7.6. SR 4-15-2002 Howard R, Green Qompany Item 7.6. April 11, 2002 Files: 809230J-0325 809235J-0325 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: TH 10 INTERREGIONAL CORRIDOR STUDY TH 169 INTERREGIONAL CORRIDOR STUDY RESOLUTION IN SUPPORT OF INTERREGIONAL CORRIDOR MANAGEMENT PLAN Dear Council Members: Mn/DOT is requesting that the City of Elk River adopt a resolution for both the TH 10 and TH 169 Interregional Corridor Management Plans. City staff had originally anticipated that the City Council would not consider these resolutions until there was an opportunity for the City Council to hold public headngs with Mn/DOT and the consultants for the studies available to present the plan and the City Council to take feedback from the public. However, recently City staff has been informed that the City of Elk River is apparently the only governmental jurisdiction involved in the studies that has not considered adopting the resolutions regarding the Corridor Management Plans. Therefore, staff has decided to bring these resolutions forward at this time. There are several different ways the City Council can approach this issue. City Council could consider one of the following options or a variation. The options staff sees are as follows: Take no action on the resolutions and let the final Corridor Management Plans be published without a resolution from the City of Elk River. Adopt a resolution that simply states that the City of Elk River was a participant in the planning process and does or does not agree with the vision statement or goals of the plan. Adopt the resolution in the format suggested by Mn/DOT with a list of issues that need further discussion. These issues could be as specific as commenting directly on portions of the plan recommendation, or as generic as identifying segments that need further discussion and planning before the City is willing to accept them. Attached to this correspondence are the following items from each Interregional Corridor Management Plan: 1. Draft resolution presented by Mn/DOT. Ltr 4-11-02 Council2 1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Honorable Mayor and City Council Apdl 11, 2002 Page Two 2. Vision Statement/Goals. 3. Sections of the plan that discuss proposed improvements pertaining to the City of Elk River. 4. Tables dealing with the pdodtization of projects and costs relative to improvements within the City of Elk River. I will be available at your Apd115, 2002, meeting to discuss this issue further and answer questions relative to the two Interregional Corridor Management Plans. Sincerely, Howard R. Green Company Terry J. Maurer, P.E. TJM:tw Attchs. Ltr 4-11-02 Council2 Howard R, Green Company CONSULTING ENGINEERS SAMPLE CMP RESOLUTION I ! i I ! WHEREASj Minnesota's State Transportation Plan recognizes the significance of interregional highway corridors in providing citizens and businesses throughout the State of Minnesota with high quality access to recreational, educational, employment and health care opporttmities, and to the transport of products and services produced by our local economy to regional, national and global markets; and, WHEREAS...; TH 101-TH 169 has been identified by the Minnesota Department of Transportation as a High Priority Interregional Corridor from Rogers to Zimmerman and a Medium Priority Interregional Corridor from Zimmerman to Garrison that enhances the economic vitality of the state and provides essential access for central Minnesota counties and cities to major economic markets and cultural centers including the St. Paul-Minneapolis metropolitan area and, WHEREAS_, the continued growth of the region is leading to increasing travel demand in the ~orridor and development pressure adjacent to the corridor which, if unmanaged, can negatively affect the level of performance, safety and congestion experienced by users of the corridor; and, WHERAS, community leaders, motorists and road authorities have identified this growing travel demand and development pressure as a concern with potential negative consequences for mobility and safety in the corridor, with the potential to degrade the performance level now provided by the corridor, and the resulting implications for the economy and quality of life of the region; and, WHEREAS, the Minnesota Department of Transportation, recognizing the potential impact of continued growth pressure on the corridor, has completed an Interregional Corridor Management Plan in partnership with its partners along the corridor to look at the long-term role that TH 101-TH 169 will play in meeting the transportation needs of central Minnesota; and WHEREAS, it is imperative at this critical