MEMORANDUM
Item # 6.7.
TO:
FROM:
DATE:
SUBJECT:
Mayor and City C~u~
Michele McPhers6~, Director of Planning
April 15, 2002
Case No. CU 02-09
Allow Expansion to Existing City Hall and Construction of
New Public Safety Facility
Request
The Council is asked to consider an expansion to the existing City Hall and the construction
of a new Public Safety Facility.
Location
13065 Orono Parkway
Lot 1, Block 1, Lots 1-3, Block 2, Lots I and 2, Block 3, Gospodor's Orono Lake Addition
Zoning_ & Land Use
glc - Single Family Residential/MR - Medium Density Residential
Attachments
· Location Map
· March 29, 2002 Letter from Fire Chief Bruce West
· April 11, 2002 Memo from the City Engineer
· Site Plan
Preliminary Grading and Utility Plan
· Planting Plan
· First Floor - Public Safety
· Basement - Public Safety
· Second Floor Shell Space
· City Hall Floor Plan
Memo to Mayor and City Council/CU 02-09
April 15, 2002
Page 2
· Utilities Floor Plan
Exterior Elevations City Hall and Utilities
· Emergency Vehicle Routes
· Campus Illustration
Public Safety Elevations
· City Hall and Utility Elevations
Analysis
Building Expansion
The current City Hall and Police Station, (31,668 square feet), is proposed to be expanded in
order to accommodate Elk River Municipal Utilities and the City Attorney. The Utilities
addition (7,276 square feet) will be located on the northwest side of the building and will
require the removal of the dumpster enclosure as well as electrical transformers. The City
Attorney's expansion (1,863 square feet) will be located on the southwest corner of the
building and will also include a small addition for an expanded Cable Television area. Both
expansions meet the building setback requirements of the Rlc zoning district.
Public Safety Facility
The Public Safety Facility, (43,733 square feet), will include Police, Fire, and the Emergency
Operations Center. There will be basement that will house the EOC, the firing range, and
evidence room. A second story will be constructed as shell space that will allow future
expansion for the Police Department. Located north of the proposed Police Station will be
the Police impound lot, which will be enclosed by a six foot high fence. The Fire Station
will have room for up to six fire vehicles. The building meets the setback requirements of
the Rlc zoning district.
Site Impacts
In order to construct the Public Safety Facility, Orono Road will be removed to the Gary
Street intersection. This will create a common parking area for both facilities. As a result,
the Park and Recreation Commission will be reviewing and evaluating the Orono Park
Master Plan for recommended changes.
Also in conjunction with this project will be the closure and reopening of medians in Orono
Parkway. The berm and landscaped area in the medians will be lowered in order to improve
visibility for vehicles entering or leaving the City Hall Complex.
Parking Requirements
In order to accommodate the buildings, the parking lot will be expanded. Twenty-five
spaces will be located behind the Public Safety Facility, for police and fire staff. In addition,
up to 12 garage spaces for squad cars may be constructed.
S:\PLANNING\Case Files\CU 02-09 City Hall\4 15CCmemo.doc
Memo to Mayor and City Council/CU 02-09
April 15, 2002
Page 3
The total number of spaces required, based on gross building area is 214 (including
bathrooms, storage, Council Chambers, etc). This does not include the building area of the
fire garage, the EOC, the lower level of the Police Department, or the second level shell.
The number of spaces provided is 251. This includes six garage spaces and 37 spaces within
the impound lot.
Building Elevations
The buildings are proposed to be constructed of brick, rock face block, and E.I.F.S., all in
neutral, earth-toned colors. The existing cedar shake roof will be replaced with standing
seam metal in a complimentary color.
Landscape Plan
A landscape plan has been submitted that exceeds the ordinance requirements. Staff is
working with the Landscape Architect on a plan to reuse and/or relocate many of the
existing trees on the site. Native plant materials such as prairie grasses and flowers are
proposed in many areas to reduce maintenance, the need for irrigation, and the need for
chemicals. The landscape plan is being revised to reflect these changes.
