5.8. SR 09-09-2002City ~ River TO: FROM: DATE: SUBJECT: MEMORANDUM Mayor and City Council Rebecca Haug, Environment~[.T~chnician September 4, 2002 P17C Groundwater Remediation Project Item 5.8. Proposal - Waste Management (WM) has requested the City of Elk River to consider cost sharing for the remediation project in the P17C area of the landfill. The P17C area is on the west side of the landfill near Rice Lake. A plume has been detected in this area and Geomatrix Consultants, Inc to date has spent approximately $135,000 on investigating the extent of the contamination. Geomatrix Consultants, Inc has estimated the total cost for P 17C groundwater remediation to be $135,000. Steve Rohlf and I met with Dave Lucas, Solid Waste Officer, Sherburne County on August 20, 2002 to discuss the project. The City and County discussed cost sharing $70,000 (1/2 of the cost ofremediation) of the total estimated cost. The City of Elk River would cover the initial $35,000 and Sherbume County the remaining $35,000. WM has incurred $35,000 on the first phase of treatment, so the City's first contribution would be $17,500. Dave Lucas will be requesting approval for the project from the Sherbume County Board of Commissioners on either September 10th or 17th. FINDINGS · This project demonstrates proper use of landfill abatement money by mitigating for local risk. The work being conducted by WM is a voluntary effort to reduce the VOC contaminants inside the landfill site before they migrate to the property boundaries, potentially contaminating Rice Lake. The insitu aerobic treatment (introduction of oxygen to speed up the breakdown process) of contaminants has been used at other sites. If this does not work, there are other methods of treatment. The wells developed for the insitu aerobic treatment can be used for these other treatment methods. · The City's purpose for regulating is to ensure contamination does not leave the site. RECOMMENDATION Staff recommends cost sharing with WM and Sherburne County for the P17C Groundwater Remediation Project under the following conditions: 1. The City of Elk River pays the initial $35,000, immediately contributing $17,500 for the first phase. 2. The contribution is to cover the costs of remediation not investigation. 3. If the insitu aerobic treatment does not work, another remedial tactic will be pursued. July 18, 2002 Mr. Steve Rohlf City of Elk River 13065 Orono Parkway Box 490 Elk River, MN 55330 RE: Elk River Landfill - P17C Groundwater Remediation Project Dear Steve: This letter is sent to respond to the Waste Management (WM) request for cost sharing for expenses related to the groundwater remediation project in the P17C area of the landfill. The work being undertaken by WM is a preemptive voluntary effort to reduce the VOC contaminants inside the landfill site before they migrate to the property boundaries. Documentation of the project scope and costs are presented in correspondence from Geomatrix Consultants, Inc to Mr. Terry Johnson, WM's project Hydrogeologist, dated April 12, 2002. We have worked with WM and their consultants to generate a remedial approach that will involve insitu aerobic treatment of contaminants where they are observed in their highest concentration on the site. The groundwater remediation plan has also been designed to include a wide degree of flexibility to enable hydraulic control, hydraulic capture and in-situ nutrient enhancement if the concentration of contaminants is not sufficiently reduced with oxygen addition only. From 1997 to date, WM has spent approximately $135,000 for the work completed in the PC17C area. Approximately $100,000 of this amount has been spent on investigating the horizontal and vertical extent of the contamination in the vicinity of the P17C area. Approximately $35,000 has been spent on the first phase of treatment point installation for the remediation. Two additional phases of the remediation project would be conducted over the next several years at an estimated cost of an