Loading...
6.7. SR 4-15-2002City ~ Kiver MEMORANDUM Item # 6.7. TO: FROM: DATE: SUBJECT: Mayor and City C~u~ Michele McPhers6~, Director of Planning April 15, 2002 Case No. CU 02-09 Allow Expansion to Existing City Hall and Construction of New Public Safety Facility Request The Council is asked to consider an expansion to the existing City Hall and the construction of a new Public Safety Facility. Location 13065 Orono Parkway Lot 1, Block 1, Lots 1-3, Block 2, Lots I and 2, Block 3, Gospodor's Orono Lake Addition Zoning_ & Land Use glc - Single Family Residential/MR - Medium Density Residential Attachments · Location Map · March 29, 2002 Letter from Fire Chief Bruce West · April 11, 2002 Memo from the City Engineer · Site Plan Preliminary Grading and Utility Plan · Planting Plan · First Floor - Public Safety · Basement - Public Safety · Second Floor Shell Space · City Hall Floor Plan Memo to Mayor and City Council/CU 02-09 April 15, 2002 Page 2 · Utilities Floor Plan Exterior Elevations City Hall and Utilities · Emergency Vehicle Routes · Campus Illustration Public Safety Elevations · City Hall and Utility Elevations Analysis Building Expansion The current City Hall and Police Station, (31,668 square feet), is proposed to be expanded in order to accommodate Elk River Municipal Utilities and the City Attorney. The Utilities addition (7,276 square feet) will be located on the northwest side of the building and will require the removal of the dumpster enclosure as well as electrical transformers. The City Attorney's expansion (1,863 square feet) will be located on the southwest corner of the building and will also include a small addition for an expanded Cable Television area. Both expansions meet the building setback requirements of the Rlc zoning district. Public Safety Facility The Public Safety Facility, (43,733 square feet), will include Police, Fire, and the Emergency Operations Center. There will be basement that will house the EOC, the firing range, and evidence room. A second story will be constructed as shell space that will allow future expansion for the Police Department. Located north of the proposed Police Station will be the Police impound lot, which will be enclosed by a six foot high fence. The Fire Station will have room for up to six fire vehicles. The building meets the setback requirements of the Rlc zoning district. Site Impacts In order to construct the Public Safety Facility, Orono Road will be removed to the Gary Street intersection. This will create a common parking area for both facilities. As a result, the Park and Recreation Commission will be reviewing and evaluating the Orono Park Master Plan for recommended changes. Also in conjunction with this project will be the closure and reopening of medians in Orono Parkway. The berm and landscaped area in the medians will be lowered in order to improve visibility for vehicles entering or leaving the City Hall Complex. Parking Requirements In order to accommodate the buildings, the parking lot will be expanded. Twenty-five spaces will be located behind the Public Safety Facility, for police and fire staff. In addition, up to 12 garage spaces for squad cars may be constructed. S:\PLANNING\Case Files\CU 02-09 City Hall\4 15CCmemo.doc Memo to Mayor and City Council/CU 02-09 April 15, 2002 Page 3 The total number of spaces