Planning Commission Action
The primary concern of the Planning Commission at there meeting of March 26, 2002 was
traffic. They were concerned with emergency vehicle traffic on Orono Parkway, the distance
to Highway 10 if Orono Road was closed, and the level of traffic that could be supported by
Orono Parkway. The Fire Chief and City Engineer have addressed these issues in their
attached memo(s). Only two residents spoke regarding the proposal, and their concerns also
revolved around traffic, primarily the use of Orono Road by emergency vehicle traveling east
into downtown. Mr. Dilly, however, did express concern about reducing the glare from
lights.
The Planning Commission recommended approval of the request with the following
conditions:
2.
3.
4.
5.
THE BUILDING SHALL COMPLY WITH ALL APPLICABLE
BUILDING CODES.
THE LANDSCAPE PLAN SHALL BE REVISED TO COMPLY WITH
STAFF COMMENTS.
THE SIGNAGE SHALL COMPLY WITH THE INSTITUTIONAL
REQUIREMENTS OF THE R1C ZONING DISTRICT.
THE PARKING WILL MEET THE CODE REQUIREMENTS (214
SPACES).
SIGNAGE AND WARNING LIGHTS SHALL BE INSTALLED ON
ORONO PARKWAY TO WARN PEDESTRIANS AND MOTORISTS
OF EMERGENCY VEHICLES ENTERING.
A RESIDENTIAL ROOFING MATERIAL SHALL BE USED, EITHER
ASPHALT OR CEDAR SHINGLES.
S:\PLANNING\Case Files\CU 02-09 City Hall\4 15CCmemo.doc
Memo to Mayor and City Council/CU 02-09
April 15, 2002
Page 4
Recommendation
The City Engineer is currently working with the Minnesota Department of Transportation
regarding the appropriateness of condition Five above. Additional information will be
available at the meeting for the Council to consider.
The site plan has been revised to provide the required parking.
In regards to the use of standing seam metal roofing in a residential district, this building
material is becoming more popular in residential applications. The life span of this material
far exceeds that of other roofing materials. Proper color selection will ensure that the roof
will not be obtrusive to the adjacent neighborhood. Staff recommends that the condition
requiring asphalt or cedar shingles be deleted.
Staff recommends that the City Council approve the request to expand City Hall and to
construct a Public Safety Facility with the following conditions:
2.
3.
4.
THE BUILDING SHALL COMPLY WITH ALL APPLICABLE FIRE
AND BUILDING CODES.
THE LANDSCAPE PLAN SHALL BE REVISED TO COMPLY WITH
STAFF COMMENTS.
THE SIGNAGE SHALL COMPLY WITH THE INSTITUTIONAL
REQUIREMENTS OF THE RIC ZONING DISTRICT.
SIGNAGE AND WARNING LIGHTS SHALL BE INSTALLED ON
ORONO PARKWAY TO WARN PEDESTRIANS AND MOTORISTS
OF EMERGENCY VEHICLES ENTERING.
S:\PLANNING\Case Files\CU 02-09 City Hall\4 15CCmemo.doc
QIT¥
TOWER
PARK
ORONO
30UNTY
FAIR
;ROUNDS
ROAD~
SOFTBfLL
PARK
CITY
0 PARKWAY
ILiver
Case Number:
Location Map
N
CU 02-09 CITY HALL EXPANSION / PUBLIC SAFETY BLDG
River
Fire Department
415 Jackson Avenue
Elk River, MN 55330
March 29, 2002
Michele McPherson
City Planner
13065 Orono parkway
Elk River, MN 55330
Michele:
I would like to respond to the question of one of the Planning Commission members at
the Tuesday March 26, 2002 meeting, referencing the travel distance on Orono Road
versus Orono Parkway. I traveled both roads, on Wednesday March 27, 2002, from the
proposed exit driveway for the emergency vehicles, as they would enter either Orono
Road or Orono Parkway.
The distance from the exit of the proposed fire station onto Orono Road, then Orono
Road to the Joplin Street four-way stop is .5 of one mile. The distance from the exit of the
proposed fire station onto Orono Parkway, then Orono Parkway to Joplin St, proceeding
on Joplin St to the Joplin St, Orono Road four-way stop is .55 of one mile. The difference
is .05 of 1-mile travel distance.
The question was a valid concern in reference to possible "extra" travel distance because
of the closing of Orono Road. If you have any other questions, please feel free to call me
at the Elk River Fire Department.
Respectfully,
Bruce A. West
Fire Chief
Elk River Fire Department
Phone: 763.441.4919
Fax: 763.441.3299
www. ci.elk-rivenmn.tlS
Howard R, Green Company
April 11, 2002
File: 816940J-0240
Ms. Michele McPherson
Director of Planning
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330-0490
RE: PROPOSED PUBLIC SAFETY FACILITY
Dear Ms. McPherson:
This correspondence is intended to address some of the transportation issues
associated with the proposed construction of a new public safety facility on the City Hall
site. These are issues that were either raised at the Planning Commission Public
Hearing or discussed by staff at the project review meeting. They are as follows:
1. EMERGENCY VEHICLE ROUTING
As you are aware, the construction of the public safety facility will eliminate Orono
Road from Orono Parkway to the intersection of Orono Road and Gary Street.
Orono Road has always been viewed as temporary and, in fact, is not even a
platted right-of-way, but simply an easement through property owned by the City.
The proposed route for emergency vehicles going to areas other than adjacent to
Main Street would be out onto Orono Parkway, west to Joplin Street and north to
TH 10 to the signalized intersection equipped with emergency vehicle preemption.
Fire Chief Bruce West has measured both this route and the currently available
route of Orono Road north from City Hall to Joplin Street and then to TH 10. He
has reported that the difference in the two routes is less than 1/10th of a mile.
Concern was raised at the public hearing before the Planning Commission
regarding whether or not it would be better for emergency vehicles to be able to
leave the new public safety facility and head north on Orono Road, to Gary Street
to get to TH 10. Staff is extremely concerned about this route because it goes
directly through an active park area with lake usage in the summer and softball
fields during the spring, summer, and fall months. Also, Gary Street at the
intersection of TH 10 is an uncontrolled intersection with relatively poor geometrics
regarding Gary Street and the vertical elevation of the road as it meets TH 10.
2. ORONO PARKWAY CAPACITY
An issue was raised regarding the expansion of the City Hall facilities and the
elimination of Orono Road in view of the traffic it would attract and force to use
Ltr 4-11-02 McPherson[1]
1326 Energy Park Drive · St. Paul, MN 55108 ° 651/644-4389 fax 651/644-9446 toll free 888/368-4389
Ms. Michele McPherson
April 11, 2002
Page Two
Orono Parkway and Joplin Street to Main Street. Current traffic counts taken in
1999 (additional counts are taken every four years and are scheduled for next
year) show a total average daily traffic of 850 vehicles on Orono Parkway. A 2-
lane, divided roadway with minimal turning movements such as Orono Parkway
can easily handle 7,000 to 10,000 vehicles per day before consideration should be
given to turning it into a 4-lane facility. Therefore, based on the relatively minor
volume of traffic currently on Orono Parkway, we see no reason to consider
expanding the number of lanes by narrowing the medians to provide two lanes of
traffic in each direction.
3. INTERSECTION OF ORONO PARKWAY AND JOPLIN STREET
With the elimination of Orono Road through the City Hall site, the intersection of
Orono Parkway and Joplin Street will likely see an increase in traffic. Currently,
that intersection has stop sign control on Orono Parkway with no traffic control for
vehicles traveling on Joplin Street. Consideration should be given to installing a 4-
way stop at this intersection to help facilitate the larger volume of traffic anticipated.
A 4-way stop sign is typically utilized at areas where the volume of traffic on each
road of the intersection is approximately the same. This will likely be the case at
this intersection, with the exception of Orono Parkway to the west, which
essentially serves only the townhouse development and Sandpiper Estates.
4. FIRE STATION WARNING DEVICE
Staff is currently reviewing the options available for warning the motoring public on
Orono Parkway of the presence of the fire station. Signing is the most typically
used type of warning device; however, staff is reviewing with Mn/DOT the
appropriateness of some type of flasher which potentially could be activated when
a fire vehicle is about to exit the building onto Orono Parkway. Staff will present
more information to the City Council on this issue when it becomes available.