additional $135,000. In the initial conversations with WM concerning potential cost sharing, the City of Elk River indicated that it may be willing to provide 50 percent cost sharing associated with the actual remediation cost, up to a $70,000 total contribution. Qualified costs to date are $35,000. If the City elects to take this course of action, I would recommend that the City's cost sharing contribution for the first phase of the remediation Please contact me if you have additional questions or comments regarding this matter. My phone number at ERG is 612-339-2316. Thank you. Sincerely, roup, LLC -Matthew L. Ledvina, P.E. Project Manager G:\CLIENTS\Client A-L\City of Elk River~CER2000-020\Corr~Letters 2002~1t020718.doc ENVIRONMENTAL RESOURCE GROUP 1000 IDS Center 80 South Eighth Street Minneapolis, MN 55402 phone 612.339.4750 fax 612.339.4990 14525 Highway 7 Suite 104 Minneapolis, MinnesoC@ 55343 (952) 935-101[] · FAX (952) 935-1254 April 12, 2002 Project 007164.000.0 GEOMATRIX Mr. Terry Johnson Waste Management, Inc. 3701 Shoreline Drive, Suite 202J Wayzata, Minnesota 55391 Subject: P 17C Groundwater Remediation Project Elk River Landfill Elk River, Minnesota Dear Mr. Johnson: Geomatrix Consultants, Inc. has prepared this letter and attached table to present the scope and estimated costs for initiating the P17C Groundwater Remediation Project. Components of the project have been developed with input provided by Waste Management, Inc. and representatives of the City of Elk River and Sherbume County. Also included is a contingency plan which includes triggers and remedial alternatives which could be implemented in the event the current system does not sufficiently remedy the volatile organic compound (VOC) concentrations in th~ P17C area. Scope and Estimated Costs The P17C Groundwater Remediation Project consists of three phases: · Phase I, the verification of VOC distribution, includes the installation of treatment points to be utilized for groundwater sampling and treatment. Four 4-inch diameter wells were installed in January/February 2002. Baseline groundwater sampling and analysis is scheduled to take place on March 3. · Phase II, the interim remedial system implementation, will include installing treatment devices and a monitoring system to assess the effectiveness of the treatment devices. Data collected as part of Phase II will be used to design the full-scale remedial system. · Phase 115, includes the implementation of a full-scale remedial system. Phase III is anticipated to include the installation of six additional treatment points and additional monitoring points (if needed). To date, costs incurred from past P17C invesiigations (1997 to 2001) and the installation of Phase I treatment points amount to approximately $135,000. Estimated costs for conducting the remaining scope of the groundwater remediation project are detailed in the attached table. Contingency Plan The proposed criteria for determining the ineffectiveness of the remedial system will be based on groundwater quality in monitoring well P309C which is located approximately 60 feet up- Geornatrix Consultants, Inc. Engineers, Ge0[0gists, and Environmental Scientists Mr. Terry Johnson Waste Management April 12, 2002 Page 2 GEOMATRIX gradient of compliance boundary well P305C. In the event that VOC concentrations are verified, above Minnesota Department of Health, Health Risk Limits (HRLs) in well P-309C, the following contingency actions, at a minimum, will be considered: 1) Hydraulic control to increase the groundwater residence time within the existing treatment array. The hydraulic control would likely entail extracting groundwater downgradient of the treatment array and re-injecting groundwater up-gradient of the treatment array. 2) Additional or alternative in-sim nutrient enhancement. The treatment points can be utilized for the introduction of additional nutrients or alternate electron acceptors to enhance microbiological activity capable of reducing VOC concentrations. 3) Hydraulic capture. The treatment array and existing monitoring wells will allow for effective groundwater extraction and hydraulic monitoring within the P17C area. Options for on-site groundwater treatment and disposal would be preferable to off-site disposal. Please contact us should you have any 'questions or are interested in discussing the groundwater remediation project in greater detail. Sincerely yours, GEOMATRIX CONSULTANTS, INC. Project Hydrogeologist Attachment cc: MS. Deb Dehn, Elk River Landfill Ms. Deb McDonald, Waste Management, Inc. P:W 164\Correspondence\Client Correspondence~P! 7C CE Cov.doc P17C GROUNDWATER REMEDIATION PROJECT COST ESTIMATE Elk River Landfill Elk River, Minnesota GEOMATRIX GEOMATRIX LABOR EXPENSES/CONTRACTORS ESTIMATED GEOMATRIX LABOR (Hours) UNIT QUANt' COST 10% ESTIMATED COST TO Geomatrix Personnel & Rates (S/hr) Mark-up? COST DATE TYP CAD ST2 PRlf PR10 SE1 SE2 PRI 42 70 60 60 70 100 115 140 (S/unit) (1 = Yes) ($) ($) Waste Management P17C Work Cost 1997 - 2001 Costs Incurred invsetigating the P-17C ares $95,000 Remedial system research and design (2001) $5,000 PHASE I: VERIFICATION OF VOC DISTRIBUTION TreatmentJVerificatlon Point Installations $35,000 Baseline Groundwater Monitoring Collect 6 water samples hr 6 $70 $420 Analyze 6 water samples for VOCs and cations/anions, BOD, DOC, SF, EA 5 $325 $1,625 PHASE I1: INTERIM REMEDIAL SYSTEM IMPLEMENTATION Treatment Point Installation Oxygen diffusion system Specification, Ordering, and Installation 80 $4,800 Emitter EA 12 $700 $8~400 Tubing LS I $750 $750 Shelter LS I $1,500 $1,500 Oxygen LS I $300 $300 Plumbing (conduit, valves, rittings) LS 1 $600 $600 In-well monitoring system (drop tube) LS I $100 $100 Misc. Supplies & equipment LS 1 $300 $300 Design drewingaJschemetlcs 20 10 $2,100 Regulatory Permitting Issues $2,000 Surveying LS I $1,500 $1 ~500 Monitoring System Installation Installation of five monitoring points 42 LS I $11,000 $13,520 Equipment LS I $250 $250 System Performance Monitoring (2 events) Collect 18 water samples (treatment and monifortng system points) hr 12 $70 $840 Analyze 18 water samples for VOCs and cations/anions, BOD, DOC,SF EA 18 $325 $5,850 Groundwater parameter collection (monthly for 3 months) hr 12 $70 $840 P:I/7164/Wo rk Plan/Costest/CEO22802.xls P17C GROUNDWATER REMEDI~TION PROJECT COST ESTIMATE GEC)MATRIX Elk River Landfill Elk River, Minnesota GEOMATRIX LABOR EXPENSES/CONTRACTORS ESTIMATED GEOMATRIX LABOR (Hours) UNIT QUANT COST 10% ESTIMATED COST TO Geomatrix Personnel & Rates (S/hr) Mark-up? COST DATE TYP CAD ST2 PRlf PR10 SE1 SE2 PRI 42 70 60 60 70 100 115 140 (S/unit) (1 = Yes) ($) ($) PHASE II (cont'd) Data Analyala & Deaign Data Tabulation and Analysis 8 32 4 4 $3~596 Pre-Phase III Design Additional Remedial System 12 40 20 10 $7,040 Misc. office expenses LS I $400 $400 PHASE III SYSTEM IMPLEMENTATION (anticipated) Installation of aix treatment points 60 LS I $40,000 $43,600 Installation of three monitoring pointa 32 LS I $7,000 $8,920 Emitter apeciflcetion & Installation 40 $2,400 Emitter EA 18 $700 $12,600 Tubing LS I $750 $750 Plumbing (conduit, valves, fittings) LS I $600 $600 In-well monitoring system (drop tube) LS I $100 $100 Misc. Supplies & equipment LS I $300 $300 Design drawings/schematics 4 4 $560 MISCELLANEOUS PROJECT COMPONENTS Annual Inspection Remove, Inspect, and service treatment devices 40 LS I $500 $2~900 Project Management 48 $3,360 COST INCURRED TO DATE $135,000 PROJECTED COST FOR PHASE I (REMAINING) THROUGH ANTICIPATED PHASE III $132,800 Phase III Implementation anticipated to include: - Installation of six 4-Inch diameter treatment points with 3 emitter devices each Project Management includes: coordinating subcontractor bids/contracts, data collection activities (gw sampling, analysis, surveying, etc.), and cost tracking Groundwater sampling to be conducted by Interpoll Laboratories, Inc. Groundwater sample analysis to be conducted by Severn Trent Laboratories P://7164/Work Plan/Costest/CEO22802.xls