6.3. SR 01-22-2002MEMORANDUM Item # 6.3. TO: FROM: DATE: SUBJECT: Mayor and City Council Michele McPherson, Director of Planning January 22, 2002 Case No. V 01-08 Request by Mike Jones to Allow a Slope Greater than 3: I Without a Retaining Wall Request The applicant requests that a variance be granted to allow a slope greater than 3 feet horizontal to 1 foot vertical (3:1) to exist without a retaining wall. Attachments · Location Map · January 3, 2002 Letter from Talberg Lawn and Landscape · Memo from the City Engineer · June 19, 2000 Letter from NSP · October 23, 2001 Board of Adjustments Meeting Minutes Location 11740 200th Avenue NW (Lot 2, Block 2, Brentwood) Zoning/Land Use Rla, Single Family Residential (2 ~ acre lot minimum) / LR, Low Density Residential Analysis The subject property is located at the end of 200th Avenue in the Brentwood Subdivision. This is one of a few lots in Brentwood that are still vacant due to the fact that they are encumbered by a 240' wide Northern States Power Company easement. In this case, the easement covers approximately 90 percent of the lot. In order to construct the home, the Memo to Mayor and City Council/V 01-08 January 22, 2002 Page 2 applicant received approval from Northern States Power Co. to allow location of the septic system and retaining wall within the easement. The applicant is requesting that the existing slope be allowed to remain and that any exposure of the slope be corrected by the use of erosion control blankets and seed mix. The applicant received a building permit to construct a home on the subject property in August of 2000. A temporary certificate of occupancy was issued on January 11, 2001 until June 1, 2001, based on the fact that the home needed landscaping, final grading, a driveway, sidewalks and a retaining wall. The applicant's bank has escrowed money for the retaining wall, final grading and the driveway. The applicant has requested a variance not to install a retaining wall on the property and to allow a slope of greater than 3:1. In preparation for this report, the City Engineer and staff observed the site and determined that: 1) the slope is greater than 3:1, it is almost a 1:1 slope 2) that based on the extreme gravel content of the soil, an erosion control blanket and seeding would not provide adequate slope stabilization for the site. In order to grant a variance from the literal interpretation of the ordinance, the following five conditions must be met: 1. Literal enforcement of the ordinance will cause undue hardship. The hardship is caused by special conditions and circumstances, which are peculiar to the property and the structure involved and which are not characteristic of, or applicable to, other lands or structure in the same area. 3. The literal application of the provisions of this ordinance would deprive the petitioner of rights enjoyed by other properties in the same district under the terms of this ordinance. 4. The special conditions and circumstances are not a consequence of the petitioner's own action or inaction. The variance will not be injurious to or adversely affect the health, safety or welfare of the residents of the city or the neighborhood where the property is located and will be in keeping with spirit and intent of the ordinance. Literal enforcement would require the applicant to spend additional money (currently escrowed) on the retaining wall required by code. The site is unique in the fact that the property is encumbered by a large utility easement; however, there are other sites in the area encumbered by the same utility easement. The applicant could have chosen a different style home to place on the lot to reduce the impact on the existing slope. Literal application of the ordinance provisions would require the applicant to install the retaining wall as required. S:\PLANNING\Case Files\V 01-08 Jones\V01-08BA.DOC Memo to Mayor and City Council/V 01-08 January 22, 2002 Page 3 The special conditions are a consequence of the applicant's site and home style selection. The request would not adversely impact other properties in the vicinity; however, it could adversely impact the property itself if the erosion increased. Severe erosion was observed on the site due to the rocky and gravel-laden soil. There are a number of lots remaining in the Brentwood Subdivision that are encumbered by large power line easements. Staff feels that due to the soil types, a retaining wall is appropriate and that a variance should not be granted to allow a slope greater than 3:1 to be maintained with an erosion control blanket. Action by the Board of Adjustments The Board of Adjustments voted unanimously to recommend denial of the request, as the five conditions to grant a variance were not met by the applicant. Review of the Applicant's Revised Information The City Engineer has reviewed the revised information submitted by the applicant and is recommending that the request by denied. The applicant has adequate room to build retaining walls that would reduce the slope to 3:1 as required by the code. There are numerous sites in the City that would be affected by a decision to allow slopes greater than 3:1 as requested by the applicant. Recommendation Staff recommends that the City Council deny the request to allow a slope greater than 3:1. S:\PLANNING\Case Files\V 01-08 Jones\V01-08BA.DOC Site JUNIOR SCHO0 Case Number: Location Map V01-08 Mike Jones N --jALBERG AWN & lANDSCAPE , INC.