5. ORONO PARKWAY IMPROVEMENTS
We are currently working on construction plans and specifications for the
necessary improvements to Orono Parkway. We will be bringing these forward to
the City Council for plan approval and authorization to advertise for bids in the near
future. The proposed improvements consist of closing median openings no longer
needed, creating new median openings to service the new City Hall expansion,
and modifications to the median. Currently, the median area is mounded earth that
is sodded. It is the intent of the plans and specifications to lower the median to the
curb height for the entire width of the median to improve visibility. Together with
this, the street lights will also need to be lowered. This lowering is planned for the
entire length of the median. An irrigation system will be installed. Currently, the
City Hall architects are reviewing plant treatment options for use in the median
area.
Howard R, Green Company
Ltr 4-11-02 McPherson[1] CONSULTING ENGINEERS
Honorable Mayor and City Council
April 11, 2002
Page Three
If you have any questions regarding the transportation issues associated with the
proposed new public safety facility, I will be in attendance at your April 15, 2002, City
Council meeting.
Sincerely,
Howard R. Green Company
Terry J/Maurer, P.E.
TJM:tw
Ltr 4-11-02 McPherson[1]
Howard R, Green Company
CONSULTING ENGINEERS
MOTTLED 5OIL ~RING -
r
I
I
I
~ A ppP.,~/Ir"IAT E
;-REA OF GEC~ELL-
F!ELP
CpAGUE Td ' J~NR¥
SCREEN SE UT FENCE
SEE DETAL
C~4AIN
FENCE
CARD
REAPER
CONCRETE
SEE CI/~L
SPACE
CCNCRETE
SEE CI/IL-
CCNC~ETE
pARKING
CONCRETE
SEE Gl/iL
37 SPACE
IMPOUND ~
PARKING LOT
LOADING
· SEE !PUTUF
25
.~EME~GENC%
pER~CNNEL
~- 9EE DETAIL
~ASEF1EN~-
~UTLINE
\
\
E.~N
nil
~--~NC LE~T ~-JRN S ,~N
SEE DETA!-
.,'~ENE~.AL ~ TE NC-~E5
r u s H I E
N~TE~ E/CEP~ ~ ~EN~ ~N~ CN ~U~JNTA~LE ~U~ ~N C~ J~E ~' 7645 LYNO~E AVE~ SOUTH,
F~O~ TWE BACK ~F C~B BTC~P~ ~/ F~NDAT ON5 A_L _~T-,NG 612,861. 9636 F~: 612 . 861. 9652
E/ ~T NG TA- - ~ ~ ~E~x ~ TT ~E~UI~E~ENT3 ..... ~T~N ' N~ :/~ ' /AT ~N TC p~C--~CT
- LAKE ORONO ~ ~
oBITE PLAN
Date 4/4/02
By ASl,4
By TL~ GMT
hitect DLP
;ct Number 20112~.
& Addendums
EL~ RIVER PUBLIC SAFET~
~ITE pLAN
LEGEND
QSUP-.VE"r' $S-2,
,
2-2'5
t
u z ~ E
Lot ~
ELK
RIVER
PUBLIC
SAFETY
T U S H I E
MONTGOMERY
ARCHITECTS
ELK RIVER, MINNESOTA JANUARY 28, 2002
-- i-' N~$C-', PE NOTES:
...... ~ x TAKE PRECEDENCE
~ "~ ALL UTILITIES AND 5T~UCTU~E3 DAMAGE TS UTILITIES AND 5T~UCTU'~E5 5~ALL , ~ . .
TREES ~ ---- '~ -~- D, ;¢A~ .... , ~ x, ARSHITECT5 APPROVAL p~IOR TS ANY EXCAVATION OR INSTALLATION ~
2~o-~ sumac ~k~ ~ '~-I~' ' ~ -~E~ ~ GRAB5 ~MULC~ M~Y BE USED ON RELATI/~L~ LE/EL ~RE~S ~
LANDSCAPE REQUIREMENT5
TREES REQUIRED PROPOSED
TREE SPECIES MIX REQUIRED PROPOSED
MAY NOT BE MA~E
PRIO~ WRITTEN CONSENT OF
ARChiTECT. ALt. COMMON LAW R~HTS
RESERVEO.