required, based on gross building area is 214 (including bathrooms, storage, Council Chambers, etc). This does not include the building area of the fire garage, the EOC, the lower level of the Police Department, or the second level shell. The number of spaces provided is 251. This includes six garage spaces and 37 spaces within the impound lot. Building Elevations The buildings are proposed to be constructed of brick, rock face block, and E.I.F.S., all in neutral, earth-toned colors. The existing cedar shake roof will be replaced with standing seam metal in a complimentary color. Landscape Plan A landscape plan has been submitted that exceeds the ordinance requirements. Staff is working with the Landscape Architect on a plan to reuse and/or relocate many of the existing trees on the site. Native plant materials such as prairie grasses and flowers are proposed in many areas to reduce maintenance, the need for irrigation, and the need for chemicals. The landscape plan is being revised to reflect these changes. Planning Commission Action The primary concern of the Planning Commission at there meeting of March 26, 2002 was traffic. They were concerned with emergency vehicle traffic on Orono Parkway, the distance to Highway 10 if Orono Road was closed, and the level of traffic that could be supported by Orono Parkway. The Fire Chief and City Engineer have addressed these issues in their attached memo(s). Only two residents spoke regarding the proposal, and their concerns also revolved around traffic, primarily the use of Orono Road by emergency vehicle traveling east into downtown. Mr. Dilly, however, did express concern about reducing the glare from lights. The Planning Commission recommended approval of the request with the following conditions: 2. 3. 4. 5. THE BUILDING SHALL COMPLY WITH ALL APPLICABLE BUILDING CODES. THE LANDSCAPE PLAN SHALL BE REVISED TO COMPLY WITH STAFF COMMENTS. THE SIGNAGE SHALL COMPLY WITH THE INSTITUTIONAL REQUIREMENTS OF THE R1C ZONING DISTRICT. THE PARKING WILL MEET THE CODE REQUIREMENTS (214 SPACES). SIGNAGE AND WARNING LIGHTS SHALL BE INSTALLED ON ORONO PARKWAY TO WARN PEDESTRIANS AND MOTORISTS OF EMERGENCY VEHICLES ENTERING. A RESIDENTIAL ROOFING MATERIAL SHALL BE USED, EITHER ASPHALT OR CEDAR SHINGLES. S:\PLANNING\Case Files\CU 02-09 City Hall\4 15CCmemo.doc Memo to Mayor and City Council/CU 02-09 April 15, 2002 Page 4 Recommendation The City Engineer is currently working with the Minnesota Department of Transportation regarding the appropriateness of condition Five above. Additional information will be available at the meeting for the Council to consider. The site plan has been revised to provide the required parking. In regards to the use of standing seam metal roofing in a residential district, this building material is becoming more popular in residential applications. The life span of this material far exceeds that of other roofing materials. Proper color selection will ensure that the roof will not be obtrusive to the adjacent neighborhood. Staff recommends that the condition requiring asphalt or cedar shingles be deleted. Staff recommends that the City Council approve the request to expand City Hall and to construct a Public Safety Facility with the following conditions: 2. 3. 