time that a long-term vision for the type of service that the TH 101-TH 169 corridor needs to be established and that the steps are identified and initiated to: 1. Preserve the function of the corridor through advance planning, not only for the TH 101- TH 169 corridor but local supporting street systems and land use and development patterns; and, 2. Secure the needed h.mding to pursue the vision established for the corridor; and, 3. Establish a plan of action for the development of planning and programming activities that will proactivety address the needs identified. NOW THEREFORE BE IT RESOLVED, the (City, County, Township, etc.) of (insert name of City, County, Township, etc.) endorsed the vision and corridor management plan for TH 101- TH 169. I I i i I FURTHERMORE BE IT RESOLVED, the (City, County, Township, etc.) of (insert name) endorsed the concept that an adequate network of supporting roads is necessary to attain the TH 101-TH 169 corridor vision and that the roadway networks identified in the TH 101-TH 169 Corridor Management Plan will be considered as interim guides until such time as refinements to these improvements are identified. FURTHERMORE BE IT RESOLVED, the (City, County, Township, etc..) of (insert name) recognized the regional significance of the corridor in supporting the regional economy and intends to reflect the TH 101-TH 169 Corridor Management Plan vision, strategies and policies through updates to the (insert name of City, County, Township etc.) land use and transportation plans as well as subdivision ordinances. FURTHERMORE BE IT RESOLVED, the (City, County, Township, etc.) of (insert name) is committed to working in partnership with Mn/DOT and the other partners along the corridor as a member of the TH 101-TH 169 Corridor Management Team in order to achieve the vision and implement the recommendations of the TH 101-TH 169 Corridor Management Plan. BE IT FURTHER RESOLVED, the (City, County, Township, etc.) of (insert name) intends to bring forward the following issues for resolution and discussion with the TH 101-TH 169 Corridor Management Team: List issues here Signature Block TH 101 - TH 169 CORRIDOR MANAGEMENT PLAN (DRAFT) FEBRUARY 2002 Rogers, Elk River, Princeton and Milaca. The second round of public open houses was held March 18 and 19, 2002 at two locations: Princeton and Elk River. Members of the CMP project team were available at each meeting to answer questions and obtain input. 1.3 Corridor Vision Statement and Need for Action 1.3.1 Corridor Vision Statement Developing a corridor vision for 2025 involved several steps, including the early development of a Vision Statement (see box below). The Vision Statement established the basic goals of the corridor planning process, included 2025 performance goals, and outlined the roles that Mn/DOT and other corridor partners can expect to play as the planning process moves toward implementation. The vision statement was developed with input from the corridor partners after a process of issue identification, preliminary traffic forecasting, and early performance predictions. The corridor partners considered how the highways serve their communities, what they perceived as an acceptable level of service, and what they felt was an acceptable level of impact to local and through transportation systems. Corridor partners desires and concerns about future performance of the corridor were addressed through a continual refinement of the vision statement. The following steps outline the process used to refine the vision statement: · Review corridor issues, deficiencies, and objectives · Identify alternative strategies or improvement concepts · Analyze and discuss advantages and disadvantages of the improvement concepts · Determine short- and long-term consensus approaches by corridor partners TH 101 - TH 169 Corridor Vision Statement 1. CORRIDOR MANAGEMENT PLAN GOALS The CMP will be developed to achieve a balance between the needs and visions of individual communities and the safe and efficient movement of people and goods. Specifically, the planning process will strive to minimize adverse community effects while maintaining or improving both interregional and local traffic operations. 2. HIGHWAY PERFORMANCE GOALS Mn/DOT and its corridor partners have established the future highway performance goals (2025) for the TH 101-TH 169 IRC as follows: · Improve travel time performance and predictability to meet the target speed of 60 mph for the high priority segment from Rogers to Zimmerman, minimizing delays on TH 101-TH 169 and on intersecting roadways. · Maintain or improve travel time performance and predictability to meet the target speed of 55 mph for the medium priority segment from Zimmerman to Garrison, minimizing delays on TH 169 and on intersecting roadways. · Improve safety to achieve crash rates better than the statewide average, limiting conflicts between the various vehicle types and pedestrians. 