OR REPORT W~ PRE*
ANO THAT I AM A OUI. Y
LAJ~OSC~PE ARCHITECT UNDER
LAWS OF' TH([ STATE OF
GARY M. TUSNIE
c
DOD TD PRSPERT¥ LINE
CONCENTRAT ON
;N~NTAL PLANTING DESIGN DTRATEGIES:
/ARIET¥ OF NATI /E PLANT SPECIES FOR LESS
AND GREATER ~ILD~IFE /ALUE
REATE LARGE PLANT PflASSEB AND D:/E~GE PLANT
~ADE pA /E~ENT TO REDUCE MEAT GAIN AND
~A~N~ATER
USE PLANTINGS TO AI~ BUILDING ENERGY EF=ICIENC%
pLANTNG E/ERGREEN5 TO T~E N~ AND DECIDUOUS TREE5
~E~UCE TuIRFG~AS~ ~CW ~AS W~ ~A~ER FERTILI]ER
OPLANTING PLAN
N
Dote 414/02
Drown By ASIN
Checked By TL, GMT
Project Architect DLP
Project Number 201126
Revisions & Addendums
ELK RIVER PUBLIC SAFETT
PLANTING
PLAN
L3.0
OFULL _F I P-.ST
GARAG~ I!XPA~ION
LOCKED STOR~E
STa~
f40 ur. xe~)
I ~x~ ~-x6 I &xej ue I ~ i
FLOOR PLAN
T U S H I E
MONTGOMERY
ARCHITECTS
7645 LYNDN. E AVENUE SOUTH, elOO
M4NNEAPOLIS, MINNESOTA 55423-4084
612 .
Dote 4/4/02
Drown By
Checked By TL~ GMT
Project Architect DLP
Project Number 2OII26
Revisions & Addendums
ELK. RIVER PUBLIC SAFE'I-T'
FIRST FLOOR PLAN
UNEXCAVATED
STORAGE
5ECURI'D~
VESTIBULE
BREAK ROOP1
~=; E.O.C. / TRAINING
GUN RANGE
UNEXCAVATED
m
T U S H I E
MONTGOMERY
ARCHITECTS
7645 LYNDALE AVENU~ SOUTH, °100
MINN[A*°OLIS, MINNESOTA 55425-4084
612 . 661. 9636 FAX: 612 . 861. 9652
WWW . TMIARCHITECT9 . COM
NAU~: DANIEL L. PELLINEN
N
Dote 4/~4102
Drown By
Checked By TL~ GP1T
Project Architect DLP
Project Number 201t2G
Revisions & Addendums
ELK RIVER PUBLIC SAFETY
LOi, q E P-, LEVEL
FLOOP. PLAN
A1.0
O~EN TO
FLOOR. PLAN
HEZZANINE
(~flEZZA_ NINE)_
F LOOP--_ PLA~ ~
N
U S H I ]
2ONTGOMER~
RcHITECT
LYNDALE AVENt~ SOUTH.
m~ ~,,,
Revisions ~ AddendumS
GEXIBTING- UPPER LEVEL
U21~8¥
L
AREA CALCULATIONg:
OOVEP-..ALL MAIN LEVEL FLOOR _PLAN
BLDG. flArRf.
6T0~E
FILE
II
T U S H I E
MONTGOMERY
ARCHITECTS
7645 LYNDN. E AVENUE SOUTH. o100
MINNE.~POUS, MINNESOTA 55423-4064*
612 . 861 . 9636 FAX: 612 . 961. 9652
WWW . TMIA~CHITECT9 . COM
Z
DATE= UCENSE #: _
·
IDote 414102
Drown By
IChecked By TLC Gi~IT
I Project Architect GF¢ IN
Project Number20~12r~A, 20n376
Revis;ons & Addendurns
ELK RIVER ClTT HALL $
UTIL. ITIE5 ADDITION
OVEP. ALL
FLOOP- PLAN
H
H
MECHANICAL
H
CITY HALL
STORAGE 'A'
UTILITY STORAGE
H H
H H
H H
2,000 5F
BST2 ~
UNEXCAVATEED
CITY ~IALL
STORAGE 'B'
OPAP--.TIAL
~C:LE !/5"
FLOOP-.PLAN - LOP,,IEP--. LEVEL 'A'
J
' BLDG 7
; INSP./ ,SPEC
~-Nv.