4. THE BUILDING SHALL COMPLY WITH ALL APPLICABLE FIRE AND BUILDING CODES. THE LANDSCAPE PLAN SHALL BE REVISED TO COMPLY WITH STAFF COMMENTS. THE SIGNAGE SHALL COMPLY WITH THE INSTITUTIONAL REQUIREMENTS OF THE RIC ZONING DISTRICT. SIGNAGE AND WARNING LIGHTS SHALL BE INSTALLED ON ORONO PARKWAY TO WARN PEDESTRIANS AND MOTORISTS OF EMERGENCY VEHICLES ENTERING. S:\PLANNING\Case Files\CU 02-09 City Hall\4 15CCmemo.doc QIT¥ TOWER PARK ORONO 30UNTY FAIR ;ROUNDS ROAD~ SOFTBfLL PARK CITY 0 PARKWAY ILiver Case Number: Location Map N CU 02-09 CITY HALL EXPANSION / PUBLIC SAFETY BLDG River Fire Department 415 Jackson Avenue Elk River, MN 55330 March 29, 2002 Michele McPherson City Planner 13065 Orono parkway Elk River, MN 55330 Michele: I would like to respond to the question of one of the Planning Commission members at the Tuesday March 26, 2002 meeting, referencing the travel distance on Orono Road versus Orono Parkway. I traveled both roads, on Wednesday March 27, 2002, from the proposed exit driveway for the emergency vehicles, as they would enter either Orono Road or Orono Parkway. The distance from the exit of the proposed fire station onto Orono Road, then Orono Road to the Joplin Street four-way stop is .5 of one mile. The distance from the exit of the proposed fire station onto Orono Parkway, then Orono Parkway to Joplin St, proceeding on Joplin St to the Joplin St, Orono Road four-way stop is .55 of one mile. The difference is .05 of 1-mile travel distance. The question was a valid concern in reference to possible "extra" travel distance because of the closing of Orono Road. If you have any other questions, please feel free to call me at the Elk River Fire Department. Respectfully, Bruce A. West Fire Chief Elk River Fire Department Phone: 763.441.4919 Fax: 763.441.3299 www. ci.elk-rivenmn.tlS Howard R, Green Company April 11, 2002 File: 816940J-0240 Ms. Michele McPherson Director of Planning City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: PROPOSED PUBLIC SAFETY FACILITY Dear Ms. McPherson: This correspondence is intended to address some of the transportation issues associated with the proposed construction of a new public safety facility on the City Hall site. These are issues that were either raised at the Planning Commission Public Hearing or discussed by staff at the project review meeting. They are as follows: 1. EMERGENCY VEHICLE ROUTING As you are aware, the construction of the public safety facility will eliminate Orono Road from Orono Parkway to the intersection of Orono Road and Gary Street. Orono Road has always been viewed as temporary and, in fact, is not even a platted right-of-way, but simply an easement through property owned by the City. The proposed route for emergency vehicles going to areas other than adjacent to Main Street would be out onto Orono Parkway, west to Joplin Street and north to TH 10 to the signalized intersection equipped with emergency vehicle preemption. Fire Chief Bruce West has measured both this route and the currently available route of Orono Road north from City Hall to Joplin Street and then to TH 10. He has reported that the difference in the two routes is less than 1/10th of a mile. Concern was raised at the public hearing before the Planning Commission regarding whether or not it would be better for emergency vehicles to be able to leave the new public safety facility and head north on Orono Road, to Gary Street to get to TH 10. Staff is extremely concerned about this route because it goes directly through an active park area with lake usage in the summer and softball fields during the spring, summer, and fall months. Also, Gary Street at the intersection of TH 10 is an uncontrolled intersection with relatively poor geometrics regarding Gary Street and the vertical elevation of the road as it meets TH 10. 2. ORONO PARKWAY CAPACITY An issue was raised regarding the expansion of the City Hall facilities and the elimination of Orono Road in view of the traffic it would attract and force to use Ltr 4-11-02 McPherson[1] 1326 Energy Park Drive · St. Paul, MN 55108 ° 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Ms. Michele McPherson April 11, 2002 Page Two Orono Parkway and Joplin Street to Main Street. Current traffic counts taken in 1999 (additional counts are taken every four years and are scheduled for next year) show a total average daily traffic of 850 vehicles on Orono Parkway. A 2- lane, divided roadway with minimal turning movements such as Orono Parkway can easily handle 7,000 to 10,000 vehicles per day before consideration should be given to turning it into a 4-lane facility. Therefore, based on the relatively minor volume of traffic currently on Orono Parkway, we see no reason to consider expanding the number of lanes by narrowing the medians to provide two lanes of traffic in each direction. 3. INTERSECTION OF ORONO PARKWAY AND JOPLIN STREET With the elimination of Orono Road through the City Hall site, the intersection of Orono Parkway and Joplin Street will likely see an increase in traffic. Currently, that intersection has stop sign control on Orono Parkway with no traffic control for vehicles traveling on Joplin Street. Consideration should be given to installing a 4- way stop at this intersection to help facilitate the larger volume of traffic anticipated. A 4-way stop sign is typically utilized at areas where the volume of traffic on each road of the intersection is approximately the same. This will likely be the case at this intersection, with the exception of Orono Parkway to the west, which essentially serves only the townhouse development and Sandpiper Estates. 4. FIRE STATION WARNING DEVICE Staff is currently reviewing the options available for warning the motoring public on Orono Parkway of the presence of the fire station. Signing is the most typically used type of warning device; however, staff is reviewing with Mn/DOT the appropriateness of some type of flasher which potentially could be activated when a fire vehicle is about to exit the building onto Orono Parkway. Staff will present more information to the City Council on this issue when it becomes available. 5. ORONO PARKWAY IMPROVEMENTS We are currently working on construction plans and specifications for the necessary improvements to Orono Parkway. We will be bringing these forward to the City Council for plan approval and authorization to advertise for bids in the near future. The proposed improvements consist of closing median openings no longer needed, creating new median openings to service the new City Hall expansion, and modifications to the median. Currently, the median area is mounded earth that is sodded. It is the intent of the plans and specifications to lower the median to the curb height for the entire width of the median to improve visibility. Together with this, the street lights will also need to be lowered. This lowering is planned for the entire length of the median. An irrigation system will be installed. Currently, the City Hall architects are reviewing plant treatment options for use in the median area. Howard R, Green Company Ltr 4-11-02 McPherson[1] CONSULTING ENGINEERS Honorable Mayor and City Council April 11, 2002 Page Three If you have any questions regarding the transportation issues associated with the proposed new public safety facility, I will be in attendance at your April 15, 2002, City Council meeting. Sincerely, Howard R. Green Company Terry J/Maurer, P.E. TJM:tw Ltr 4-11-02 McPherson[1] Howard R, Green Company CONSULTING ENGINEERS MOTTLED 5OIL ~RING - r I I I ~ A ppP.,~/Ir"IAT E ;-REA OF GEC~ELL- F!ELP CpAGUE Td ' J~NR¥ SCREEN SE UT FENCE SEE DETAL C~4AIN FENCE CARD REAPER CONCRETE SEE CI/~L SPACE CCNCRETE SEE CI/IL- CCNC~ETE pARKING CONCRETE SEE Gl/iL 37 SPACE IMPOUND ~ PARKING LOT LOADING · SEE !PUTUF 25 .~EME~GENC% pER~CNNEL ~- 9EE DETAIL ~ASEF1EN~- ~UTLINE \ \ E.~N nil ~--~NC LE~T ~-JRN S ,~N SEE DETA!- .,'~ENE~.AL ~ TE NC-~E5 r u s H I E N~TE~ E/CEP~ ~ ~EN~ ~N~ CN ~U~JNTA~LE ~U~ ~N C~ J~E ~' 7645 LYNO~E AVE~ SOUTH,  F~O~ TWE BACK ~F C~B BTC~P~ ~/ F~NDAT ON5 A_L _~T-,NG 612,861. 9636 F~: 612 . 861. 9652 E/ ~T NG TA- - ~ ~ ~E~x ~ TT ~E~UI~E~ENT3 ..... ~T~N ' N~ :/~ ' /AT ~N TC p~C--~CT - LAKE ORONO ~ ~ oBITE PLAN Date 4/4/02 By ASl,4 By TL~ GMT hitect DLP ;ct Number 20112~. & Addendums EL~ RIVER PUBLIC SAFET~ ~ITE pLAN LEGEND QSUP-.VE"r' $S-2, , 2-2'5 t u z ~ E Lot ~ ELK RIVER PUBLIC SAFETY T U S H I E MONTGOMERY ARCHITECTS ELK RIVER, MINNESOTA JANUARY 28, 2002 -- i-' N~$C-', PE NOTES: ...... ~ x TAKE PRECEDENCE ~ "~ ALL UTILITIES AND 5T~UCTU~E3 DAMAGE TS UTILITIES AND 5T~UCTU'~E5 5~ALL , ~ . . TREES ~ ---- '~ -~- D, ;¢A~ .... , ~ x, ARSHITECT5 APPROVAL p~IOR TS ANY EXCAVATION OR INSTALLATION ~ 2~o-~ sumac ~k~ ~ '~-I~' ' ~ -~E~ ~ GRAB5 ~MULC~ M~Y BE USED ON RELATI/~L~ LE/EL ~RE~S ~ LANDSCAPE REQUIREMENT5 TREES REQUIRED PROPOSED TREE SPECIES MIX REQUIRED PROPOSED MAY NOT BE MA~E PRIO~ WRITTEN CONSENT OF ARChiTECT. ALt. COMMON LAW R~HTS RESERVEO. OR REPORT W~ PRE* ANO THAT I AM A OUI. Y LAJ~OSC~PE ARCHITECT UNDER LAWS OF' TH([ STATE OF GARY M. TUSNIE c DOD TD PRSPERT¥ LINE CONCENTRAT ON ;N~NTAL PLANTING DESIGN DTRATEGIES: /ARIET¥ OF NATI /E PLANT SPECIES FOR LESS AND GREATER ~ILD~IFE /ALUE REATE LARGE PLANT PflASSEB AND D:/E~GE PLANT ~ADE pA /E~ENT TO REDUCE MEAT GAIN AND ~A~N~ATER USE PLANTINGS TO AI~ BUILDING ENERGY EF=ICIENC% pLANTNG E/ERGREEN5 TO T~E N~ AND DECIDUOUS TREE5 ~E~UCE TuIRFG~AS~ ~CW ~AS W~ ~A~ER FERTILI]ER OPLANTING PLAN N Dote 414/02 Drown By ASIN Checked By TL, GMT Project Architect DLP Project Number 201126 Revisions & Addendums ELK RIVER PUBLIC SAFETT PLANTING PLAN L3.0 OFULL _F I P-.ST GARAG~ I!XPA~ION LOCKED STOR~E STa~ f40 ur. xe~) I ~x~ ~-x6 I &xej ue I ~ i FLOOR PLAN T U S H I E MONTGOMERY ARCHITECTS 7645 LYNDN. E AVENUE SOUTH, elOO M4NNEAPOLIS, MINNESOTA 55423-4084 612 . Dote 4/4/02 Drown By Checked By TL~ GMT Project Architect DLP Project Number 2OII26 Revisions & Addendums ELK. RIVER PUBLIC SAFE'I-T' FIRST FLOOR PLAN UNEXCAVATED STORAGE 5ECURI'D~ VESTIBULE BREAK ROOP1 ~=; E.O.C. / TRAINING GUN RANGE UNEXCAVATED m T U S H I E MONTGOMERY ARCHITECTS 7645 LYNDALE AVENU~ SOUTH, °100 MINN[A*°OLIS, MINNESOTA 55425-4084 612 . 