3. IMPLEMENTATION APPROACHES AND ROLES These goals will be achieved by focusing highway project investments, guiding future land use patterns, and managing highway access points. Mn/DOT and its corridor partners will provide leadership toward the achievement of corridor goals by sharing their visions, promoting projects or initiatives, and protecting or enhancing community image and natural resources. 1-7 22~ st St ~ Project #8 New interchange at 221st Avenue Cu;rant Design Project 'New interchange at CsAH 33 OCSAH 33 I (2003 I:.ettinq)' :'-:'  197th AVe Project #7 Elk River New interchange (possible split diamond) Jackson Ave ~ at Jackson and 197th Avenues Project #6 School St New interchange at Main Street Overpass at School Street :~ Main St ~ Project #5 Improved interchange at TH 10 Project #4 CSAH 39: New interchange at CSAH 39 Otseg° Project #3 New interchange at CSAH 37 Overpass at CSAH 42 Project #2 New interchange at CSAH 36 St. Michael ~ ' Improved interchange at 1-94 New interchanges or overpasses at Legend Rogers {~ Rogers Drive CSAH 144 and Rogers Drive Existing Interchange Current Design Project Proposed Interchange Proposed Overpass Roads Project Boundary N Potential Highway Improvement Projects Figure 5-1 0.500.51 Miles Page 1 of 2 TH 101 - TH 169 CORRIDOR MANAGEMENT PLAN (DRAFT) FEBRUARY 2002 the monetary value of both advantages (benefits) and disadvantages (costs) of various highway projects. The result of a benefit-cost analysis is a ratio that indicates the economic desirability of a project from a monetary point of view. Generally, an investment is considered economically viable when the benefits exceed the costs--in other words, when the benefit-cost ratio is greater than one. While the benefit-cost ratio is a valuable tool, it is also important to weigh the results of the analysis against additional factors such as environmental, social, and other community impacts. The results of the benefit-cost analyses for the 13 potential projects are summarized in Table 5-3. TABLE 5-3 Highway Improvement Projects Benefit-Cost Ratios and Cost Estimates Construction Project Number and Name (all project.costs include frontage roads and 20% of project cost right-of-way estimate) 4-lane Freeway Conversion Upgrade to 6-lane Freeway Cost Estimate Benefit - Cost Estimate Benefit- (million $) Cost Ratio (million $) Cost Ratio 1: Rogers (growth area 1) -Improved and new interchanges from 1-94 to CSAH 144 2: St. Michael (growth area 2) - New interchange at CSAH 36 3: Otsego A (growth area 2) - New interchange at CSAH 37; overpass at CSAH 42 4: Otsego B (growth area 2) - New interchange at CSAH 39 5: Elk River A (growth area 3) - Improved interchange at TH 10 6: Elk River B (growth area 3) -New interchanges at Main Street; overpass at School Street 7: Elk River C (growth area 3) - New interchange (possible split diamond concept) at Jackson/197th, south of future CR 33 interchange 8: Elk River D (growth area 4) - New interchange at 221 st Avenue 9: South of Zimmerman (growth area 5) - New interchange at CR 36/CR 45 10: Zimmerman (growth area 6) - New interchange at CSAH 4 11: North of Zimmerman (growth area 7) - New interchange at 277th Avenue 12: South of Princeton A (growth area 8) - Future CSAH 9 interchange 13: South of Princeton B (growth area 8) - New interchange at CR 38 $66 5.3 Add $15 4.4 million $16 19.4 Add $4 million 15.0 $17 8.0 Add $6 million 5.9 $11 6.8 Add $3 million 5.2 $29 3.3 Add $5 million 2.8 $13 9.1 Add $3 million 7.38 $16 15.4 Add $6 million 10.61 $12 0..8 $15 0.9 $21 2.7 $17 0.5 $7 1.4 $9 0.8 5-8 TH 101 - TH 169 CORRIDOR MANAGEMENT PLAN (DRAFT) FEBRUARY2002 planning and development reviews, and would prevent new signals from being installed. A possible final stage of project development would be the 6-1ane segment from north of Rogers to Elk River. Planning for this last phase would begin in 15 to 20 years. To further its project prioritization work for multiple IRCs, Mn/DOT has categorized various IRC projects as follows (with reference to the projects identified in this CMP): · Category I Projects. Already prOgrammed--includes: (a) the Sherburne CR 33 interchange project, (b) the Sherburne CSAH 9 interchange project, (c) safety improvements at Mille Lacs CSAH 11, and (d) the upgrade of TH 169 to four lanes from Onamia to Garrison. These projects are already included in the State Transportation Improvement Program (STIP) or the Work and Studies Plan. · Category II Projects. Strategic Projects to Reach IRC Performance Targets--includes: (a) seven potential projects to upgrade TH 101-TH 169 to a 4-lane freeway from 1-94 in Rogers through Jackson/197th Street in Elk River; and (b) the development of a new interchange at CSAH 4 in Zimmerman. As previously discussed, these projects are considered the top priorities for further study and development because they will be necessary to achieve IRC speed and safety performance targets. · Category III. Long-Term Vision Projects to Achieve Other Goals--includes: (a) potential expansion of a future four-lane freeway to six lanes from Rogers through Elk River; (b) five potential future upgrades (new interchanges) to achieve a continuous freeway from Elk River to Princeton; and (c) access consolidation and related actions along unsignalized expressway from Princeton to Onamia. The above-referenced projects are also listed individually by category, with estimated costs, in Appendix D--see Table D-4, page D-10. The recommended process to actually manage the corridor in the future, discussed in Section 5.4 below, is built around these project priorities. 5.4 Corridor Management Recommendations Several recommendations have been developed based on preliminary project performance evaluations and prioritization work. The recommendations are structured to identify the highest priorities for follow-up actions to be taken as the planning process concludes. The responsibilities of corridor partners relative to each of these recommendations are also discussed. Mn/DOT will play the largest role in the implementation of these recommendations; however, the corridor vision could not have been successfully developed, nor can it be successfully implemented, without the cooperation of city, county, and township governments. Additionally, environmental stakeholders, such as the Minnesota Department of Natural Resources and the Minnesota Pollution Control Agency, have participated in the CMP process and will undoubtedly continue to do so in the future. 5-10 HIGHWAY t01/~69 CO~lOOII PtAN HIGHWAY 10 CORRIDOR PLAN Newsletter for the Highway 10 lnterregional Corridor, 1-35W to Hwy 24 Issue 2: April 2002 You are invited to a Public Information Open House For the Highway 10 Interregional Corridor Tuesday, April 9, 2002 - Big Lake Middle School Wednesday, April 10, 2002 - Coon Rapids City Center Both meetings are scheduled from 4:30 to 7:00 PM The same information will be presented at each meeting. Review the Draft Corridor Management Plan The Minnesota Department of Transportation (Mn/DOT) is inviting the public to a Public Information Open House to review and comment on the Draft Corridor Management Plan for the Highway 10 Corridor. Mn/DOT staff and its consultant Howard R. Green Company (HRG) will be there to share the information gathered and analyzed in the development of the Draft Corridor Management Plan. We need your input now before the Corridor Management Plan is finalized. What is the Highway 10 Corridor? The Highway 10 Corridor is approximately 48 miles long and extends northwest from I-35W in Mounds View through Anoka and Sherburne Counties to the Highway 24 intersection in Clear Lake. Highway 10 is one of seven interregional corridors established by Mn/DOT in January 2000 to address future transportation needs that connect regional trade centers throughout the state. Development of Corridor Management Plan Input from the public meeting held in July 2001 was used, along with technical analysis of existing conditions to help identify that there are deficiencies in the corridor, what they are, and where they are located. The two advisory committees helped to develop an overall vision for the corridor. A sub area vision was developed for each of the three sub areas to address the needs of each. A range of alternatives were identified and evaluated against the measures of effectiveness to determine a number of project concepts that could address the deficiencies in the Highway 10 Corridor. Measures of effectiveness for the Highway 10 Corridor include mobility and traffic operations, safety, access and supporting roadway system, and alternative modes of transportation. Input from the Advisory Committees helped to refine the number of project concepts that were included in a concept-level cost estimate. A benefit/cost analysis was completed for the remaining project concepts that were then prioritized into short-, medium-, and long-term projects. Eight Project Concepts Fulfill Vision - Estimated Cost $460 Million Over 20+ Years The final list of alternatives includes eight major