® 11770 JUSTEN CIRCLE · MAPLE GROVE, MINNESOTA 55369 PHONE: (763) 428-3550 · FAX: (763) 428-3419 EMAIL: info @ talberg-lawn.com January 3,2002 To Whom It May Concern: This letter is in regard to the Mike Jones residence located at 11740 200~ Ave NW. Following a meeting with Michele McPherson (City of Elk River Planning Commition), Frank Kriz (Howard R Green), and myself Jeff Hansen (Talberg Lawn & Landscape, Inc.) I have compiled the following data and I am proposing the following solution to the erosion and slope issue at the above address. Since the meeting we have had an as-built topographical survey done by John Oliver & Associates to accurately determine the current slops. We also have received an 'As Built' of the septic system and ovedaid it on the survey. I also meet with an erosion control expert on site and had several phone conversations with the Anoka County Soil and Water experts. After researching this matter with the above people it is my belief that no retaining wall of any size should be required on this hillside. Installing a retaining wall would require that virgin soil be disturbed for installation of the wall and its GEO grid. That would create the potential for increased erosion in these disturbed areas. Other reasons include, NSP will not allow a retaining wall over 4 ft on their easement and that any variation of a wall 4ft or under will not change the over all slope of the hill. My recommendation for erosion control of this hillside is to first remove as many surface rocks as possible and fill any existing erosion areas, making the surface as smooth as possible. We will then hydro-seed using MNDOT seed mix 5-B (as recommended by Mary Alice with Anoka county soil and water) mixed with a bonding agent designed to adhere the seed to soil on embankments. Then we will cover the entire hillside with a turf reinforcement mat made by North American Green. This mat (SC250) is strong, long lasting, and will protect up to a 1:1 slope from high volumes of water flow. The mat will provide support on the hillside during and after the germination and routing process of the seed. Once developed the grass alone will provide enough support to prevent any erosion on this slope. As shown on the survey water flow should not be a concern for erosion on this hillside. As far as the flow at the bottom of the hill we will be able to channel the water around the house in a swale with a minimum grade of 1%. Sincerely, Jeff Hansen Manager Your Complete Outdoor Maintenance Contractor A LBERG -' INC.® 11770 JUSTEN CIRCLE · MAPLE GROVE, MINNESOTA 55369 PHONE: (763) 428-3550 · FAX: (763) 428-3419 EMAIL: info @ taiberg-lawn.com January 3rd 2002 PROPOSAL SUBMITTED TO: Mike Jones 11740 200th Ave NW Elk River, MN 55330 JOB LOCATION: Jones Residence 11740 200th Ave NW Elk River, MN We hereby submit specifications and proposals for: 2002 LANDSCAPE PROJECT~ 02-R101 Misc. Labor to Prep Hillside ................................................................................................. $500.00 Hydro Seed with mix 5-B and Bonding agent ................................................................... $1,800.00 Install Mat SC250 ............................................................................................................... $3,970.00 Total ................................................................................................................................... $6,270.00 Notes: A. Dirt in place by excavator unless otherwise specified. B. We reserve the right to establish cost adjustments on any revisions to this proposal as originally written. C. This proposal valid for thirty (30) days from date shown. Signed contracts received atter that date subject to review by contractor. D. Permits not included in this quote unless otherwise specified. E. All plant material warranted for one (1) year, one (1) time replacement. F. All sod watered and rolled at the time of installation. No additional watering or maintenance of sod is included unless otherwise stated. G. All private utilities located