6.6. SR 4-15-2002City
MEMORANDUM
Item 6.6.
TO:
FROM:
Mayor and City Council
Chris Leeseberg, Planner
DATE:
April 15, 2002
SUBJECT:
CU 02-04
Request by JKCD, Ltd. for a Conditional Use Permit to
Construct a Banking Facility (Sterling Community Bank)
Request
JKCD, Ltd. is requesting a Conditional Use Permit to allow the construction of a banking
facility (Sterling Community Bank).
Location
East of Highway 169, south of Main Street and west of Zane Street.
Lot 2, Block 1, Elk River Crossing 2nd Addition
Zoning/Land Use
PUD (Planned Unit Development) / HB (Highway Business)
Attachments
· Location map
· Memo from City Engineer
· Site Plan
· Architectural drawings
Overview
The request consists of a 4,235 sq. ft. building. The facility will be a one-story building with
a full basement. The entire building will be treated with an Exterior Insulating Finish System
(EIFS) with a standing seam metal roof. The majority of the basement will be devoted to
storage along with mechanical and electrical spaces and the vault. The first floor will house
City Council
April 15, 2002
Page 2
office space, tellers, conference room, file room, lounge and restrooms. The facility will
have four drive-thru tellers. The proposed canopy is within an existing utility easement and
will need written permission from the easement holder prior to issuance of a building permit.
There are also provisions for a future building expansion.
Building setbacks are not defined in the Elk River Crossing PUD but the building does meet
the C3, Highway Business setback requirements.
Design Standards
The proposed building materials for the facades will be EIFS with accents of rock-face
concrete blocks at the base of the columns. The roofing material will be a prefinished metal
standing seam system. The entrance is clearly defined and the there will be EIFS banding on
the facades to break up the surface. The proposed design meets the design standards for Elk
River Crossing. There are two walls signs being proposed which do not exceed the
maximum size allowed.
The trash enclosure will be located within the building.
Landscaping & Signage
A landscape plan was not received from the applicant. They will be required to work with
staff to provide a landscape plan that meets the city's requirements. A monument sign is
being proposed near the southwest corner of the property. There is an easement in that
area and the applicant will need written permission from the easement holder to locate the
sign within their easement.
Parking and Circulation
Based on the square footage of the building and the City's requirement of one parking stall
for every 200 sq. ft., a total of 21 parking stalls would be required. The proposed layout
exceeds this requirement with a total of 36 total stalls. A minimum 10' setback from the
property line is also maintained.
Two (2) handicap-parking stalls are required for the building. The submitted site plan shows
one (1) stall, which does not meet the requirements. For parking lots with 26-50 stalls, there
is a minimum requirement of two accessible stalls. There is also a concern as to why the
proposed handicap-parking stall is located so far from the entrance.
The proposed layout provides two driveways to the site off of Zane Street. One access is at
the shared drive with the Conoco/Wash 'N Fill to the north and the second is off of a
shared drive on the south side of the property.
Sewer and Water
The City Engineer's memo addresses sewer and water. Based on the revised site plan, the
applicant will be required to submit revised utility plans.
S:\PLANNING\Case Files\CU 02-04 Sterling Bank\CU02-04_CC.DOC
City Council
April 15, 2002
Page 3
Drainage and Utilities
The City Engineer's memo addresses site drainage and utilities. Based on the revised site
plan, the applicant will be required to submit revised utility plans.
Recommendation
Staff and the Planning Commission recommend that the City Council approve the
Conditional Use Permit to allow the construction of a banking facility (Sterling Community
Bank) with the following conditions:
1. ALL COMMENTS OF THE CITY ENGINEER BE ADDRESSED
2. THE BUILDING SHALL COMPLY WITH THE BUILDING AND FIRE
CODE REQUIREMENTS.
3. ONE ADDITIONAL HANDICAP-PARKING STALL SHALL BE
PROVIDED.
4. A LANDSCAPE PLAN MEETING THE CITY'S LANDSCAPE
REQUIREMENTS SHALL BE SUBMITTED & IMPLEMENTED.
5. THE APPLICANT SHALL PROVIDE WRITTEN PERMISSION FROM
THE EASEMENT HOLDER FOR CONSTRUCTION WITHIN THE
EASEMENT PRIOR TO ISSUANCE OF A BUILDING PERMIT.
S:\PLANNING\Case Files\CU 02-04 Sterling Bank\CU02-04_CC.DOC
RAver
Location Map
Case Number: CU 02-04 JKCD, LTD
(Sterling Community Bank)
Howard R, Green Company
February 19, 2002
File: 817010J-0240
Mr. Scott Harlicker
Senior Planner
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330-0490
RE:
STERLING STATE BANK
SITE PLAN REVIEW
Dear Mr. Harlicker:
As requested, we have reviewed the submittal package for the Sterling State Bank proposed in Elk
River Crossing development just south of the Wash 'N Fill site adjacent to TH 169. The submittal
package was prepared by John Oliver and Associates and consisted of a site plan, preliminary
grading plan, preliminary utility plan, landscape plan, and detail sheets. A revised utility plan was also
submitted. Based on our review and comments received at the staff review meeting, we would offer
the following comments:
A. SITE PLAN
· At the south side of the site, there is an access road that serves as the exit from the drive-
thru portion of the bank and will also serve the next lot to the south. We would recommend
that a connection at the west end of this drive be made back to the bank parking lot. This
will allow a secondary exit method for vehicles using the inside bank facilities.
· We question why the handicap parking stalls are located so far away from the front door.
Perhaps it would be better to have them located more centrally in front of the bank
building.
· The sidewalk in front of the bank building should run further to the west to connect with the
curb line of the parking lot. Currently, the sidewalk stops about 10 feet short of the curb
line.
· The two parking stalls in the northwest corner are very undesirable. If vehicles are parked
in both sites, there is not enough room for the vehicle adjacent to TH 169 to back out of the
parking stall.
· The existing ddveway locations should be shown on the east side of Zane Street to
determine how the proposed driveway lines up with the existing driveway.
· The plat of the area should also be shown on the submittal package to ensure that there
are no lot lines that need to be moved and easements vacated or new easements granted.
Ltr 2-19-02 Harlicker
1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389
Mr. Scott Hadicker
February 19, 2002
Page Two
B. PRELIMINARY GRADING PLAN
· The proposed access to the northerly existing read servicing the Wash 'N Fill is relatively
steep at 3% grade flowing into the parking lot. Even though a concrete valley gutter is
proposed across this driveway, it is unclear how stormwater from the Wash 'N Fill site will
be kept out of the bank parking lot. It appears that stormwater flowing from the Wash 'N
Fill along this access road to Zane Street may flow into the Steding Bank parking lot.
· On the east side of the proposed parking lot, the center top of curb elevation is shown as
897.67. It appears that this elevation is too Iow if drainage is intended to flow from here to
a catch basin with a top of 897.63.
· On the drive-thru portion of the proposed bank building, a proposed storm sewer line is
shown through the area for the future expansion of the drive-thru. We would suggest that
the storm sewer line be moved to the south, out of the way of the future expansion, so that
it does not have to be moved or impacted in the future if the drive-thru is, in fact,
expanded.
· The access read at the extreme south portion of the site needs to have catch basins
installed near the intersection with Zane Street to eliminate storm water exiting the site,
draining directly onto Zane Street.
The elevations at this entrance read of 898.84 are wrong.
C. UTILITY PLAN
· The initial utility plan showed sewer and water services coming from the northern side of
the building. The revised utility plan shows the sewer and water services coming from the
lot to the south. We would recommend that the revised plan not be implemented because
the sewer and water services to the south are intended for the next lot. With the revised
plat of this area, there are actually more lots platted than there are sewer and water
services available, which means that at some point Zane Street will have to be open-cut to
provide additional services. If sewer and water services are used faster than intended,
there will be more open-cuts of Zane Street. Therefore, we would recommend that the
sewer and water services be obtained from the north side of the building as originally
planned.
· The 8-inch water line brought into the building for fire sprinkling needs to have a domestic
service tapped off of it prior to entering the building.
· The sanitary sewer line which comes from the existing manhole in the access read at the
south end of the Wash 'N Fill site is 150 feet long (it is mislabeled on the plan as 105 feet).
Because it is over 100 feet long, there needs to be a cleanout on the line at some point.
· The existing two hydrants, one centrally located in front of the building along Zane Street
and one located to the north of the building adjacent to the access road, have been
reviewed with Fire Chief Bruce West and he is comfortable with these two existing
hydrants providing fire protection.
Ltr 2-19-02 Harlicker
Howard R. Green Company
CONSULTING ENGINEERS
Mr. Scoff Hadicker
February 19, 2002
Page Three
If you have any questions regarding these comments, please call.
Sincerely,
Howard R. Green Company
Tearer, P.E.
TJM:tw
Ltr 2-19-02 Harlicker
Howard R. Green Company
CONSULTING ENGINEERS
G :\Land Projects R2~8136-10~dwg\SSB-SlTE3.dwg, 04/11/02 08:41:59 AM, Dale
.
~ ~ m
hereby cedify thor this plon, spec- DATE: 1/02/02 REV DATE DESCRIPTION
John 08ver & Associates, Inc. ~r~ot~ ..... ~o~t ~ ~o~ ~ ~o.
STERLING STATE BANK ~,, ~. ~ ~,~. ,,~ ,~ ...... der my direct supervision DESIGN BY: DLC I 3/26/02 REVISED SITE LAYOUT
and that I am a du~y Ucensed Prof- DRAWN BY: DM/CSA
ELK RIVER, MN , ~ ~¢ .... ~t~ .... t. ~go th~ ~at. of ~i ..... ~. CHECXCD .V: DLC
] 763-441-20~2 ~ ~63-441-56~5
DWG:
REVISED SITE PLAN
Dete: X Reg, No. X FILE NO.: 8136.10-05
ELEVATION
-o? o=
ELEVATION
I[
KKE
Korsunsky Krank Erickson
Architects, Inc.
300 First Avenue Nort~
}~linneapolis, :'~fN 55401
STERLING
STATE BANK
ELK RIVER, MINNESOTA
EXTERIOR
ELEVATIONS
Nc. Date Rev¢~o~ Description .
Da_~t_e. 01- 2~ 2002
~"~' A301
r
KKE
Korsunsky Krank Erickson
Architects, Inc.
300 First Avemie North
Minneapolis, MN 55401
612/3P, 9-4;~00
'FAX 342-9267
STERLING
STATE BANK
ELK RIVER, MINNESOTA
Key Plan
FIRST FLOOR PLAN
No. Date Re'as~oo Descnptm
°-~ :~ A202
Korsunsky Krank Erickson
Architects, Inc.
300 Fkr~t Avenue Nm'U~
Minneapolis, MN 55,10I
FAX 342-9267
STERLING
STATE BANK
ELK RIVER, MINNESOTA
Key Plan
LOWER LEVEL
FLOOR PLAN