Fund 1,500,000 1,500,000 MnDOT Cooperative Funds 241,812 241,812 Municipal State Aid 333,333 416,667 500,000 1,250,000 NSP Reserve 112,600 112,600 112,600 337,800 Park Dedication 80,900 69,600 75,000 272,000 59,500 557,000 Sewer Fund 278,000 80,000 475,000 207,000 77,000 1,117,000 Special Assessments 483,333 416,667 500,000 1,400,000 Street Reserve 383,334 416,666 500,000 1,300,000 Total 6,104,200 1,343,012 3,414,600 2,632,000 3,300,500 16,794,312 Report criteria: All Project Types All Departments All Categories All Priority Levels All Enterprise Fund data All Other Funding Commitment data Page i of I Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota PROJECTS BY FUNDING SOURCE 2003 tlum 2007 Source Project~ Priority 2003 2004 2005 2006 2007 Total Capital Equipment Reserve - Undesign Outdoor Warning Sirens EP-01 Shop Equipment EQ-01 Capital Equipment Reserve - Undesignated Total Capital Projects - Assessment Revenue Assessable Street Overlay Projects Capital Projects - Assessment Revenue Total OV-03 Equipment Certificates Vehicle Replacement FD-01 Fire Truck Replacement - Grass Rigs FD-02 Fire Truck Replacement - Engines FD-03 Fire Truck Replacement - Tankers FD-04 Marked Squad Replacement & Additions PD-01 Unmarked Squad Replacement & Additions PD-02 CSO Vehicle Replacement & Additions PD-03 Park Maintenance Equipment PK-01 Vehicle Replacement - pickup trucks ST-01 Dump Truck Replacement ST-02 HeaW Equipment Replacement ST-03 Other Equipment Replacement ST-04 Equipment Certificates Total Federal Grants Main Street Intersection Improvements at Hwy 10 Federal Grants Total 11-07 General Fund Operating Budget Vehicle Replacement BZ-01 Annual Street Oveday Program - Not Assessed OV-02 Office Equipment PD-05 Office Equipment PN-01 3 14,300 14,300 3 37,600 37 3 3 3 3 Page 1 of 3 51,900 51,900 100,000 0 100,000 0 100,000 300,000 100,000 0 100,000 0 100,000 300,000 32,000 32,000 45,000 45,000 90,000 375,000 375,000 175,000 175,000 205,700 32,000 154,000 248,000 639,700 75,000 27,000 60,000 162,000 26,000 26,000 52,000 55,000 42,000 97,000 25,050 25,000 27,000 77,050 40,000 135,000 150,000 207,000 532,000 155,650 90,000 150,000 20,000 415,650 0 15,000 15,000 458,400 418,000 812,000 505,000 469,000 2,662,400 300,000 300,000 300,000 300,000 21,000 25,000 25,000 37,400 15,000 25,000 21,000 25,000 25,000 125,000 52,400 8,000 8,000 Friday, September ]3, 2002 Source ProjectO Priority 2003 2004 2005 2006 2007 Total Annual Street Sealcoat Program Public Works Building Maintenance General Fund Operating Budget Total General Fund Reserve Street Department Buildings General Fund Reserve Total Government Buildings Reserve City Hall Expansion Government Buildings Reserve Total Ice Arena Replace Arena Floor in Barn Ice Arena Total Library Library Expansion BL-05 Land Acquisition LB-01 Library Total Liquor Fund Westbound Liquor Store LS-02 Liquor Fund Total MnDOT Cooperative Funds Main Street Intersection Improvements at Hwy 10 11-07 MnDOT Cooperative Funds Total Municipal State Aid Pavement Management Program PM-01 Municipal State Aid Total NSP Reserve Small Theater at lSD 728 High School CR-90 NSP Reserve Total Park Dedication Park Development Park Development - Youth Athletic Complex Park Landscaping and Grounds Improvements Trail Development SC-02 3 60,000 60,000 65,000 65,000 70,000 320,000 ST-11 3 50,000 50,000 ST-09 3 BL-02 2 PB-06 3 PF-61 PF-62 PF-63 PF-64 122,400 121,000 90,000 148,000 95,000 576,400 50,000 50,000 50,000 50,000 3,500,000 3,500,000 3,500,000 3,500,000 500,000 500,000 500,000 500,000 1,000,000 1,000,000 150,000 150,000 150,000 1,000,000 1,150,000 1,500,000 1,500,000 1,500,000 1,500,000 241,812 241,812 241,912 241,812 333,333 416,667 500,000 1,250,000 333,333 416,667 500,000 1,250,000 112,600 112,600 112,600 337,8C0 112,600 112,600 112,600 337,800 3 10,000 10,000 10,000 10,000 10,000 50,000 ~ 20,000 20,000 20,000 20,000 20,000 100,000 3 31,200 9,600 14,500 55,300 3 9,700 15,000 7,000 15,000 46,700 Page 2 of 3 Friday, September 13, 2002 Source Projectg Priority 2003 2004 2005 2006 2007 Total Playground Slructures and Improvements PF-71 Park Shelters PF-81 Land Acquisition PF-90 Park Dedication Total Sewer Fund Lift Station Rehabilitation WW-02 JetNacuum truck WW-03 Scum Pil Covers WW-04 Buildings WW-05 Vehicle Replacement WW-06 Phosphorous Removal WW-07 Digester Cover Replacement WW-08 Upgrade Alarm System WW-09 Bar Screen Replacement WW-10 3 10,000 30,000 30,000 10,000 80,000 3 25,000 25,000 3 200,000 200,000 80,900 69,600 75,000 272,000 59,500 557,000 3 30,000 55,000 50,000 135,000 1 250,000 250,000 3 8,000 8,000 2 20,000 25,000 45,000 2 25,000 27,000 27,000 79,000 1 150,000 150,000 1 325,OOO 325,000 2 80,00O 8O,0OO 2 45,000 45,000 Sewer Fund Total 278,000 80,000 475,000 207,000 77,000 1,117,000 Special Assessments Dodge Avenue Street Improvements north of 5th St. Pavement Management Program 11-08 PM-01 11-09 PM-01 Special Assessments Total Street Reserve Highland Road Improvements Pavement Management Program 4 150,000 150,000 2 333,333 416,667 500,000 1,250,000 Street Reserve Total 483,333 416,667 500,000 1,400,000 50,000 50,000 333,334 416,666 500,000 1,250,000 383,334 416,666 500,000 1,300,000 6,104,200 1,343,012 3,414,600 2,632,000 3,300,500 16,794,312 GRAND TOTAL Report criteria: All Project Types All Departments All Categories All Priority Levels All Enterprise Fund data All Other Funding Commitment data Page 3 of 3 Friday, September ]3, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru 2007 Project # BZ-O1 Project Name Vehicle Replacement Enterprise Fund no Other Funding Commitment no Description Contact Building & Env. AdmAn. Department Building & Environmental Type Vehicle Useful Life 10 years Category Vehicles Priority 3 Important Total Project Cost $102,000 Purchase replacement tracks for building inspectors as follows: 2004 - 4 wheel drive pickup track 2009 - 4 wheel drive pickup truck 2010 - 4 wheel drive pickup truck 2011 - 4 wheel drive pickup truck Justification Prior Expenditures  Vehicles 2003 2004 2005 2006 2007 21,000 Total Future 21,000 I 81,0001 Total Total 21 21,000 Total Prior Funding Sources [ 0 ] General Fund Operating Budge{ 2003 2004 2005 2006 2007 Total Future 21',ooo 2~,ooo [ 81,ooo! Total Total 21,000 ~1,ooo Total Page 1 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # EP-O1 Project Name Outdoor Warning Sirens Enterprise Fund Other Funding Commitment :Description 2007 Contact Fire Chief Department Emergency Preparedness I Type Equipment Useful Life 15 years J Category Equipment Priority 3 Important Total Project Cost $14,300 2003 - 221st and Watson Justification Expenditures 2003 2004 2005 2006 2007 Total Equipment 14,300 14,300 Total 14,300 14,300 Funding Sources 2003 2004 2005 2006 2007 Total Capital Equipment Reserve- Un 14,300 14,300 Total 14,300 14,300 Page 2 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 ~m 2007 Project # EQ-O1 Project Name Shop Equipment Enterprise Fund no Other Funding Commitment no Description Purchase shop equipment for diagnostic and repair services: 2003 - Brake Lathe 2003 - Truck Lift & Jack Stands Contact Street Supt. Department Equipment Services Type Equipment Useful Life 20 years Category Equipment Priority 3 Important Total Project Cost $37,600 Justification Expenditures 2003 2004 2005 2006 2007 Total Equipment 37,600 37,600 Total 37,600 37,600 Funding Sources 2003 2004 2005 2006 2007 Total Capital Equipment Reserve - Un 37,600 37,600 Total 37,600 37,600 Page 3 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 ~ 2007 Project # FD-01 Project Name Vehicle Replacement Enterprise Fund no Contact Fire Chief Department Fire TYl)e Vehicle Useful Life 10 years Category Vehicles Priority 3 Important Other Funding Commitment no Description Replace fire chief and inspector vehicles as follows: 2003 - inspector SUV 2009 - chief SUV 2012 - inspector SUV 2017 - chief SUV Total Project Cost $157,000 Justification I The fire chief and fire inspector's vehicles are used for everyday general use along with response to emergency incidents. After a period of 7-9 years, safety for emergency response becomes an issue with the vehicles. Expenditures 2003 2004 2005 2006 2007 Total Future Vehicles 32,000 32,000 ~ Total 32,000 32,000 Total Funding Sources 2003 2004 2005 2006 2007 Total Future Equipment Certificates 32,000 32,000 ~ Total 32,000 32,000 Total Page 4 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # FD-02 Project Name Fire Truck Replacement - Grass Rigs Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Fire Chief Fire Equipment 15 years Vehicles 3 Impo~lant $140,000 Grass Rig replacements as follows: 2004 - Grass Rig 2 2006 - Grass Rig 1 2018 - Grass Rig 2 Justification The grass rigs are 4X4 l-ton vehicles that are used during emergency response for various responses besides grass fires. The emergency response and safety become a factor during the expected life of the vehicles. Expenditures 2003 2004 2005 2006 2007 Total Future Total ~,ooo 4~,ooo ~o,ooo Total Funding Sources 2003 2004 2005 2006 2007 Total Future Equipment Certificates 45,000 45,000 90,000 I 50,000 Total 45,ooo 45,00o 90,0oo Total Page 5 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # FD-03 Project Name Fire Truck Replacement - Engines Enterprise Fund no Other Funding Commitment no Description 1 2007 Contact Department Type Useful Life Category Priority Total Project Cost Fire Chief Fire Vehicle 25 years Vehicles 3 Important $375,000 Fire Engine replacements as follows: 2005 - Engine 2 Justification Engine 2 will become the first engine out of station 2 when it opens in 