projects to address the future capacity and safety needs along the Highway 10 Corridor. The total cost for all projects along the roadway is estimated to be $460 million (2001 dollars). A number of interim projects to help improve safety and mobility have also been identified that could be completed before or concurrently with the major projects. The/<7sion for the corridor is to achieve a balance between regional mobility and local circulation. Plan Identifies Long-range Project Phasing and h~terim Projects The final set of long-range projects were prioritized. A potential implementation schedule was developed in the event that Mn/DOT is able to secure additional funding, as follows: · Short-Term 2002 - 2010 Medium-term 2010 - 2018 · Long-term 2018 - 2025 Interim projects were also identified that could be implemented in partnership with the cities and counties along the corridor prior to the implementation of the long-range projects. They include removing lane drops to provide roadway continuity; access management such as eliminating private driveways, closing medians, and developing a supporting roadway system; and operational and safety improvements that include median left-turn lanes, intersection street lighting, and revising traffic signal tin'ring. Where Are We? What's Next? Currently, the Draft Corridor Management Plan (Plan) is out for review and comment. The cities and counties are in the process of developing resolutions in support of the Plan to submit to Mn/DOT. The exceptions are issues that will need a continuing dialogue until resolution is reached. The next step is to finalize the Plan, which is scheduled for completion in May 2002. Public Meeting Dates - Locations: Tuesday, April 9, 2002 Big Lake Middle School 4:30 to 7:00 PM  U. S, Highway nO Big Lake Middle School Big Lake, Minnesota Wednesday, April 10, 2002 Coon Rapids City Center 4:30 to 7:00 PM FROM HIGHWAY 10: South on Hanson Blvd. Left on Robinson Drive Civic Center 1 mile on left. For more information, please contact: Brian Isaacson, Project Manager Mn/DOT Metro Division 1500 W. County Road B2 Roseville, MN 55113 Phone: 651/582-1659 Fax: 651/582-1166 E-Mail: brian.isaacson~dot.state.mn.us Minnesota Department of Transportation News Release ~,~.~1~ ~_,~4~ Metro Division ~0~ T~~ Phone:651/582-1000 1500 County Road B2 West Roseville, MN 55113 March 25, 2002 FOR IMMEDIATE RELEASE CONTACT: Todd Kramascz 651/582-1465 MN/DOT INVITES PUBLIC TO COMMENT AT OPEN HOUSES ON HIGHWAY 10 DRAFT CORRIDOR MANAGEMENT PLAN (ROSEVILLE, Minn.)~ The public is invited to a public information open house to review and comment on the Highway 10 Draft Corridor Management Plan. Mn/DOT and its consultant, Howard R. Green Company (HRG), will be there to share information gathered and analyzed in the development of the Draft Corridor Management Plan (CMP). Input from the public meeting held in July 2001, along with technical analysis of existing conditions, were used to help identify that there are deficiencies, wha! they are, and u, here they are located. A range of alternatives were identified and evaluated during the screening process. The final list of alternatives includes eight long-range projects to address the future capacity and safety needs along the Highway 10 Corridor. The total cost for all projects along the roadway is estimated to be $460 million (2001 dollars) over a 20+ year time frame. The open houses will be held from 4:30 p.m. to 7:00 p.m. as follows: Tuesday, April 9, 2002 at Big Lake Middle School, 501 Minnesota Avenue Wednesday, April 10, 2002 at Coon Rapids City Center, 11155 Robinson Drive --more-- 2-2-2-2-2 The steps in the process were to develop an overall vision for the corridor with help from the two advisory committees. A range of alternatives were identified and evaluated against the measures of effectiveness to determine a number of project concepts that could address the deficiencies in the Highway 1 0 Corridor. Measures of effectiveness lbr the Highway 10 Corridor include mobility and traffic operations, safety, access/supporting roadway system, and alternative modes of transportation. Input from the Advisory Committees helped to refine the number of project concepts that were included in a concept-level cost estimate. A benefit/cost analysis was completed for the remaining project concepts that were then prioritized into short-, medium-, and long-term projects. Interim projects were also identified that could be implemented in partnership with the cities and counties along the corridor prior to, or concurrent with, the implementation of the long-range projects. They include removing lane drops to provide roadway