3.3. SR 07-22-2002TO: FROM: DATE: SUBJECT: MEMORANDUM Mayor and Council Lori Johnson, Finance Director July 22, 2002 Pay Estimate **Item 3.3.** Attached is a pay estimate for a current improvement project. The city engineer has reviewed the pay est/mate and recommends approval. PAYMENT CONTRACTOR REQUEST RETAINAGE Partial Pay Estimate (#0 - Main Street Le~ Turn Lane Improvements Northwest Asphalt $ 20,497.84 $ 1,078.83 Action Requested The City Council is asked to approve the pay estimate as listed above. PARTIAL PAYMENT ESTIMATE NO. 1 FROM: MAY 2002 TO: JUNE 21, 2002 CONTRACTOR: NORTHWEST ASPHALT ADDRESS: 1451 COUNTY ROAD 18, SHAKOPEE, MN 55379 OWNER: CITY OF ELK RIVER, MINNESOTA 'PROJECT: MAIN STREET LEFT TURN LANE IMPROVEMENTS COMPLETION DATE AMOUNT OF CONTRACT SUBSTANTIAL: ORIGINAL: $26,827.00 FINAL: JUNE 28, 2002 REVISED: SCHEDULE 1.0 STREET CONSTRUCTION 1 MOBiLiZATION LS 1.00 3,745.00 1.00 $3,745.00 1.00 $3,745.00 2 REMOVE CONCRETE CURB LF 260.00 4.10 260.00 $1,066.00 260.00 $1,068.00 3 REMOVE CONCRETE MEDIAN SF 2,700.00 0.60 2,250.00 $1,350.00 2,250.00 $1,350.00 4 SALVAGE SiGN EACH 1.00 50.00 0100 $0.00 0.00 $0.00 5 SAWING CONCRETE PAVEMENT (FULL DEPTH) LF 260.00 4.00 260.00 $1,040.00 260.00 $1,040.00 6 MILL BITUMINOUS SRFACE (1.5") SY 120.00 5.75 154.00 $885.50 154.00 $885.50 7 COMMON EXCAVATION (P) CY 120.00 17.25 120.00 $2,070.00 120.00 $2,070.00 8 AGGREGATE BASE, CLASS5 TON 130.00 18.50 112.76 ~2,086.06 112.76 $2,086.06 9 TYPE 2350 WEARING COURSE MIXTURE TON 45.00 30.95 65.43 $2,025.06 65.43 $2,025.06 10 TYPE 2350 NON-WEARING COURSE MIXTURE TON 30.00 30.95 47.11 $1,458.05 47.11 $1,45&05 11 BITUMINOUS MATERIAL FOR TACK COAT GAL 18.00 5.00 40.00 $200.00 40.00 $200.00 12 CONCRETE CURB & GUTTER, DESIGN B618 LF 260.00 17.10 260.00 $4,446.00 260.00 $4,446.00 13 CONCRETE MEDIAN SF 1,265.00 3.75 0.00 $0.00 0.00 $0.00 14 TRAFFIC CONTROL LS 1.00 800.00 1.00 $800.00 1.00 $800.00 15 4" SOLID LINE WHITE ~ EPOXY LF 120.00 7.00 Q00 $0.00 0.00 $0.00 16 INSTALL SIGN EACH 1.00 100.00 0.00 $0.00 0.00 $0.00 17 SUBGRADE DENSITY TEST, INPLACE EACH 1.00 85.00 0.00 $0.00 0.00 $0.00 18 GRADATION TEST, CLASS 5 EACH 1.00 85.00 1.00 $65.00 1.00 $85.00 19 PROCTOR TEST, CLASS 5 EACH 1.00 85.00 1.00 $85.00 1.00 $65.00 20 CLASS 5 DENSITY TEST, INPLACE EACH 2.00 85.00 1.00 $85.00 1.00 $65.00 21 BITUMINOUS CORE TEST EACH 3.00 75.00 0.00 $0.00 0.00 $0.00 22 CONCRETE TESTING EACH 1.00 150.00 1.00 $150.00 1.00 $150.00 SCHEDULE 1.0 STREET CONSTRUCTION - TOTAL BID SUMMARY SCHEDULE 1.0 STREET CONSTRUCTION - TOTAL TOTAL BID SUMMARY THIS PERIOD TOTAL BID SUMMARY TO DATE $21,576.67 $21,576.67 $21,576.67 $21,576.67 $21,576.67 $21,576.67 AMOUNT EARNED AMOUNT RETAINED MATERIAL ON SITE MATERIAL DEDUCT, $21,576.67 $1,078.8: $0.00, $0.00 PREVIOUS PAYMENTS AMOUNTDUE $21,576.67 $1,07&83 $0.00 $0.00 $0.00 $20,497.84