2003. The replacement truck will be assigned to station 2 so there will be two pumpers in that station until old engine 2 is removed from service. Expenditures 200:5 2004 2005 2006 2007 Total Vehicles 375;000 375,000 Total 375,000 375,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 375,000 375,000 Total 375,000 375,000 Page 6 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru 2007 Project # FD-04 Projeet Name Fire Truck Replacement - Tankers Enterprise Fund no Contact Fire Chief Department Fire Type Vehicle Useful Life 20 years Category Vehicles Other Funding Commitment no Description Fire Tanker replacement as follows: 2007 - Tanker 1 2010 - Tanker 2 - Refurbish 2015 - Tanker 2 Priority 3 Important Total Project Cost $400,000 Justification If possible, tanker 1 will be refurbished (new chassis and refurbished tank) instead of purchasing a new tanker. Expenditures 2003 2004 2005 2006 2007 Total Future Vehicles 175,000 175,000 [ 225,000 Total 175,0o0 175,00o Total Funding Sources 2003 2004 2005 2006 2007 Total Future Equipment Certificates 175,000 175,000 Total 175,000 175,000 Total Page 7 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # PB-06 Project Name Replace Arena Floor in Barn Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Ice Arena Manager Ice Arena Building 25 years Buildings 3 Important $$00,000 Replace floor in Barn. Justification Current floor is 25 years old. There have been several leaks that have been repaired. There is the potential for a major leak that would jeopardize the ice, possibly resulting in lost revenues. Expenditures 2003 2004 2005 2006 2007 Total Buildings 500,000 500,000 Total 5oo,ooo 500,000 Funding Sources 2003 2004 2005 2006 2007 Total Ice Arena 500,000 500,000 Total Page 8 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # II-07 Project Name Main Street Intersection Improvements at Hwy 10 Enterprise Fund no Other Funding Commitment no Description 2007 Contact Engineer Department Infrastructure Improvements Type Improvement Useful Life 99 years ~l Category Street Construction Priority 2 High Priority Total Project Cost $691,812 Modify intersection to improve traffic flow. Justification · Expenditures 2003 2004 2005 2006 2007 Total Future Construction & Overhead (28%) 541,812 541312 ~ Total 541,812 541,812 Total Funding Sources 2003 2004 2005 2006 2007 Total Future Federal Grants 300,000 300,000 ~ MnDOT Cooperative Funds 241312 241,812 Total Total 541,812 541,812 Page 9 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 Project # II-08 Project Name Dodge Avenue Street Improvements north of 5th St. Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Infrastructure Improvements Improvement 25 years Street Construction 4 Low Priority $150,000 Fimsh widening Dodge Avenue between Elk Hills Drive and 5th Street. Includes sidewalk on East side of street. Estimated construction 2003 but may be as late as 2005. Justification Expenditures 2003 2004 2005 2006 2007 Total Construction & Overhead (28%) 150,000 150,000 Total lSO,OOo 15o,ooo Funding Sources 2003 2004 2005 2006 2007 Total Special Assessments 150,000 150,000 Total 150,000 150,000 Page 10 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # II-09 Project Name Highland Road Improvements Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Engineer Infrastructure Improvements Improvement 20 years Street Construction 2 High Priority $50,000 Add sidewalk to Highland Road between Proctor and Jackson. Justification Expenditures 2003 2004 2005 2006 2007 Total Construction/Maintenance 50,000 50,000 Total 5o,ooo 5o,ooo Funding Sources 2003 2004 2005 2006 2007 Total Street Reserve 50,000 50,1300 Total ~o,ooo 5o, ooo Page l I of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, M/nnesota 2003 thru Project # OV-02 Project Name Annual Street Overlay Program - Not Assessed Enterprise Fund no Other Funding Commitment no Description ] 2007 Contact Department Type Useful Life Category Priority Total Project Cost Street Supt. infrastructure Improvements Improvement 15 years Street Maintenance 3 Important $150,000 Overlay streets identified by Street Superintendent and Engineer. Justification ] Prior Expenditures [ 25,000 ] Construction/Maintenance 2003 2004 2005 2006 2007 Total 25,000 25,000 25,000 25,000 25,000 125,000 Total Total 25,000 25,000 25,000 25,000 25,000 125,000 Prior Funding Sources [ 25,000 1 General Fund Operating Budget 2003 2004 2005 2006 2007 Total 25,000 25,000 25,000 25,000 25,000 125,000 Total Total 25,000 25,000 25,000 25,000 '125,000 Page 12 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # OV-03 Project Name Assessable Street Overlay Projects 2003 Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Street Supt. Infrastructure Improvements Improvement 15 years Street Maintenance 3 Important $300,000 Street overlay projects that are assessable to benefitting properties. Justification Prior Expenditures [ 0 1 Construction/Maintenance 2003 2004 2005 2006 2007 Total 100,000 0 100,000 0 100,000 300,000 0 100,000 0 100,000 300,000 Total Total 100,000 Prior Funding Sources ~ Capital Projects - Assessment R 2003 2004 2005 2006 2007 Total 100,000 0 100,000 0 100,000 300,000 Total Total 100,000 0 100,000 0 100,000 300,000 Page 13 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # PM-O1 Project Name Pavement Management Program Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Infrastructure Improvements Improvement 25 years Street & Utility Construction 2 High Priority $7,500,000 Replace aged and deteriorated streets, water mains, sewer mains, storm drainage, and pedestrian pathways. Justification Expenditures 2003 2004 2005 2006 2007 - Total Future Construction & Overhead (28%) 1,000,000 1,250,000 1,500,000 3,750,000 ~ Total 1,000,000 1,250,000 1,500,000 3,150,000 Total Funding Sources 2003 2004 2005 2006 2007 Total Future Municipal State Aid 333,333 416,667 500,000 1,250,000 [ 3,750,000 Special Assessments 333,333 416,667 500,000 1,250,000 Total Street Reserve 333,334 416,666 500,000 1,250,000 Total 1,000,000 1,250,000 1,500,000 3,750,000 Page 14 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # SC-02 Project ~me Annual Street Seaicoat Program 2OO3 Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Street Supt. Infi'astmcture Improvements Improvement 3 years Street Maintenance 3 Important $415,000 Sealcoat streets as identified by Street Superintendent. Justification Prior Expenditures 95:0001 Construction/Maintenance 2003 2004 2005 2006 2007 Total 60,000 60,000 65,000 65,000 70,000 320,000 Total Total 60,000 80,000 65,000 65,000 70,000 320,000 Prior Funding Sources I 95,000 ] General Fund Operating Budget 2003 2004 2005 2006 2007 Total 60,000 ~,000 65,000 ~,000 70,000 320,000 Total Total 6o,ooo 60,000 65,000 65,000 70,000 320,000 Page 15 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # BL-05 Project Name Library Expansion Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost City Administrator Library Building 99 years Buildings 5 Future Consideration $1,000,000 Expand public library to accommodate public need. Justification Expenditures 2003 2004 2005 2006 2007 Total Future Buildings 1,000,000 1,000,000 ~ Total 1,ooo,ooo 1,ooo,ooo Total Funding Sources 2003 2004 2005 2006 2007 Total Library 1,000,000 1,000,000 Total 1,ooo,ooo 1,ooo,ooo Page 16 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # LB-01 Project Name Land Acquisition Enterprise Fund no Other Funding Commitment no Description 2007 Contact City Administrator Department Library Type Land Useful Life Unlimited Category Land Priority 3 Important Total Project Cost $150,000 Purchase land around existing library to allow for future expansion Justification Expenditures 2003 2004 2005 2006 2007 Total Land Acquisition 150,000 150,000 Total 150,000 150,000 Funding Sources 2003 2004 2005 2006 2007 Total Library 150,000 150,000 Total 150,000 150,000 Page 17 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # LS-02 Project Name Westbound Liquor Store Enterprise Fund yes Other Funding Commitment no Description Construct Westbound Liquor on site at Joplin and Hwy 10 2003 2007 Contact Department Type Useful Life Category Priority Total Project Cost Liquor Store Manager Liquor Fund Building 50 years Buildings 5 Furore Comideration $1,500,000 Justification Expenditures 2003 2004 2005 2006 2007 Total Buildings 1,fi00,000 1,500,000 Total 1,500,000 L~o0,000 Funding Sources 2003 2004 2005 2006 2007 Total Liquor Fund l,ff~0,000 1,§00,000 Total ~,500,000 1,500,000 Page 18 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 mm 2007 Project # PF-61 Project Name Park Development Description Enterprise Fund no Other Funding Commitment no 1 Contact Park & Rec. Director Department Park Dedication Type hnprovement Useful Lil~ 99 years Category Park Improvements Priority 3 Important Total Project Cost $60,000 Development of parks not fully developed Justification ] Expenditures 2003 2004 2005 2006 2007 Park Improvements 10,000 10,000 10,000 10,000 10,000 Total Future 50,000 I 10'000t Total 10,000 10,000 10,000 10,000 10,000 50,0OO Total Funding Sources 2003 2004 2005 2006 2007 Park Dedication 10,000 10,000 10,000 10,000 10,000 Total Furore 50,000 I 10,0001 Total 10,000 10,000 10,000 10,000 10,000 50,000 Total Page 19 of 50 Friday, September 13, 2002 CAPITAL PLAN 2003 City of Elk River, Minnesota Project # PF-62 Project ~me Park Development - Youth Athletic Complex Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Park & Rec. Director Park Dedication Improvement 99 years Park Improvements 5 Future Consideration Total Project Cost $120,000 Youth Athletic Complex - unidentified improvements. See playground and shelter catagories for other improvements at YAC. 1 Justification ] Expenditures 2003 2004 2005 2006 2007 Total Future Park Improvements 20,000 20,000 20,000 20,000 20,000 100,000 ~ Total 20,000 20,000 20,000 20,000 20,000 lOO,OO0 Total Funding Sources 2003 2004 2005 2006 2007 Total Future Park Dedication 20,000 . 20,000 20,000 20,000 20,000 100,000 ~ Total 20,000 20,000 20,000 20,000 20,000 100,000 Total Page 20 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # PF-63 Project Name Park Landscaping and Grounds Improvements Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Park & Rec. Director Park Dedication Improvement Park Improvements 3 Important Total Project Cost $55,300 Park landscaping and grounds improvements. Justification ] Expenditures 2003 2004 2005 2006 2007 Total Park Improvements 31,200 9,600 14,500 55,300 Total 31,200 9,600 14,500 55,300 Funding Sources 2003 2004 2005 2006 2007 Total Park Dedication 31,200 9,600 14,500 55,300 Total 31,200 9,600 14,500 55,300 Page 21 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # PF-64 Project ~n,e Trail Development Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Park & Rec. Director Park Dedication Improvement 10 years Trail Improvements 3 Important $46,700 Trail Improvements Justification Expenditures 2003 2004 2005 2006 2007 Total Construction/Maintenance 9,700 15,000 7,000 15,000 46,700 Total 9,700 15,000 1,000 15,000 48,700 Funding Sources 200:t 2004 2005 2006 2007 Total Park Dedication 9,700 15,000 7,000 15,000 46,700 Total 9,700 15,000 ?,000 15,000 46,700 Page 22 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 Project # PF-71 Project Name Playground Structures and Improvements Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Park & Rec. Director Park Dedication Improvement 10 years Park Improvements 3 Important $80,000 Install or replace playground structures as follows: 2003 - Country Crossing 3rd - full basketball court 2004 - YAC - playground structure 2005 - Hillside 5th - playground structure 2006 - Hillside 5th - basketball court Justification Expenditures 2003 2004 2005 2006 2007 Total Park Improvements 10,000 30,000 30,000 10,000 80,000 Total 10,000 30,000 30,000 10,000 80,000 Funding Sources 2003 2004 2005 2006 2007 Total Park Dedication 10,000 30,000 30,000 10,000 80,000 Total 10,000 30,000 30,000 10,000 80,000 Page 23 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 Project # PF-81 Project Name Park Shelters Enterprise Fund no Other Fundin~ Commitment no Description ] 2007 Contact Department Type Useful Life Category Priority Total Project Cost Park & Rec. Director Park Dedication Building 20 years Buildings 3 Important $50,000 Construct Park shelters as follows: 2006 - Meadowvale Heights 2008 - Meadowvale Heights Justification Expenditures 2003 2004 2005 2006 2007 Total Future Park Improvements 25,000 25,000[ 25,0001 Total 25,000 25,0oo Total Funding Sources 2003 2004 2005 2006 2007 Total Furore Park Dedication 25,000 Total 25,1100 25,000 Total Page 24 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # PF-90 Project Name Land Acquisition Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Park & Rec. Director Park Dedication Land Unlimited Land 3 Important $415,000 2002 - Grace Church property 2006 - 40 acres on CR 77 North of Ridgewood Others not identified Justification Prior Expenditures i 215,000 ] Land Acquisition 2003 2004 2005 2006 2007 Total 200,000 200,000 Total Total 200,000 200,000 Prior Funding Sources  Park Dedication 2003 2004 2005 2006 2007 Total 200,000 200,000 Total Total 200,000 200,000 Page 25 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # PK-O1 Project Name Park Maintenance Equipment Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Street Supt. Park Maintenance Equipment 10 years Equipment 3 important $267,000 Replace various park equipment as follows: 2005 - turf mower 2006 - zero turn mower 2006 - athletic field groomer 2006 - beach groomer 2009 - turf mower 2010 - athletic field groomer 2011 - zero turn mower 2012 - turf mower Justification Expenditures 2003 2004 2005 2006 2007 Total Future Equipment 55,1:)00 42,000 97,000 ~ Total 55,000 42,000 97,000 Total Funding Sources 2003 2004 2005 2006 2007 Total Future Equipment Certificates 55,000 42,000 97,000 Total 55,000 42,000 eT, ooo Total Page 26 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 ~m 2007 Project # PN-01 Project Name Office Equipment Enterprise Fund no Other Funding Commitment no Description Contact Planning Director Department Planning Type Equipment Useful Life 5 years Category Equipment Priority 3 Important Total Project Cost $8,000 2006 - Plotter Justification Expenditures 2003 2004 2005 2006 2007 Total Equipment 8,000 8,000 Total Funding Sources 2003 2004 2005 2006 2007 Total General Fund Operating Budget 8,000 8,000 Total 8,000 Page 27 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 mm 2007 Contact Department Police Chief Police Project # PD-01 I Useful Type Life Project Name Marked Squad Replacement & Additions ] Category Vehicle 3 years Vehicles Enterprise Fund no Priority Other Funding Commitment no Total Project Cost Description Routine replacement of vehicles at or near 100,000 miles. Includes all equipment and setup. 2003 - 5 replacement squads 3 Important $1,683,700 2003 -1 2004- 1 2005- 2 2006-5 2008-3 2009- 8 2010-1 2011- 2 2012- 8 CMV Enforcement Truck & Equipment replacement squad replacement squads; 1 additional squad; I replacement SUV replacement squads; I additional squad replacement squads replacement squads; I additional squad replacement squad replacement squads replacement squads Justification Prior Expenditures ~ Vehicles 2003 2004 2005 2006 2007 205,700 32,000 154,000 248,000 Total Future 639,Z00 I 1,044,0001 Total Total 205,700 32,000 154,000 248,000 639,7~ Totfl Prior Funding Sources [ 0 ] Equipment Certificates 2003 2004 2005 2006 2007 205,700 32,000 154,000 248,000 Total Future 639,700 ] 1,044,0001 Total To~l 205,7~ 32,000 154,000 248,000 639,?~ Tot~ Page 28 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # PD-02 Project Name Unmarked Squad Replacement & Additions Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Police Chief Police Vehicle 3 years Vehicles 3 Important $256,000 2004 - 3 replacement unmarked squads 2005 - I replacement unmarked squad 2007 - I replacement unmarked squad; I additional unmarked squad 2010 - 1 replacement unmarked squad 2011 - I replacement unmarked squad; I additional unmarked squad Justification Expenditures 2003 2004 2005 2006 2007 Total Future Vehicles 75,000 27,000 60,000 162,000 i- 194,000 ] Total ?5,0oo 27,oo0 60,000 162,000 Total Funding Sources 200:3 2004 2005 2006 2007 Total Future Equipment Certificates 75,000 27,000 60,000 162,000 [ ..... 94,000 Total 75,0OO 27,000 60,000 162,000 Total Page 29 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # PD-03 Project Name CSO Vehicle Replacement & Additions Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Police Chief Police Vehicle 10 years Vehicles 3 Important $114,000 CSO vehicle replacement and additions as follows: 2004 - pickup truck 2005 - mini van 2008 - pickup track 2009 - mini van Justification Expenditures 2003 2004 2005 2006 2007 Total Future Vehicles 26,000 26,000 52,000 ~ Total 26,000 28,000 52,000 Total Funding Sources 2003 2004 2005 2006 2007 Total Future Equipment Certificates 26,000 26,000 52,000 [ 62,000 Total 26,000 26,000 52,000 Total Page 30 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # PD-05 Project Name Office Equipment Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Police Chief Police Equipment 5 years Equipment 3 Important $52,400 2003 - Voice power dictation system including 22 recorders and 4 transcription stations. 2004 - Copy Machine Justification Expenditures 2003 2004 2005 2006 2007 Total Equipment 37,400 1§,000 52,400 Total 37,400 15,000 52,400 Funding Sources 2003 2004 2005 2006 2007 Total General Fund Operating Budget 37,400 15,000 52,400 Total 37,400 15,000 52,400 Page 31 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # BL-O1 Project Name Public Safety Building 2003 thru Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Police Chief Public Buildings Building 99 years Buildings 2 High Priority $8,000,000 Construct Public Safety building with space for police department, fire department station 2, and emergency operation center. Justification Prior Total Prior Total Page 32 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 ~ru Project # BL-02 Project Name City Hall Expansion Description Enterprise Fund no Other Funding Commitment no 2007 Contact City Administrator Department Public Buildings Type Building Useful Life 99 years Category Buildings Priority 2 High Priority Total Project Cost $3,500,000 Expand city hall to accommodate prosecuting attorney. Remodel existing city hall. Justification I Expenditu res 2003 2004 2005 2006 2007 Total Buildings 3,500,000 3,500,000 Total 3,500,000 3,500,000 Funding Sources 2003 2004 2005 2006 2007 Total Government Buildings Reserve 3,500,000 3,500,000 Total 3,500,000 3,500,000 Page 33 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, M/nnesota 2003 thru Project # CR-90 Project Name Small Theater at 1SD 728 High School Enterprise Fund no Other Funding Commitment yes Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost City Administrator Recreation/Culture Improvement 15 years Building Maintenance 3 Important $563,000 Contribution to small theater at Elk River High School. Justification Prior Expenditures ~ Construction/Maintenance 2003 