continuity; access management such as eliminating private driveways, closing medians, and developing a supporting roadway system; and operational and safety improvements that include median left-turn lanes, intersection street lighting, and revising traffic signal timing. The final Plan for the Highway 10 Corridor will be an overall blueprint to guide future steps for roadway improvements that address safety, mobility and access through the Highway 10 Corridor. --more-- 3-3-3-3-3 This segment of Highway 10 is approximately 48 miles long and extends northwest from 1-35W in Mounds View through Anoka and Sherburne Counties to Highway 24. The Highway 10 IRC Study is one or' seven corridor plans being conducted by Mtn'DOT statewide, and is part of the "Moving Minnesota" program. For further information, visit www.dot.state.mn.us/movingminnesota. Attached: Highway 10 corridor map ~lear Big Lake Elk ~iver ? ~!..} ' ' · ~'. '. % Highway 10 Interregional Corridor Stu0y Study Area Ramse' ol(a ~ ~ '. ......... : ipringLaI (Insert City. County, Township, etc. name) RESOLUTION NO. ACCEPTING, SUPPORTING, AND ADOPTING THE TH 10 INTERREGIONAL CORRIDOR MANAGEMENT PLAN WHEREAS, Minnesota's State Transportation Plan recognizes the significance ofimerregional highway corridors in providing citizens and businesses throughout the State of Minnesota with high quality access to recreational, educational, to the transport of products and services produced by and global markets; and, WHF. REAS, the TH 10 Interregional Corridor of Transportation as a High Priorit) Corridor from TH !69 to TH 24 providing essential access for Counties to major economic metropolitan area; and, WHEREAS, thc continued corridor which, congestion experienced health care opportunities, and [.economy to regional, national, by the Minnesota DeparUnent ~ to TH 169 and as a Medium Priority the economic vitality of the state in Sherburne, Anoka, and Ramsey including the ]Wanneapolis-St. Paul leading to increasing travel demand in the affect the level of performance, safety, and corridor; and, WHF. REAS, community leaders, motorists, and road authorities have identified this growing travel demand and development pressure as a cone, em with potential negative consequences for mobility and safety in the corridor, with the potential to degrade the performance level now provided by the corridor, and the resulting implications for the economy and quality of life of the region; and, WHEREAS, the Minnesota Department of Tran.~portation, reco~nizing the potential impact of continued growth pressure on the corridor, has completed an Interregional Corridor Plan in partnership with its parmers along the corridor to look at the long-term role that the TH 10 Corridor will play in meeting the transportation needs of the central region of Minnesota; and, WHEREAS, it is imperative at this critical time, with continued growth ocamrring in the region, that a long-term vision for the type of service that the TH 10 Corridor needs to provide be established and that the steps are identified and initiated to: 1. Preserve the fimcfion of the corridor through the advance planning, not only for the TH 10 Corridor but for the local supporting street systems and land use and development patterns; and, 2. Secure the needed funding to pursue the vision established for the corridor; and, 3. Establish a plan of action for the development ofp{anning and programming activities that ~ proactively address the needs identified. NOW THEREFORE BE IT RESOLVED, the (insert City, County, Township, etc of endorses the vision and corridor management plan for the TH 10 Corridor. FURTHFRMORE BE IT RESOLVED, the (insert City, County, Township, etc of ) endorses the concept that an adequate netwo~ of supporting roads is necessary to attain the TH 10 Corridor vision and that the roadway networks identified in the TH 10 Corridor Management Plan will be considered as interim guides until such time as refinements to these improvements are identified. FURTHF. RMORE BE IT RESOLVED, the (insert City, County, Township, etc of ) recognizes the regional significance of the corridor in supporting the regional economy and intends to reflect the TH 10 Corridor Management Plan ' ' and policies through updates to the (insert City, County, Township, etc of__ use and transportation plans as well as subdivision ordinances. FURTHERMORE BE IT RESOLVED, the committed to working in partnership member of the TH 10 Corridor the recommendations of the TH 10 Corridor BE IT FURTHER RESOLVED, bring forward the following' 1. List lssues Here Township, etc of )/s other partners along the corridor as a achieve the vision and implement