SPEC.
INSP
METER
READER~/
ELEC. UTIL. SUP.
O2~F.
LOBIS¥
DIRECTOR'S
eL05.
ROOF LINE
A-B
OPAP-.TIAL FLOOP-.PLAN - MAIN LEVEL 'A'
KEY PLAN
T U S H I E
MONTGOMERY
ARCHITECTS
7645 LYNDALE AVENUE SOUTH,
S, M~£SOTA il 425
9656 FAX: 612 . 861.
WWW . TMIARCHITECTS . COM
Dote 4/4/02
Drown By
Checked By TL~ Gl'fiT
Project Architect GF¢ J~l
Project Number 20112~A, 2011)~B
Revisions & Addendums
ELK: RIVER CITY HALL
PUBLIC UTILITIES ADDITION
PARTIAL I
FLOOR PLAN 'A'
LAKE
ORONO
OlmFJ~
VANDENBERG
JUNIOR HIGH
SCHOOL
COUNTY
COURT
SOFT~ALL
PARK
LAKE
ORONO
DENOTES POSSIBLE SERVICE AREA
FOR ORONO ROAD
EXIST1NG FIRE STATION
PROPOSED FIRE STATION
SIGNALIZED INTERSECTION
Emergency Vehicle Routes
River from proposed Public Safety Facility
ELK R~d~R
HIGH SCHOOL
PARK
PARKER LINCOLN
ELEMENI~Y ELEMENTR'~
SCHOOL SCHOOL
1781-H
177TH
SHEET INDEX
COVER StlEET / COLOR SITE PLAN
PUBLIC SAFETY PERSPECTIVES
PUBLIC SAFETY ELEVATIONS
CITY ttALL & PUBLIC UTILITIES
PERSPECTIVES
CITY I IALL & PUBLIC UTILITIES
ELEVATIONS
SITE PLAN
LANDSCAPE PLAN
OVERALL FIRST FLOOR PLAN
LOWER FLOOR PLAN
SECOND FIZ)OR PLANS
OVERALL CITY tlALL FLOOR PLAN
PUBLIC UTILITIES FLOOR PLAN
CITY I IALL & PUBLIC UTILITIES
ELEVATIONS
SITE SURVEY
R.iver
MONUMENT SIGN
April 4, 2002
RI
Elk River, Minnesota
River
Elk River, Minnesota
April 4, 2002
R2
DECORATIVE STEEL
STEEL SIGNAGE
EAST ELEVATION
ALUMINUM WINDOWS
STONE
ALUMINUM STOREFRONT WINDOWS
BRICK
ALUMINUM WINDOWS
EIFS --
WEST ELEVATION
PAINTED
SIMULATED STONE
INSULATED OVERHEAD DOOR
GLASS
EIFS
BRICK
ALUMINUM WINDOWS
SOUTH ELEVATION
DECORATIVE STEEL BEAM
BRICK
ALUMINUM STOREFRONT WINDOWS
NORTH ELEVATION
ALUMINUM WINDOWS
BRICK EIFS
R~ver
ELK RIVE R PUB LIC SAFETY
Elk River, Minnesota April 4, 2002 R3
0
0
RAver
Elk River, Minnesota April 4, 2002 R4
WEST ELEVATION - City Hall
ALUMINUM
WEST ELEVATION - Public Utilities
SOUTH ELEVATION - City Hall
NEW SLOPED METAL ROOF
SIMULATED STONE PIERS
~ DECORATIVE STEEL BEAM
WITH COLORED AWNINGS
NEW DECORATIVE STEEL BEAM
WITH COLORED AWNINGS
~RICK ENTRY ARCH
NEW ALUMINUM WINDOWS
SIMULATED STONE HERS
STEEL BEAM
WITH COLORED AWNINGS
SIMULATED STONE
NEW BRICK
CITY HALL & PUBLIC UTILITIES
ELK RIVER
Elk River, Minnesota April 4, 2002