2004 2005 2006 2007 Total 112,600 112,600 112,600 337,800 Total Total 112,600 112,600 112,600 337,800 Prior Funding SourCes i 112,600J NSP Reserve 2003 2004 2005 2006 2007 Total 112,600 112,600 112,600 337,800 Total Total 112,600 112,600 112,600 337,800 Page 34 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 ~ 2007 Project # WW-02 Project Name Lift Station Rehabilitation Enterprise Fund yes Contact Department Type Useful Life Category Priority Other Funding Commitment no Description 2004 - Lions Park 2006 - Evans Avenue 2007 - Royal Oaks or Dam Total Project Cost Engineer Sewer Department Improvement 15 years Utilities 3 Impotlant $260,000 2010 - Royal Oaks or Dam 2012 - Oldest lilt station Justification Prior Expenditures [__ 0_.] Construction/Maintenance 2003 2004 2005 2006 2007 30,000 55,000 50,000 Total Future 135,000 ~ Total Total 30,000 55,000 50,000 135,000 Total Funding Sources 2003 2004 2005 2006 2007 Sewer Fund 30,000 55,000 50,000 Total Future 135,000 ~ Total 30,000 55,000 50,000 135,000 Total Page 35 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 ~ 2007 Project # WW-03 Project Name Jet/Vacuum truck Enterprise Fund yes Other Funding Commitment no Description Replace current truck. Contact Department Type Useful Life Category Priority Chief Wastewater Operator Sewer Depa~ment Equipment 20 years Heavy Equipment 1 Critical Total Project Cost $250,000 Justification Expenditures 2003 2004 2005 2006 2007 Total Equipment 250,000 250,000 Total 250,000 250,000 Funding Sources 2003 2004 2005 2006 2007 Total Sewer Fund 250,000 250,000 Total 250,000 250,000 Page 36 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru 2007 Project # WW-04 Project Name Scum Pit Covers Enterprise Fund yes Other Funding Commitment no Description I Replace scum pit covers Contact Department Type Useful Life Category Priority Total Project Cost Chief Wastewater Operator Sewer Department Maintenance 20 years Utilities 3 Impoctant $8,000 Justification Expenditures 2003 2004 2005 2006 2007 Total Construction/Maintenance 8,000 8,000 Total 8,000 8,000 Funding Sources 2003 2004 2005 2006 2007 Total Sewer Fund 8,000 8,000 Total 8,ooo 8,ooo Page 37 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru ~'roject # WW-05 Project Name Buildings Enterprise Fund yes Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Chief Wastewater Operator Sewer Department Building 20 years Buildings 2 High Priority $45,000 2003 - 60' X 40' pole barn for storage at solids land. 2004 - new garage for storage at plant Justification J Expenditures 2003 2004 2005 2006 2007 Total Buildings 20,000 25,000 45,000 Total 20,000 25,000 45,000 Funding Sources 2003 2004 2005 2006 2007 Total Sewer Fund 20,000 25,000 45,000 Total 20,000 25,000 45,000 Page 38 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # WW-06 Project Name Vehicle Replacement Enterprise Fund yes Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Chief Wastewater Operator Sewer Department Vehicle 6 years Vehicles 2 High Priority $141,000 2004 - pickup replace 1992 Dodge 2006 - pickup replace 1998 Chevrolet 2007 - pickup replace 2001 Ford 2010 - pickup replace 2004 truck 2012 - pickup replace 2006 truck Justification ] Expenditures 2003 2004 2005 2006 2007 Total Furore Vehicles 25,000 27,000 27,000 79,000 ~ Total 25,000 27,000 27,000 79,000 Total Funding Sources 2003 2004 2005 2006 2007 Total Future Sewer Fund 25,000 27,000 27,000 79,000 Total 25,000 27,000 27,000 79,000 Total Page 39 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru 2007 Project # WW-07 Project Name Phosphorous Removal Enterprise Fund yes Other Funding Commitment no Description Contact Department Type Useful Life Category Priority Chief Wastewater Operator Sewer Department Equipment 15 years Equipment 1 Critical Total Project Cost $150,000 Install phosphorous removal equipment to meet requirements of new permit. Justification Expenditures 2003 2004 2005 2006 2007 Total Equipment 150,000 150,000 Total 150,000 150,000 Funding Sources 2003 2004 2005 2006 2007 Total Sewer Fund 150,000 150,000 Total 15o,0oo 150,0o0 Page 40 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Mmesota 2003 thru 2007 Contact Department Type Useful Life Category Project # Project Name WW-08 Digester Cover Replacement Enterprise Fund yes Other Funding Commitment no Description Priority Total Project Cost Replace primary digester covers that have exceeded their expected life. 2005 - Primary Digester Cover 2008 - Secondary Digester Cover Chief'Wastewater Operator Sewer Department Improvement 20 years Building Maintenance 1 Critical $525,000 Justification Expenditures 2003 2004 2005 2006 2007 Total Furore Construction/Maintenance 325,000 325,000 ~ Total 325,000 325,000 Total Funding Sources 2003 2004 2005 2006 2007 Total Furore Sewer Fund 325,000 325,000 Total 325,000 325,000 Total Page 41 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # WW-09 Project Name Upgrade Alarm System Enterprise Fund yes Other Funding Commitment no Description Upgrade alarm system at lffi stations. 2003 2007 Contact Department Type Useful Life Category Priority Total Project Cost Chief Wastewater Operator Sewer Department Equipment 15 years Equipment 2 High Priority $80,000 Justification Expenditures 2003 2004 2005 2006 2007 Total Equipment 80,000 80,000 Total 80,000 so,ooo Funding Sources 2003 2004 2005 2006 2007 Total Sewer Fund 80,000 80,000 Total 80,0OO 80,OO0 Page 42 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 ~ 2007 Project # WW-lO Project Name Bar Screen Replacement Enterprise Fund yes Other Funding Commitment no Description Contact ChiefWastewater Operator Department Sewer Department Type Equipment Useful Life 15 years Category Equipment Priority 2 High Priority Total Project Cost $45,000 Replace bar screen. Justification ] Expenditures 2003 2004 2005 2006 2007 Total Equipment 45,000 45,000 Total 4~,ooo 4~,ooo Funding Sources 2003 2004 2005 2006 2007 Total Sewer Fund 45,000 45,000 Total 45,OOO 4~,000 Page 43 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # ST-O1 Project Name Vehicle Replacement - pickup trucks Enterprise Fund no Other Fundin~ Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Street Supt. Streets Vehicle 15 years Vehicles 3 Important $107,050 Street department pickuptruck replacements. 2003- 1 Pickup Truck 2005- 1 2007-1 2009- I Justification Expendim res 2003 2004 2005 2006 2007 Total Future Vehicles 25,050 25,0O0 27,000 77,050i .....30,0001 Total 25,o5o 25,000 27,000 ??,050 Total Funding Sources 2003 2004 2005 2006 2007 Total Future Equipment Certificates 25,050 25,0O0 27,0o0 77,050l ......... 56160o] Total 25,o5o 25,000 21,000 77,050 Total Page 44 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru 2007 Project # ST-02 Project Name Dump Truck Replacement Enterprise Fund no Other Funding Conunitment no Description Contact Department Type Useful Life Category Priority Total Project Cost Street Supt. Streets Equipment 20 years Heavy Equipment 3 Important $1,197,000 Dump truck replacement and additions. Includes all plow equipment. 2003 - 1 1Ton Dump Truck 2007 - I I Ton Dump or Stake Truck 2011 - 1 1 Ton Dump Truck Justification Expenditures 2003 2004 2005 2006 2007 Total Future Equipment 40,000 135,000 1501000 207,000 532,000 ~ Total 40,000 135,000 150,000 207,000 532,000 Total Funding Sources 2003 2004 2005 2006 2007 Total Future Equipment Certificates 40,000 135,000 150,000 207,000 532,000 ~ Total 40,000 135,000 150,000 207,000 532,000 Total Page 45 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2003 thru Project # ST-03 Project Name Heavy Equipment Replacement Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Street Supt. Streets Equipment 20 years Heavy Equipment 3 Important $780,650 Heavy Equipment replacements & additions as follows: 2003 - front end loader with plow and wing 2003 - H.D. snow plow for loader 2004 - sidewalk plow 2005 - sweeper 2006 - skid loader 2008 - front end loader 2008 - grader 2010 - utility tractor 2010 - bucket track (used) Justification Expenditures 2003 2004 2005 2006 2007 Total Future Equipment 155,650 90,000 150,000 20,000 415,650 [ 365,0001 Total 155,650 90,000 150,1100 20,000 415,650 Total Funding Sources 2003 2004 2005 2006 2007 Total Future Equipment Certificates 155,650 90,000 150,000 20,000 415,650 Total 155,650 90,000 150,000 20,000 415,650 Total Page 46 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Other Equipment Replacement 2003 thru Project # ST-04 Project Name Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category PHoHty Total Project Cost Street Supt. Streets Equipment 10 years Equipment 3 Important $15,000 Replace other Street Department equipment as follows: 2003 - Infra-red asphalt patcher (Requested but not included in budget) 2004 - Trailer Justification Expenditures 2003 2004 2005 2006 2007 Total Equipment 0 15,000 15,000 Total 0 15,000 15,000 Funding Sources 2003 2004 2005 2006 2007 Total Equipment Certificates 0 15,000 15,000 Total 0 15,ooo 15,ooo Page 47 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # ST-09 Project ~me Street Department Buildings 2003 Enterprise Fund no Other Funding Commitment no Description 2007 Contact Department Type Useful Life Category Priority Total Project Cost Street Supt. Streets Building 25 years Buildings 3 Important $200,000 2002 - Build cold storage building for street department storage 2003 - Salt/Sand Shed Justification Prior Expenditures ~ Buildings 2003 2004 2005 2006 2007 Total 50,000 50,000 Total Total Prior Funding Sources il 150,0001 General Fund Reserve 2003 2004 2005 2006 2007 Total 50,000 50,000 Total 50,000 50,000 Total Page 48 of 50 ~ Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # Project Name ST-11 Public Works Building Maintenance Contact Street Supt Department Streets Type Improvement i Useful Life 25 years Category Building Maintenance Priority 3 Important Total Project Cost $$0,000 Enterprise Fund no Other Funding Commitment no Description Replace Building Roof 2003 thru 2007 Justification Expenditures 2003 2004 2005 2006 2007 Total Construction/Maintenance 50,000 50,000 Total 50,000 50,000 Funding Sources 2003 2004 2005 2006 2007 Total General Fund Operating Budget 50,000 50,000 Total 5o,ooo 50,000 Page 49 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Report criteria: All Project Types All Departments All Categories All Priority Levels All Enterprise Fund data All Other Funding Commitment data 2003 2007 Contact Department Street Supt. Streets Page 50 of 50 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota PROJECTS BY YEAR 2008 thru 2012 Project Name Department 2008 Fire Truck Replacement - Other Northbound Building Maintenance Park Development Park Development - Youth Athletic Complex Park Shelters Marked Squad Replacement & Additions CSO Vehicle Replacement 8, Additions Digester Cover Replacement Bio-Solids Heat Exchange Heavy Equipment Replacement 2009 Vehicle Replacement Vehicle Replacement Pavement Management Program Park Maintenance Equipment Marked Squad Replacement & Additions Heavy Equipment Mixing & Recirculating Pump Replacement Vehicle Replacement - pickq~ trucks Dump Truck Replacement 2010 Vehicle Replacement Fire Truck Replacement - Tankers Park Maintenance Equipment Marked Squad Replacement & Additions Unmarked Squad Replacement & Additions CSO Vehicle Replacement & Additions Plant Expansion Lift Station Rehabilitation Vehicle Replacement Upgrade Boiler Dump Truck Replacement Heavy Equipment Replacement Fire FD-05 3 230,0OO Liquor Fund LS-01 3 10,0OO Park Dedication PF-61 3 10,000 Park Dedication PF-62 5 20,000 Park Dedication PF-81 3 25,000 Police PD-01 3 105,000 Police PD-03 3 30,0OO Sewer Department WW-08 1 200,000 Sewer Department WW-11 3 80,000 Streets ST-03 3 275,000 Total for 2008 985,OOO Building & Environmental BZ-01 3 26,000 Fire FD-01 3 40,000 Infrastructure Improvements PM-01 2 1,750,000 Park Maintenance PK-01 3 60,000 Police PD-01 3 405,000 Sewer Department WW-12 5 150,0OO Sewer Department WW-13 2 75,000 Streets ST-01 3 30,000 Streets ST-02 3 215,000 Total for 2009 2,751,0OO Building & Environmental BZ-01 3 27,000 Fire FD-04 3 50,000 Park Maintenance PK*01 3 20,000 Police PD-01 3 50,000 Police PD-02 3 30,000 Police PD-03 3 32,000 Sewer Department WW-01 3 0 Sewer Department WW*02 3 60,000 Sewer Department WW*06 2 30,000 Sewer Department WW-14 2 125,000 Streets ST*02 3 185,000 Streets ST*03 3 90,000 Page 1 of 2 Friday, Sep[ember 13, 2002 Project Name Department Project # Priority Project Value 2011 Vehicle Replacement Pavement Management Program Park Maintenance Equipment Marked Squad Replacement & Additions Unmarked Squad Replacement & Additions Replace Generators Dump Truck Replacement 2012 Vehicle Replacement Fire Station ~- North Main Street Intersection Improvements at Hwy 10 Railroad Drive between Jackson and Main Evans Avenue South of Main Street Parking Lot Improvements Park Maintenance Equipment Marked Squad Replacement & Additions Community Center/Senior Center Lift Station Rehabilitation Vehicle Replacement Public Works Building Expansion Ditch 28 Improvements GRAND TOTAL Total for 2010 699,000 Building & Environmental BZ-01 3 28,000 Infrastructure Improvements PM-01 2 2,000,000 Park Maintenance PK-01 3 15,000 Police PO-01 3 100,000 Police PO-02 3 64,000 Sewer Department WW-15 3 110,000 Streets ST-02 3 265,000 Total for 2011 2,582,000 Fire FD-01 3 40,000 Fire FD-06 5 2,250,000 Infrastructure Improvements 11-07 2 150,000 Infrastructure Improvements 11-10 3 0 Infrastructure Improvements I1-11 3 0 Infrastructure Improvements PL-01 3 0 Park Maintenance PK-01 3 75,000 Police PD-01 3 384,000 Public Buildings BL-07 4 0 Sewer Department WW-02 3 65,000 Sewer Department WW-06 2 32,0OO Streets ST-10 3 2,000,000 Surface Water Management SW-10 3 0 Total for 2012 4,996,000 12,013,000 Report criteria: All Project Types All Departments All Categories All Priodty Levels All Enterprise Fund data All Other Funding Commitment data Page 2 of 2 Friday, September 13, 2002 Category 2008 CAPITAL PLAN City of Elk River, Minnesota CATEGORY SUMMARY 2008 thru 2012 2009 2010 2011 2012 Total Future Building Maintenance 210,000 210,000 Buildings 25,000 4,250,000 4,275,000 Equipment 80,000 135,000 145,000 125,000 75,000 560,000 Heavy Equipment 275,000 365,000 275,000 265,000 1,180,000 Park Improvements 30,000 30,000 Slreel & Utility Construction 1,750,000 2,000,000 3,750,000 Street Construction 150,000 150,000 Utilities 60,000 65,000 125,000 Vehicles 365,000 501,000 219,000 192,000 456,000 1,733,000 Total: 985,000 2,751,000 699,000 2,582,000 4,996,000 1,020,000 12,013,000 1,020,000 Report criteria: All Project Types All Departments All Categories All Priority Levels All Enterprise Fund data All Other Funding Commitment data Page 1 of 1 Friday, September 13, 2002 Department Calegory Building & Environmental Vehicles Fire Buildings Vehicles Infrastructure Improvements Stree! & Utility Construction Street Construction Liquor Fund Building Maintenance Park Dedication Buildings Park Improvements Park Maintenance Equipmenl Police Vehicles Sewer Department Building Maintenance Equipment Heaw Equipment Utilities Vehicles Streets Buildings Heavy Equipment Vehicles CAPITAL PLAN City of Elk River, Minnesota CATEGORY SUMMARY BY DEPARTMENT 2008 thru 2012 2008 2009 2010 2011 2012 Tot~ Futur 26,000 27,000 28,000 81,000 Total: 26,000 27,000 28,000 81,000 2,250,000 230,000 40,000 50,000 40,000 2,250,000 360,000 Total: 230,000 40,000 50,000 2,290,000 2,610,000 1,750,000 2,000,000 150,000 3,750,000 150,000 Total: 1,750,000 2,000,000 150,000 3,900,000 10,000 10,000 Total: 10,000 10,000 25,000 30,000 25,000 30,000 Total: 55,000 55,000 60,000 20,000 15,000 75,000 170,000 Total: 60,000 20.000 15,000 75,000 170,000 135,000 405,000 112,000 164,000 384,000 Total: 135,000 405,000 112,000 164,000 384,000 1,200,000 200,000 80,000 75,000 125,000 110,000 150,000 60,000 65,000 30,000 32,000 200,000 390,000 150,000 125,000 62,000 Total: 280,000 225,000 215,000 110,000 97,000 927,000 275,000 215,000 275,000 265,000 30,000 2,000,000 1,030,000 30,000 Total: 275,000 245,000 275,000 265,000 2,000,000 3,060,000 1,020,000 1,020,000 Page 1 of 2 Friday, September 13, 2002 Department Category 2008 2009 2010 2011 2012 Total Futur GRAND TOTAL: 985,000 2,751.000 699,000 2,582.000 4,996.000 12,013,000 1,020,000 Report criteria: All Project Types All Departments All Categories All Priority Levels All Enterprise Fund data All Other Funding Commitment data Page 2 of 2 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota PROJECTS BY DEPARTMENT AND EXPENDITURE TYPE 2008 thru 2012 Department Project~ Priority 2008 2009 2010 2011 2012 Total Buildings Fire Fire Station ~ - North Fire Total Streets Public Works Building Expansion Streets Total Buildings Total Construction/Maintenance Infrastructure Improvements Pavement Management Program Infrastructure Improvements Total Sewer Department Lift Station Rehabilitation Digester Cover Replacement Sewer Department Total Construction/Maintenance Total Equipment Fire Fire Station ~ - North Fire Total Park Maintenance Park Uainienance Equipment Park Maintenance Total Sewer Department Bio-Solids Heat Exchange FO-06 5 1,500,000 1,§00,000 1,500,000 1,500,000 ST-10 3 2,000,000 2,000,000 2,000,000 2,000,000 3,500,000 3,500,000 PM-01 2 1,750,000 2,000,000 3,750,000 1,750,000 2,000,000 3,750,000 WW42 3 60,000 65,000 125,000 WW-08 1 200,000 200,000 200,000 60,000 65,000 325,000 200,000 1,750,000 60,000 2,000,000 65,000 4,075,000 WW-11 3 80,000 80,000 Page 1 of 3 Friday, September 13, 2002 FD-06 5 750,000 750,000 750,000 750,000 PK-01 3 60,000 20,000 15,000 75,000 170,000 80,000 20,000 15,000 75,000 170,000 Department Projec~ Priority 2008 :2009 2010 2011 2012 Total Heavy Equipment Mixing & Recircuiating Pump Replacement Upgrade Boiler Replace Generators Sewer Department Total Streets Dump Truck Replacement HeaW Equipment Replacement Streets Total Equipment Total Land Acquisition Infrastructure Improvements Main Street Intersection Improvements at Hwy 10 Infrastructure Improvements Total Land Acquisition Total Other Liquor Fund Northbound Building Maintenance Liquor Fund Total WW-12 5 150,000 150,000 WW-13 2 75,000 75,000 WW-14 2 125,000 125,000 WW-15 3 110,000 110,000 80,000 225,000 125,000 110,000 540,000 $T-02 3 215,000 185,000 265,000 665,000 ST-03 3 275,000 90,000 365,000 275,000 215,000 275,000 265,000 1,030,000 355,000 500,000 420,000 390,000 825,000 2,490,000 11-07 2 150,000 150,000 150,000 150,000 150,000 150,000 · LS-01 3 10,000 10,000 10,000 10,000 Other Total 10,000 10,000 Park Improvements Park Dedication Park Development Park Development - Youth Athletic Complex Park Shelters PF-61 3 10,000 10,000 PF-62 5 20,000 20,000 PF-81 3 25,000 25,000 Park Dedication Total 55,000 55,000 55,000 55,000 BZ-01 3 26,000 27,000 28,000 81,000 26,000 27,000 28,000 81,000 Park Improvements Total Vehicles Building & Environmental Vehicle Replacement Building & Environmental Total Fire Vehicte Replacement Fire Truck Replacement - Tankers FD-01 3 40,000 40,000 80,000 FD-04 3 50,000 50,000 Page 2 o£ 3 Friday, September ]3, 2002 Department Project~ Priority 2008 2009 2010 2011 2012 Total Fire Truck Replacement- Other Fire Total Police Marked Squad Replacement & Additions Unmarked Squad Replacement & Additions CSO Vehicle Replacement & Additions Police Total Sewer Department Vehicle Replacement Sewer DePartment Total Streets Vehicte Replacement - pickup tracks Streets Total FO-05 3 230,000 230,000 230,000 40,000 50,000 40,000 360,000 PO-01 3 105,000 405,000 50,000 100,000 384,000 1,044,000 PO-02 3 30,000 64,000 94,000 PO-03 3 30,000 32,000 62,000 135,000 405,000 112,000 164,000 384,000 1,200,000 WW-06 2 30,000 32,000 62,000 30,000 32,000 62,000 ST-01 3 30,000 30,000 30,000 30,000 Vehicles Total 365,000 501,000 219,000 192,000 456,000 1,733,000 GRAND TOTAL 995,000 2,751,000 699,000 2,582,000 4,996,000 12,013,000 Report criteria: All Project Types All Departments All Categories All Priodty Levels All Enterprise Fund data All Other Funding Commitment data Page 3 of 3 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota SOURCES OF REVENUE SUMMARY 2008 thru 2012 Source 2008 · 2009 2010 2011 2012 Total Equipment Cedificates General Fund Operating Budget Liquor Fund Municipal State Aid Park Dedication Sewer Fund Special Assessments Storm Sewer Street Rese~e Tax Suppoded Bond Issue To Be Determined 750,000 457,000 26,000 27,000 583,333 55,000 280,000 225,000 215,000 583,333 583,334 444,000 499,000 2,790,000 28,000 81,000 10,000 666,667 150,000 1300,000 55,000 110,000 97,000 927,0C0 666,667 1,250,000 0 0 666,666 0 1,250,000 2,250,000 2,250,000 2,000,000 2,000,000 Total 985,000 2,751,000 699,000 2,582,000 4,996,000 12,013,000 Report criteria: All Project Types All Departments All Categories All Priority Levels All Enterprise Fund data All Other Funding Commitment data Page 1 of 1 Friday, Sep~mbcr 13, 2002 CAPITAL PLAN City of Elk River, Minnesota PROJECTS BY FUNDrNG SOURCE 2008 thru 2012 Source Project~ Priority 2008 2009 2010 2011 2012 Total Equipment Certificates Vehicle Replacement FD-01 Fire Truck Replacement - Tankers FD-04 Fire Truck Replacement- Other FD-05 Marked Squad Replacement 8, Additions PD-01 Unmarked Squad Replacement 8, Additions PD-02 CSO Vehicle Replacement & Additions PD-03 Park Maintenance Equipment PK-01 Vehicle Replacement - pickup trucks ST-01 Dump Truck Replacement ST-02 Heavy Equipment Replacement ST-03 Equipment Certificates Total General Fund Operating Budget Vehicle Replacement General Fund Operating Budget Total Liquor Fund Northbound Building Maintenance Liquor Fund Total BZ-01 Municipal State Aid Main Slreet Intersection Improvemenls at Hwy 10 11-07 Pavement Management Program PM-01 Municipal State Aid Total 3 40,000 40,000 80,000 3 50,000 50,000 3 230,000 230,000 3 105,000 405,000 50,000 100,000 384,000 1,044,0O0 3 30,000 64,000 94,000 3 30,000 32,000 62,000 3 60,000 20,000 15,000 75,000 170,000 3 30,000 30,000 3 215,000 185,000 265,000 665,000 3 275,000 90,000 365,000 640,000 750,000 457,000 444,000 499,000 2,790,000 3 26,0O0 27,000 28,000 81,0O0 26,000 27,000 28,000 81,000 3 10,0O0 10,0O0 10,000 10,000 2 150,00O 150,000 2 583,333 666,667 1,250,00O 583,333 666,667 150,000 1,400,000. Park Dedication Park Development PF-61 3 10,000 10,000 Park Development - Youth Athletic Complex PF-62 5 20,000 20,000 Park Shelters PF-.81 3 25,000 25,000 Sewer Fund 55,000 55,000 Park Dedication Total Page 1 of 3 Friday, September 13, 2002 Source ProjectO Priority 2008 2009 2010 2011 2012 Total Plant Expansion Lift Station Rehabilitation Vehicle Replacement Digester Cover Replacement Bio-Solids Heat Exchange Heavy Equipment Mixing & Recirculating Pump Replacement Upgrade Boiler Replace Generators Sewer Fund Total Special Assessments Pavement Management Program Special Assessments Total Storm Sewer Ditch 28 Improvements Storm Sewer Total Street Reserve Evans Avenue South of Main Street Parking Lot Improvements Pavement Management Program Street Reserve Total Tax Supported Bond Issue Fire Station ~ - Nodh Tax Supported Bond Issue Total WW-01 3 0 0 WW-02 3 60,000 65,000 125,000 ww-06 2 30,000 32,000 62,000 WW-08 1 200,000 200,000 WW-11 3 80,000 80,000 WW-12 5 150,000 150,000 WW-13 2 75,000 75,000 WW-14 2 125,000 125,000 WW-15 3 110,000 110,000 280,000 225,000 215,000 110,000 07',000 927,000 PM-01 2 583,333 666,667 1,250,000 $83,333 666,667 1,250,000 SW-IO 3 0 0 0 0 I1-11 3 0 0 PL-01 3 0 0 PM-01 2 583,334 666,666 1,250,000 583,334 666,666 0 1,250,000 FD-06 5 2,250,000 2,250,000 2,250,000 2,250,000 To Be Determined Community Center/Senior Center BL-07 Railroad Drive between Jackson and Main 11-10 Public Works Building Expansion ST-10 To Be Determined Total 4 0 0 3 0 0 3 2,000,000 2,000,000 2,000,000 2,000,000 Page 2 of 3 Friday, September 13, 2002 Source Project~ Priority 2008 2009 2010 2011 2012 Total GRAND TOTAL 686,000 2,751,000 696,000 2,582,000 4,966,000 12,013,000 Report criteria: All Project Types All Departments All Categories All Priority Levels All Enterprise Fund data All Other Funding Commitment data Page 3 of 3 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru 2012 Project # BZ-O 1 Project Name Vehicle Replacement Enterprise Fund no Contact Department Type Useful Life Category Priority Building & Env. Admin. Building & Environmental Vehicle 10 years Vehicles 3 Important Other Funding Commitment no Description I Purchase replacement trucks for building inspectors as follows: 2004 - 4 wheel drive pickup track 2009 - 4 wheel drive pickup truck 2010 - 4 wheel drive pickup track 2011 - 4 wheel drive pickup track Total Project Cost $102,000 Justification ] Prior Expenditures 2008 2009 2010 2011 2012 Total , 21,000 1 Vehicles 26,000 27,000 28,000 81,000 Total Total 28,000 27,000 28,000 81,000 Prior Funding Sources [ 21,000 1 General Fund Operating Budget 2008 2009 2010 2011 2012 Total 26,000 27,000 28,000 81,000 Total Total 26,000 27,000 28,000 81,000 Page 1 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # FD-O1 Project Name Vehicle Replacement 2008 2012 Contact Department Type Useful Life Category Priority Total Project Cost Enterprise Fund no Other Funding Commitment no Description ] Replace fire chief and inspector vehicles as follows: 2003 - inspector SUV Fire Chief Fire Vehicle I0 years Vehicles 3 Important $157,000 2009 - chief SUV 2012 inspector SUV 2017 - chief SUV Justification I the fire chief and fire inspector's vehicles are used for everyday general use along with response to emergency incidents. After a period of 7-9 years, safety for emergency response becomes an issue with the vehicles. Prior Expenditures 2008 2009 2010 2011 2012 Total Future ~ Vehicles 40,000 40,000 80,000 J 45,000j Total Total 4o,ooo 4o,0o0 80,000 Total Prior Funding Sources 2008 2009 2010 2011 2012 Total Future ~ Equipment Certificates 40,000 40,t300 80,000 [iiiiiiii145;~] Total Total 40,000 40,000 80,00O Total Page 2 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru 2012 Project # FD-04 Project Name Fire Truck Replacement - Tankers Enterprise Fund no Other Funding Commitment no Description Fire Tanker replacement as follows: 2007 - Tanker 1 2010 - Tanker 2 - Refurbish 2015 - Tanker 2 Contact Fire Chief Department Fire Type Vehicle Useful Life 20 years Category Vehicles Priority 3 Important Total Project Cost $400,000 Justification I If possible, tanker 1 will be refurbished (new chassis and refurbished tank) instead of purchasing a new tanker. Prior Expenditures 2008 2009 2010 2011 2012 ~ Vehicles 50,000 Total Future 50,000 I 175'000 1 Total Total 5o,ooo 5o,ooo Total Prior Funding Sources 2008 2009 2010 2011 2012 ~ Equipment Certificates 50,000 Total Future 50,000 ~ Total Total 50,000 5o,ooo Total Page 3 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # FD-05 Project Name Fire Truck Replacement - Other Enterprise Fund no Other Funding Commitment no Description 2012 Contact Department Type Useful Life Category Priority Total Project Cost Fire Chief Fire Vehicle 25 years Vehicles 3 Important $980,000 Other Fire Truck replacement as follows: 2008 - Rescue 1 2016 - Aerial Ladder Justification Rescue 1 may be moved to station 2 as part of a change in the department's response with pumpers also serving as rescue units. This enables the designated rescue trucks to become more of an equipment unit. Expenditures 2008 2009 2010 2011 2012 Total Future Vehicles 230,000 230,000 [ 750,000 Total 230,000 230,000 Total Funding Sources 2008 2009 2010 2011 2012 Total Future Equipment Certificates 230,000 230,000 Total 230,000 230,000 Total Page 4 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, M/nnesota 2008 thru Project # FD-06 Project Name Fire Station #3 - North Description Enterprise Fund no Other Funding Commitment no 2012 Contact Department Type Useful Life Category Priority Total Project Cost Fire Chief Fire Building 99 years Buildings 5 Future Consideration $2250,000 Construct Fire Station tt3 to decrease call time for Northern part of City. Justification ] Based on current population growth, a station will be needed in the noah as an enhancement for response time. Land should be secured now. The Comprehensive Plan and Tramsportation will assist in identifying a site. Expenditures 2008 2009 2010 2011 2012 Total Equipment 750,000 750,000 Buildings 1,500,000 1,500,000 Total 2,250,000 2,250,000 Funding Sources 2008 2009 2010 2011 2012 Total Tax Supported Bond Issue 2,250,000 2,250,000 Total 2,250,000 2,250,000 Page 5 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # II-07 Project Name Main Street Intersection Improvements at Hwy 10 Enterprise Fund no Other Funding Commitment no Description 2012 Contact Department Type Useful Life Category Priority Total Project Cost Infrastructure Improvements Improvement 99 years Street Construction 2 High Priority $691,812 Modify intersection to improve traffic flow. Justification Prior Expenditures 2008 2009 2010 2011 2012 Total  Land Acquisition 150,000 150,000 Total Total 150,000 150,000 Prior Funding Sources ~ Municipal State Aid 2008 2009 2010 2011 2012 Total 150,000 150,000 Total Total 150,000 150,000 Page 6 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # II- 10 Project Name Railroad Drive between Jackson and Main Description Enterprise Fund no O~her Funding Commitment no 2012 Contact Department Type Useful Life Category Priority Total Project Cost Infrastructure Improvements Improvement 25 years Street Construction 3 Important $0 Improve street and intersections on Railroad Drive Justification Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 0 0 Total 0 0 Funding Sources 2008 2009 2010 2011 2012 Total To Be Determined 0 0 Total 0 0 Page 7 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # II-11 Project Name Evans Avenue South of Main Street Enterprise Fund no Other Funding Commitment no Description 2012 Contact Department Type Useful Life Category Priority Total Project Cost Engineer Infrastructure Improvements Improvement 25 yearn Street Construction 3 lmpomant $0 Justification Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 0 0 Total 0 0 Funding Sources 2008 2009 2010 2011 2012 Total Street Reserve 0 0 Total 0 0 Page 8 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # PL-O1 Project Name Parking Lot Improvements 2008 Enterprise Fund no Other Funding Commitment no Description 2012 Contact Department Type UsefUl Life Categor~ Priority Engineer Infrastructure Improvements Improvement 10 years Street Maintenance 3 Important Total Project Cost $0 Overlay and Sealcoat public parking lots as needed: Downtown lot on north side of RR tracks Downtown lot on south side of RR tracks Justification Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 0 0 Total 0 0 Funding Sources 2008 2009 2010 2011 2012 Total Street Reserve 0 0 Total 0 0 Page 9 of 34 Friday, September ]3, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # PM-01 Project Name Pavement Management Program Enterprise Fund no Other Funding Commitnnent no Description 2012 Contact Department Type Useful Life Category Priority Total Project Cost Engineer Infrastructure Improvements hnprovement 25 years Street & Utility Construction 2 High Priority $7,500,000 Replace aged and deteriorated streets, water mains, sewer mains, storm drainage, and pedestrian pathways. Justification ] Prior Expenditures i -~i~501000] Construction & Overhead (28%) 2008 2009 2010 2011 2012 Total 1,750,000 2,000,000 3,750,000 Total Total 1,750,000 2,000,000 3,150,000 Prior Funding Sources [ 3,750,000 ] Municipal State Aid 2008 2009 2010 2011 2012 Total 583,333 666,667 1,250,000 Total Special Assessments 583,333 666,667 1,250,000 Street Reserve 583,334 666,666 1,250,000 Total 1,750,000 2,000,000 3,750,000 Page 10 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 ~ru 2012 Project # LS-O1 Project Name Northbound Building Maintenance Enterprise Fund yes Other Funding Commitment no Description Replace Carpeting Contact Department Type Useful Life Category Priority Total Project Cost Liquor Store Manager Liquor Fund Maintenance lO years Building Maintenance 3 hnportant $10,000 Justification Expenditures 2008 2009 2010 2011 2012 Total Other 10,000 10,000 Total 1o,ooo 10,000 Funding Sources 2008 2009 2010 2011 2012 Total Liquor Fund 10,000 10,000 Total lO,OOO lO,OOO Page II of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # PF-61 Project Name Park Development Enterprise Fund no Other Funding Commitment no Description 2012 Contact Department Type Useful Life Category Priority Total Project Cost Park & Rec. Director Park Dedication Improvement 99 years Park Improvements 3 Important $60,000 Development of parks not fully developed Justification ] Prior Expenditures [ 50,000 [ Park Improvements 2008 2009 2010 2011 2012 Total 10,000 10,000 Total Total 1o,ooo Prior Funding Sources [ 50,0001 Park Dedication 2008 2009 2010 2011 2012 Total 10,0oo lO,OO0 Total Total lO,OOO Page 12 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # PF-62 Project Name Park Development - Youth Athletic Complex Description Enterprise Fund no Other Funding Commitment no 1 2012 Contact Department Type Useful Life Category Priority Total Project Cost Park & Rec. Director Park Dedication Improvement 99 years Park Improvements 5 Future Consideration $120,000 Youth Athletic Complex - unidentified improvements. See playground and shelter catagories for other improvements at YAC. Justification Prior Expenditures 2008 2009 2010 2011 2012 Total i 10010001 Park Improvements 20,000 20,000 Total Total 20,000 20,000 Prior Funding Sources i ....... -~i00~] Park Dedication 2008 2009 2010 2011 2012 Total 20,000 20,000 Total Total 20,000 20,000 Page 13 of 34 Friday, September 15, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # PF-81 Project Name Park Shelters Description Enterprise Fund no Other Funding Commitment no 1 2012 Contact Department Type Useful Life Category Priority Total Project Cost Park & Rec. Director Park Dedication Building 20 years Buildings 3 Important $50,000 Construct Park shelters as follows: 2006 - Meadowvale Heights 2008 - Meadowvale Heights Justification ] Prior Expenditures 2008 2009 2010 2011 2012 Total Park Improvements 25,000 25,000 Total Total 25,000 25,000 Prior Funding Sources 2008 2009 2010 2011 2012 Total Park Dedication 25,000 25,000 Total Total 25,000 25,000 Page 14 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru l'roj~t # PK-O1 Project Name Park Maintenance Equipment Enterprise Fund no Other Funding Commitment no Description 2012 Contact Department Type Useful Life Category Priority Total Project Cost Street Supt. Park Maintenance Equipment 10 years Equipment 3 Important $267,000 Replace various park equipment as follows: 2005 - turf mower 2006 - zero turn mower 2006 - athletic field groomer 2006 - beach groomer 2009 - turf mower 2010 - athletic field groomer 2011 - zero turn mower 2012 - turf mower Justification Prior Expenditures 2008 2009 2010 2011 2012 Total 97,000 1 Equipment 60,000 20,000 15,000 75,000 170,000 Total Total 60,000 20,000 15,000 75,000 170,000 Prior Funding Sources 2008 2009 2010 2011 2012 Total 97,000 ] Equipment Certificates 60,000 20,000 15,000 75,000 170,000 Total Total 60,000 20,000 15,000 75,000 170,000 Page 15 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # PD-01 Project Name Marked Squad Replacement & Additions Enterprise Fund no Other Funding Commitment no Description 2012 Contact Department Type Useful Life Categor~ Priority Total Project Cost Police Chief Police Vehicle 3 years Vehicles 3 Important $1,683,700 Routine replacement of vehicles at or near 100,000 miles. Includes all equipment and setup. 2003 - 5 replacement squads 2003 - I CMV Enforcement Truck & Equipment 2004- 1 replacement squad 2005 - 2 replacement squads; I additional squad; I replacement SUV 2006 - 5 replacement squads; i additional squad 2008 - 3 replacement squads 2009 - 8 replacement squads; I additional squad 2010- 1 replacement squad 2011 - 2 replacement squads 2012 - 8 replacement squads Justification Prior Expenditures [,, , 639,700 1 Vehicles 2008 2009 2010 2011 2012 Total 105,000 405,000 50,000 100,000 384,000 1,044,000 Total Total 105,000 405,000 50,000 100,000 304,000 1,044,000 Prior Funding Sources ~ Equipment Certificates 2008 2009 2010 2011 2012 Total 105,000 405,000 50,000 105,000 384,000 1,044,000 Total Total 105,000 405,000 50,000 100,000 384,000 1,044,000 Page 16 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru 2012 Contact Police Chief Department Police Project # Project Name PD-02 Unmarked Squad Replacement & Additions Type Vehicle Useful Life 3 years Category Vehicles Enterprise Fund no Other Funding Commitment no Description 2004 - 3 replacement unmarked squads 2005 - I replacement unmarked squad 2007 - I replacement unmarked squad; i additional unmarked squad 2010 - I replacement unmarked squad 2011 - I replacement unmarked squad; 1 additional unmarked squad Priority 3 Important Total Project Cost $256,000 Justification Prior Expenditures i 1~21000 ] Vehicles 2008 2009 2010 2011 2012 Total 30,000 64,000 94,000 Total Total 30,000 64,000 94,000 Prior Funding Sources [ 162,000 ] Equipment Certificates 2008 2009 2010 2011 2012 Total 30,000 64,000 94,000 Total Total 30,000 64,000 94,000 Page 17 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # PD-03 erojeet N~me CSO Vehicle Replacement & Additions Enterprise Fund no Other Funding Commitment no Description 2012 Contact Department Type Useful Life Category Priority Total Project Cost Police Chief Police Vehicle 10 years Vehicles 3 Important $114,000 CSO vehicle replacement and additions as follows: 2004 - pickup truck 2005 - mini van 2008 - pickup truck 2009 - mini van Justification J Prior Expenditures 2008 2009 2010 2011 2012 Total ~ Vehicles 30,000 32,000 62,000 Total Total 30,000 32,000 62,000 Prior Funding Sources 2008 2009 2010 2011 2012 Total ~ Equipment Certificates 30,000 32,000 62,000 Total Total 30,000 32,000 62,000 Page 18 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # BL-07 Project Name Community Center/Senior Center Description Enterprise Fund no Other Funding Commitment no 2012 Contact Department Type Useful Life Category Priority Total Project Cost City Administrator Public Buildings Improvement 50 years Buildings 4 Low Priority $o Justification Expenditures 2008 2009 2010 2011 2012 Total Buildings 0 0 Total 0 0 Funding Sources 2008 2009 2010 2011 2012 Total To Be Determined 0 0 Total 0 0 Page 19 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # WW-01 Project Name Plant Expansion Description Enterprise Fund yes Other Funding Commitment no ] 2012 Contact Engineer Department Sewer Department Type Improvement Useful Life 25 years Category Buildings Priority 3 Important Total Project Cost $0 Expand plant as needed to meet flow. Plant was at 59% of capacity as of December 2001. Expect expansion in 8 to 10 ~ears based on 5% annual growth. Justification ] Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 0 0 Total 0 0 Funding Sources 2008 2009 2010 2011 2012 Total Sewer Fund 0 0 Total 0 0 Page 20 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, M/nnesota 2008 thru Project # WW-02 Project Name Lift Station Rehabilitation Enterprise Fund yes Other Funding Commitment no Description 2012 Contact Department Type Usefu/Life Category Priority Total Project Cost Engineer Sewer Department Improvement 15 years. Utilities 3 Important $260,000 2004 - Lions Park 2006 - Evans Avenue 2007 - Royal Oaks or Dam 2010 - Royal Oaks or Dam 2012 - Oldest lilt station Justification Prior Expenditures i 135,000j Construction/Maintenance 2008 2009 2010 2011 2012 Total 60,000 65,000 125,000 Total Total 60,000 65,000 125,000 Prior Funding Sources [ ~35,000j Sewer Fund 2008 2009 2010 2011 2012 Total 60,000 65,000 125,000 Total Total 80,000 65,000 125,000 Page 21 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 mm 2012 Project # WW-06 Project Name Vehicle Replacement Enterprise Fund yes Contact Department Type Useful Life Category Priority Chief Wastewater Operator Sewer Department Vehicle 6 years Vehicles 2 High Priority Other Funding Commitment no Description 2004 - pickup replace 1992 Dodge 2006 - pickup replace 1998 Chevrolet 2007 - pickup replace 2001 Ford 2010 - pickup replace 2004 truck 2012 ~ pickup replace 2006 truck Total Project Cost $141,000 Justification Prior Expenditures 2008 2009 2010 2011 2012 Total ~ Vehicles 30,000 32,000 62,000 Total Total 30,000 32,000 62,000 Prior Funding Sources ~ Sewer Fund 2008 2009 2010 2011 2012 Total 30,000 32,000 62 000 Total Total 30,000 32,000 62,000 Page 22 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # WW-08 Project Name Digester Cover Replacement Enterprise Fund yes Other Funding Commitment no Description 2012 Contact Department Type Useful Life Category Priority Total Project Cost Chief Wastcwater Operator Sewer Department Improvement 20 years Building Maintenance 1 Critical $525,000 Replace primary digester covers that have exceeded their expected life. 2005 - Primary Digester Cover 2008 - Secondary Digester Cover Justification Prior Expenditures 2008 2009 2010 2011 2012 Total ~ Construction/Maintenance 200,000 200,000 Total Total 200,000 200,000 Prior Funding Sources 2008 2009 2010 2011 2012 Total ~ Sewer Fund 200,000 200,000 Total Total 200,O00 200,000 Page 23 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # WW- 11 Project Name Bio-Solids Heat Exchange Enterprise Fund yes Other Funding Commitment no Description Replace bio-solids heat exchange. 2008 2012 Contact Department Type Useful Life Category Priority Total Project Cost Chief Wastewater Operator Sewer Department Equipment 10 years Equipment 3 Important $80,000 Justification I Expenditures 2008 2009 2010 2011 2012 Total Equipment 80,000 80,000 Total s0,0o0 s0,000 Funding Sources 2008 2009 2010 2011 2012 Total Sewer Fund 80,000 80,000 Total 80,000 80,000 Page 24 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # WW- 12 Project Name Heavy Equipment Enterprise Fund yes Other Funding Commitment no Description Land application equipment for sludge application. 2008 thru 2012 Contact Chief Wastewater Operator Department Sewer Department Type Equipment Useful Life 10 years Category Heavy Equipment Priority 5 Future Consideration Total Project Cost $150,000 Justification Expenditures · 2008 2009 2010 2011 ~2012 Total Equipment 150,000 150,000 Total 150,000 150,000 Funding Sources 2008 2009 2010 2011 2012 Total Sewer Fund 150,000 150,000 Total 150,000 150,000 Page 25 of 34 Friday, September 13, 2002 CAPITAL PLAN 2008 City of Elk River, Minnesota Project # ~V~V- 1 3 Project Name Mixing & Recirculating Pump Replacement Enterprise Fund yes Other Funding Commitment no Description 2012 Contact Department Type Useful Life Category Priority Total Project Cost Chief Wastewater Operator Sewer Department Equipment 15 years Equipment 2 High Priority $75,000 Replace mixing and recirculating pumps. Justification Expenditures 2008 2009 2010 2011 2012 Total Equipment 75,000 75,000 Total ?5,000 ?5,000 Funding Sources 2008 2009 2010 2011 2012 Total Sewer Fund 75,000 75,000 Total 75,000 7S,O00 Page 26 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # WW- 14 Project Name Upgrade Boiler Enterprise Fund yes Other Funding Conunitment no Description 2012 Contact Department Type Useful Life Category Priority Total Project Cost Chief Wastewater Operator Sewer Department Equipment 20 years Equipment 2 High Priority $125,000 Replace current boiler. Justification Expenditures 2008 2009 2010 2011 2012 Total Equipment 125,000 125,000 Total 125,000 125,000 Funding Sources 2008 2009 2010 2011 2012 Total Sewer Fund 125,000 125,000 Total 125,000 125,000 Page 27 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # WV~- 15 Project Name Replace Generators Enterprise Fund yes Other Funding Commitment no Description 2012 Contact Department Type Useful Life Category Priority Total Project Cost Chief Wastewater Operator Sewer Department Equipment 15 years Equipment 3 Important $110,000 Replace 5 generators. Justification Expenditures 2008 2009 2010 2011 2012 Total Equipment 110,000 110,000 Total 110,000 110,000 Funding Sources 2008 2009 2010 2011 2012 Total Sewer Fund 110,000 110,000 Total 110,1100 t10,000 Page 28 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # ST-O1 Project Name Vehicle Replacement - pickup trucks Enterprise Fund no Other Funding Commitment no Description 2012 Contact Department Type Useful Life Category Priority Total Project Cost Street Supt. Streets Vehicle 15 years Vehicles 3 Important $107,050 Street depagmentpickuptruck replacements. 2003- 1 Pickup Tmck 2005- 1 2007- 1 2009- I Justification Prior Expenditures  Vehicles 2008 2009 2010 2011 2012 Total 30,000 30,000 Total Total 30,000 30,000 Prior Funding Sources [ 77,050 ] Equipment Certificates 2008 2009 2010 2011 2012 Total 30,000 30,000 Total Total 30,000 30,000 Page 29 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # ST-02 Project Name Dump Truck Replacement 2008 thru 2012 Enterprise Fund no Other Funding Commitment no Description Contact Department Type Useful Life Category Priority Total Project Cost Street Supt. Streets Equipment 20 years Heavy Equipment 3 Important $1,197,000 Dump truck replacement and additions. Includes all plow equipment. 2003 - 1 IToh Dump Truck 2007 - I I Ton Dump or Stake Truck 2011 - I I Ton Dump Truck Justification Prior Expenditures [ 532,0001 Equipment 2008 2009 2010 2011 2012 Total 215,000 185,000 265,000 665,000 Total Total 215,000 185,000 265,000 665,000 Prior Funding Sources ~ Equipment Certificates 2008 2009 2010 2011 2012 Total 215,000 185,000 265,000 665,000 Total Total 215,000 185,000 265,000 665,000 Page 30 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # ST-03 Project Name Heavy Equipment Replacement 2008 Enterprise Fund no Other Funding Commitment no Description ] 2012 Contact Department Type Useful Life Category Priority Total Project Cost Street Supt. Streets Equipment 20 years Heavy Equipment 3 Important $780,650 Heavy 2003- 2003- 2004- 2005- 2006- 2008- 2008- 2010- 2010- Equipment replacements & additions as follows: front end loader with plow and wing H.D. snow plow for loader sidewalk plow sweeper skid loader front end loader grader utility tractor bucket truck (used) Justification Prior Expenditures [ 415,650] Equipment 2008 2009 2010 2011 2012 Total 275,000 ~0,000 365,000 Total Total 275,000 90,000 365,000 Prior Funding Sources [- ~i5,65oI Equipment Certificates 2008 2009 2010 2011 2012 Total 275,000 ~0,000 365,000 Total Total 275,000 90,000 365,000 Page 31 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota 2008 thru Project # ST-10 Project Name Public Works Building Expansion Enterprise Fund no Other Funding Commitment no Description 2012 Contact Street Supt. Department Streets I Type Building Useful Life 25 years Category Buildings Priority 3 Important Total Project Cost $2,000,000 Justification ] Expenditures 2008 2009 2010 2011 2012 Total Buildings 2,000,000 2,000,000 Total 2,000,000 2,000,000 Funding Sources 2008 2009 2010 2011 2012 Total To Be Determined 2,000,000 2,000,000 Total 2,000,000 2,000,000 Page 32 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Project # SW-10 Project Name Ditch 28 Improvements 2008 th/t/ Enterprise Fund no Other Funding Commitment no Description 2012 Contact Department Type Useful Life Category Priority Total Project Cost Surface Water Management Improvement 20 years Street & Utility Construction 3 Important $0 Improve Ditch 28 as needed Justification Expenditures 2008 2009 2010 2011 2012 Total Construction/Maintenance 0 0 Total 0 0 Funding Sources 2008 2009 2010 2011 2012 Total Storm Sewer 0 0 Total 0 0 Page 33 of 34 Friday, September 13, 2002 CAPITAL PLAN City of Elk River, Minnesota Report criteria: All Project Types All Departments All Categories All Priority Levels All Enterprise Fund data All Other Funding Commitment data 2008 th~u 2012 Contact Department Surface Water Management Page 34 of 34 Friday, September 13, 2002