Plan. Township, etc of ) intends to and discussion with the TH 10 Corridor 2 1.3 Vision Statement The development of the Vision Statement for the TH 10 corridor has been an evolving process. The overall draft Vision Statement was presented to the study's Policy and Technical Advisory Committees for their review and comment. With their input, the Vision Statement was revised and has guided the development of the application of the vision by subarea. The TH 10 overall vision for the corridor follows. TRUNK HIGHWAY (TH) 10 INTERREGIONAL CORRIDOR TH 24 to 1-35W (Clear Lake to Mounds View) VISION STATEMENT A Focus on Mobility, Safety, Balance, and Partnership The Vision for the TH 10 Interregional Corridor is to achieve a balance betwee: regional mobility and local circulation. The balance point will be dynamic along corridor and responsive to interregional connectivity goals and local commm'.,, needs. The Vision is to achieve interregional system goals for speed and safety as well at improve local circulation. Mobility should be addressed by providing a high qua of traffic flow and better managing access from adjacent land uses with a h' ~ priority on safety. Consistency with local land use plans is critical to implementatio,. The path from Vision to Reality is dependent on a partnership among all stakehold,'r to achieve a balanced mobility. Townships, cities, counties, Mn/DOT, other state local agencies, and the corridor stakeholders will need to plan and work together achieve intra-city access and intercity mobility. Subarea workshops were held to enlist the help of the two advisory committees in developing the application of the vision to the subareas. See Chapter 2 for a further discussion of the subarea workshops. TH IO Corridor Management Plan: TH 24 in Clear Lake to 1-35W January 2002 1-6 1NTROD UCTION 0 4'3 TH IO PROJECT PROFILE N Ja~nu,~¢¥ 2002 I000' PROPOSED OVERPASS PROPOSED ACCESS CLOSURE PROPOSED ALIGNMENT PROPOSED ALTERNATE ALIGNMENT CLOSE ROADWAY PROPOSED INTERCHANGE PROPOSED SIGNALIZED INTERSECTION Figure 5.3-4B Proiect Concept Layout: Waco Street to TH 169 1000' L PROPOSED OVERPASS PROPOSED ACCESS CLOSURE PROPOSED ALIGNMENT PROPOSED ALTERNATE ALIGNMENT CLOSE ROADWAY PROPOSED INTERCHANGE PROPOSED SIGNALIZED INTERSECTION Figure 5.3-5A Project Concept Layout: TH 169 to Sunfish Lake Blvd. (Freeway) ~.000' PROPOSED OVERPASS PROPOSED ACCESS CLOSURE PROPOSED ALIGNMENT PROPOSED ALTERNATE ALIGNMENT CLOSE ROADWAY PROPOSED INTERCHANGE PROPOSED SIGNALIZED INTERSECTION Figure 5.3-4A Proiect Concept Layout: Waco Streetto TH 169 Table 6.1-3 Breakdown of Year 2001 Project Costs by Estimated Timeframe and Jurisdiction Project Timeframe, Jurisdiction, and Estimated Costs Short-Term Medium-Term Long-Term Project Costs: Costs: Costs: No. Project 2002-2010 2010-2018 2018-2025 1 TH 24 to CSAH 8 $13,944,000 (D3) 2 CSAH 8 to CSAH 11 $13,397,160 (D3) 3 CSAH 11 to Wa¢o Street - CSAH 11 to Waco Street w/o $51,448,960 (D3) CSAH 14/15 Interchange3 -CSAH 14/15 Interchange $5,500,000 (D3) 4 Waco Street to TH 169 4A - Waco Street to 600' west of Proctor t 1525.998,767 (D3) [ - 600' west of Proctor to 950' east of $21,283,489 (D3) 4B Main St. 4C - 950' east of Main St. to TH 169 $5,754,240 (D3) $114,720,489 5 TH 169 to Sunfish (Metro) 6 Sunfish to Round Lake Boulevard $95,025,767 (Metro) Round Lake Blvd to TH 610 . $101,495,375 7 (8-1aries) (Metro) $14,250,338 8 TH 610 to 1-35W (8-lanes) * (Metro) Total by Timeframe: Metro Division $95,025,767 $114,720,489 $115,745,713 Total by Timeframe: District 3 $5,500,000 $78,486,689 $53,339,927 Grand Total by Timeframe $100,525,767 $193,207,178 $169,085,640 * Cost estimates for short-term, interim im ~rovements have not been developed. However, the long- term cost estimates provided for projects 7 ~nd 8 assume that NO interim improvement projects have been completed. ~FH 10 IRC Study Corridor Management Plan No. 813260d 6-5 January 2002 Alternative Staging and Implementation Table 6.1-2 Prioritization of Projects by Timeframe Project No. Project TH 24 to CSAH 8 CSAH 8 to CSAH 11 CSAH 11 to Waco Street - CSAH 11 to Waco Street w/o CSAH 14/15 Interchange3 - CSAH 14/15 Interchange Waco Street to TH 169 - Waco Street to 600' west of Proctor 600' west of Proctor to 950' east of Main St. - 950' east of Main St. to TH 169 TH 169 to Sunfish Lake Blvd Sunfish Lake Blvd to Round Lake Blvd Round Lake Blvd to TH 610 TH 610 to 1-35W Short-Term: 2002-2010 X X Project Timeframe IMedium-Term: 2010-2018 X X X X Long-Term: 2(~ 8-2025 X X X * Interim improvements should be completed in the short-term. TH 10 IRC Study January 2002 Corridor Management Plan 6-4 Alternative Staging and Implementation No. 813260J