661. 9636 FAX: 612 . 861. 9652 WWW . TMIARCHITECT9 . COM NAU~: DANIEL L. PELLINEN N Dote 4/~4102 Drown By Checked By TL~ GP1T Project Architect DLP Project Number 201t2G Revisions & Addendums ELK RIVER PUBLIC SAFETY LOi, q E P-, LEVEL FLOOP. PLAN A1.0 O~EN TO FLOOR. PLAN HEZZANINE (~flEZZA_ NINE)_ F LOOP--_ PLA~ ~ N U S H I ] 2ONTGOMER~ RcHITECT LYNDALE AVENt~ SOUTH. m~ ~,,, Revisions ~ AddendumS GEXIBTING- UPPER LEVEL U21~8¥ L AREA CALCULATIONg: OOVEP-..ALL MAIN LEVEL FLOOR _PLAN BLDG. flArRf. 6T0~E FILE II T U S H I E MONTGOMERY ARCHITECTS 7645 LYNDN. E AVENUE SOUTH. o100 MINNE.~POUS, MINNESOTA 55423-4064* 612 . 861 . 9636 FAX: 612 . 961. 9652 WWW . TMIA~CHITECT9 . COM Z DATE= UCENSE #: _ · IDote 414102 Drown By IChecked By TLC Gi~IT I Project Architect GF¢ IN Project Number20~12r~A, 20n376 Revis;ons & Addendurns ELK RIVER ClTT HALL $ UTIL. ITIE5 ADDITION OVEP. ALL FLOOP- PLAN H H MECHANICAL H CITY HALL STORAGE 'A' UTILITY STORAGE H H H H H H 2,000 5F BST2 ~ UNEXCAVATEED CITY ~IALL STORAGE 'B' OPAP--.TIAL ~C:LE !/5" FLOOP-.PLAN - LOP,,IEP--. LEVEL 'A' J ' BLDG 7 ; INSP./ ,SPEC ~-Nv. SPEC. INSP METER READER~/ ELEC. UTIL. SUP. O2~F. LOBIS¥ DIRECTOR'S eL05. ROOF LINE A-B OPAP-.TIAL FLOOP-.PLAN - MAIN LEVEL 'A' KEY PLAN T U S H I E MONTGOMERY ARCHITECTS 7645 LYNDALE AVENUE SOUTH, S, M~£SOTA il 425 9656 FAX: 612 . 861. WWW . TMIARCHITECTS . COM Dote 4/4/02 Drown By Checked By TL~ Gl'fiT Project Architect GF¢ J~l Project Number 20112~A, 2011)~B Revisions & Addendums ELK: RIVER CITY HALL PUBLIC UTILITIES ADDITION PARTIAL I FLOOR PLAN 'A' LAKE ORONO OlmFJ~ VANDENBERG JUNIOR HIGH SCHOOL COUNTY COURT SOFT~ALL PARK LAKE ORONO DENOTES POSSIBLE SERVICE AREA FOR ORONO ROAD EXIST1NG FIRE STATION PROPOSED FIRE STATION SIGNALIZED INTERSECTION Emergency Vehicle Routes River from proposed Public Safety Facility ELK R~d~R HIGH SCHOOL PARK PARKER LINCOLN ELEMENI~Y ELEMENTR'~ SCHOOL SCHOOL 1781-H 177TH SHEET INDEX COVER StlEET / COLOR SITE PLAN PUBLIC SAFETY PERSPECTIVES PUBLIC SAFETY ELEVATIONS CITY ttALL & PUBLIC UTILITIES PERSPECTIVES CITY I IALL & PUBLIC UTILITIES ELEVATIONS SITE PLAN LANDSCAPE PLAN OVERALL FIRST FLOOR PLAN LOWER FLOOR PLAN SECOND FIZ)OR PLANS OVERALL CITY tlALL FLOOR PLAN PUBLIC UTILITIES FLOOR PLAN CITY I IALL & PUBLIC UTILITIES ELEVATIONS SITE SURVEY R.iver MONUMENT SIGN April 4, 2002 RI Elk River, Minnesota River Elk River, Minnesota April 4, 2002 R2 DECORATIVE STEEL STEEL SIGNAGE EAST ELEVATION ALUMINUM WINDOWS STONE ALUMINUM STOREFRONT WINDOWS BRICK ALUMINUM WINDOWS EIFS -- WEST ELEVATION PAINTED SIMULATED STONE INSULATED OVERHEAD DOOR GLASS EIFS BRICK ALUMINUM WINDOWS SOUTH ELEVATION DECORATIVE STEEL BEAM BRICK ALUMINUM STOREFRONT WINDOWS NORTH ELEVATION ALUMINUM WINDOWS BRICK EIFS R~ver ELK RIVE R PUB LIC SAFETY Elk River, Minnesota April 4, 2002 R3 0 0 RAver Elk River, Minnesota April 4, 2002 R4 WEST ELEVATION - City Hall ALUMINUM WEST ELEVATION - Public Utilities SOUTH ELEVATION - City Hall NEW SLOPED METAL ROOF SIMULATED STONE PIERS ~ DECORATIVE STEEL BEAM WITH COLORED AWNINGS NEW DECORATIVE STEEL BEAM WITH COLORED AWNINGS ~RICK ENTRY ARCH NEW ALUMINUM WINDOWS SIMULATED STONE HERS STEEL BEAM WITH COLORED AWNINGS SIMULATED STONE NEW BRICK CITY HALL & PUBLIC UTILITIES ELK RIVER Elk River, Minnesota April 4, 2002