by others. Your Complete Outdoor Maintenance Contractor MATERIAL SPECIFICATION NOI~H AMERICAN GREEN* SC250 The composite turf reinforcement mat (C-TRM) shall be a machine produced mat of 70% straw/30% coconut fiber matrix incorporated into a permanent three-dimensional netting structure. The matrix shall be evenly distributed across the entire width of the matting and stitch bonded between UV stabilized top and bottom nets with 0.50 x 0.50 inch (1.27 x 1.27 cm) openings and a super heavy duty UV stabilized, dramatically cuspated (crimped) intermediate netting with 0.50 x 0.50 inch (1.27 x 1.27 cm) openings. The middle cuspated netting shall form prominent closely spaced ridges across the entire width of the mat. The three nettings shall be stitched together on 1.50 inch (3.81 cra) centers with UV stabilized polypropylene thread to form a permanent three-dimensional structure. All mats shall be manufactured with a colored thread stitched along both outer edges (approximately 2-5 inches [5-12.5 cm] from the edge) as an overlap guide for adjacent mats. The composite turf reinforcement mat shall be the North American Green SC250, or equivalent. The SC250 permanent composite turf reinforcement mat shall have the following physical properties: Material Content Matrix 70% Straw Fiber (0.35 lb/yd2) (0.19 kg/m2) 30% Coconut Fiber (0.15 lb/yd~) (0.08 kg/ms) Netting Top and Bottom UV Stabilized Polypropylene (5.0 lbs/I,000 fl~ [2.44 kg/100 m2] approximate weight) Mid - Super Heavy UV Stabilized Polypropylene (24 lb/l,000 ft: [11.7 kg/100 m2] approximate weight) Thread Black UV Stabilized Polypropylene Physical Specifications (per roll) English Metric Width 6.50 ft 2.00 m Length 55.50 ft 16.90 m Weight 34.00 lbs + 10% 15.42 kg Area 40.00 yd2 33.40 m2 Stitch Spacing 1.50 in 3.81 cm A Revolutionary New Way To Control Erosion Compom[e Reinforcement Ser,es Take North American Green is proud to introduce the Vmax3 Composite Reinforcement Series. This exciting new family of turf reinforcement mattings offers shear stress protection up to TEN POUNDS PER SQUARE FOOT! Vegetation To Its Maximum Power/ · Vmax3 mattings empower vegetation to replace rock and concrete in high-flow applications once considered too severe for "green" linings! But that's just the beginning. Important advantages of this bold, new category include these features: Our Vmax3 mattings combine a permanent three-dimensional netting structure with a fiber matrix material. The netting anchors and reinforces the root and stem systems of vegetation, while the matrix material provides effective erosion control. This patented composite construction maximizes erosion protection and structural reinforcement through all three phases of vegetation development: (1) pre-germination (2) establishment (3) maturity · Vmax3 mattings require no costly soil in-filling. You simply grade, seed and fertilize prior to installation. · All Vmax3 mattings meet or exceed Federal Highway Administration standards for tud reinforcement mattings. · Vegetated channels and shorelines add a natural beauty that concrete and riprap just can't match. · Unlike concrete or riprap, vegetated roadside channels provide a safer environment for motorists and act as a natural filter for stormwater runoff. · Vmax3 mattings offer substantial cost savings compared with traditional concrete and riprap! With the Vmax3 Composite Reinforcement Series, we're taking your next project to the third power: maximum erosion protection, maximum turf reinforcement, with the natural benefits only vegetation can provide! SC250 Bare Soil Unvegetated C350 P550 24" Tall Dens, Unvegetated Unvegetated Unreinforced V~ ~ o . / / Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1993 Telephone (612) 330-5500 June 19, 2000 Mike Jones 11948 Nevada Avenue N. Champlin, Mn 55316 E,4CRO,-,L,i-~M,_.N, - Septic Sysiem a,M Retaining Wail Line 984 Section 22, Township 33, Range 26 Dear Mr. Jones: Our Transmission Engineers have reviewed the septic system and retaining wall encroachment. The proposed retaining wall cannot exceed 4 feet in height and must not be greater than 5 feet into the easement. The encroachment for the septic system is acceptable to NSP under the following conditions: (1) Excavation close to structure location. A minimum distance of 20 feet of suppoded earth must be maintained from any part of the line structure. Support of the ground beyond the 20 feet may be provided by a Slope no greater than three feet horizontal to one foot vertical. Support may also be provided by the use of cribbing, sheet piling, retaining wall or tunneling. The specific plan for providing the required support and the excavation plan for the proposed project must be submitted to NSP for review and approval. (2) