Loading...
5.6. SR 03-11-2002Item 5.6, MEMORANDUM TO: FROM: DATE: SUBJECT: Mayor and City Council ei~r~ia~ii'2~ ii2Y A~atOr Public Safety Facility and City Hall Project Update The City Council last discussed the public safety facility, city hall expansion/remodeling, and utilities project on January 28, 2002. Since that time the expansion committee has met twice. Topics discussed include the geothermal heating/cooling system, security systems, parking lot and street layout, the FFE items and budget, the furniture layout for offices, the lowest possible floor elevation for the basement, and which building code is going to be in affect for this project. Additionally, each department has met with the architects to discuss their individual office layouts, FFE items, and building materials. These individual departmental meetings will continue throughout March. Geothermal System One of the key issues that has been addressed in February is whether or not to proceed with the geothermal heating/cooling system. The last part of the February 27 committee meeting was spent taking a tour of the Connexus facility, which has a geothermal heating/cooling system. At this point we are continuing to move forward with the geothermal heating/cooling system in the public safety facility. The geothermal system will cost more initially but will also cost less to operate. The additional capital cost is already in the building construction budget. The initial capital ouday will be up to an additional $200,000 over a conventional system but the payback for this capital investment is somewhere in a seven to nine year time period. Details on these two figures are expected soon. Key issues with the geothermal system relates to having the system properly designed, installed, and maintained. The committee believes that this can be done and that the system will operate efficiently. Maintenance will be an issue that the city needs to address in the 2003 municipal budget. The city will have to add employees to the building maintenance and cleaning program and will need to consider whether or not this operation should become an independent city department. March I I, 2002 Public SafetylCity Hall Page 2 of 2 Basement Elevation After the geothermal issue, the next most significant topic of discussion has been the lowest possible elevation for the basement floor. We are planning to error on the side of caution when looking at a possible wet basement verses a short ramp to connect the utilities addition to city hall. Additional soil boring tests were done in order to have a ground water modeling report completed. We wanted more information to see if we can build the addition without having a ramp. At this point we are following the architects recommendation on the floor elevation for the basement and this elevation makes it questionable as to whether or not we can get by without a ramp. Currently, a short ramp is planned in the vicinity of the building department entrance. This ramp will include a handrail and will be half the width of the hallway. The other half of the hallway will have two steps in order to accommodate the elevation change. Details are still being worked out and we hope to avoid a ramp situation, but this may not be possible. Project Review On March 12, 2002, the Utilities Commission is scheduled to review the building proposal and to set the budget for their project. This budget amount is needed in order for the total amount of the lease-purchase bond to be established. The conditional use permit (CUP) for the government building being constructed in a residential zone is going to the Planning Commission on March 26, 2002, and is scheduled to go the City Council on April 15, 2002. With this proposal, the City Council and Planning Commission will be looking at the typical CUP items, such as building setbacks, parking lot layout and lighting, entrance/exits onto roadways, building materials, landscaping, noise from emergency sirens, etc. No variances are needed with this request. This will be the first public hearing on the proposal and even though we are talking about the building construction issues, we are likely to get some public comments about the financing for the project. On April 8, 2002, the EDA and City Council are each going to hold a public hearing on the financing for the public safety and utilities buildings. The project is moving forward as a lease-purchase option with the EDA being the owner of the facilities until the bonds are completely paid. Construction Schedule Attached is the latest update of the project schedule. We hope to go out for bids and have them accepted by the City Council in May. The schedule calls for construction of the public safety facility, utilities addition, and the city hall addition to begin in June 2002. Additionally the plan calls for the construction projects to be completed within a year. Once the utilities addition is completed, all of the city hall staff will move into this office (including the basement area). After the remodeling of the city hall and police station is completed (approximately six months), then the city staff will move back into this newly remodeled area and the utilities area will be "touched up." Utilities staff will move in somewhere around late winter or early spring 2004. ELK RIVER CITY HALL COMPLEX EXPANSION ELK RIVER, MINNESOTA PROJECT SCHEDULE CRITICAL DATES JANUARY 2, 2002 REVISED MARCH 1, 2002 T U S H I E MONTGOMERY ARCHITECTS Requires Completion City, EDA, Date ACTIVITY Utility Commission Action City Council determines size and scope of project · CC January 14, 2002 Complete Preliminary Project Design January 28, 2002 Select Construction Manager ·CC January 28, 2002 City Council authorizes TMA to proceed with design development ·CC January 28, 2002 and construction documents Utility Submit design drawings to Planning Commission for public review February, 2002 and approval Submit design drawings to City Council for public review and final · CC March, 2002 design approval Complete design development documents February 28, 2002 Complete construction documents for Public Safety April 30, 2002 Start bond proceeds for Public Safety Building · EDA May 10, 2002 Complete public bidding process and award construction contracts · EDA May 13, 2002 for Public Safety Start Construction of Public Safety Building June 1,2002 Complete construction documents for Utility Building addition April 30, 2002 Complete public bidding process and award construction contracts · May 13, 2002 For Utility Building addition Utility Start construction of Utility Building addition June 1,2002 Complete construction documents for City Hall renovation and April 30, 2002 expansion Complete public bidding process and award construction contracts · CC May 13, 2002 For City Hall work (additions) Start const'ruction of City Hall Building additions June 1,2002, Remove existing City Hall furniture to be renovated for Public March 28, 2003 Safety Have rental furniture for City Hall in place - existing space only March 30, 2003 Complete construction of Public Safety Building May 30, 2003 Owner move-in to Public Safety Building June 1 - 16, 2003 City Hall move-in to Utility and Attorney additions June 1 - 16, 2003 Complete construction of Utility Building addition May 30, 2003 Start construction on renovation of existing City Hall space June 17, 2003 Purchase new furniture for City Hall space · CC October 13, 2003 Complete construction of renovated Public Safety City Hall space December 31,2003 Owner move-in to renovated Public Safety and City Hall space January 2 - 16, 2004 Freshen up Utility Building space after City vacates Jan 17 - Feb 14, 2002 Owner move-in to Utility addition space Feb 15 - 28, 2004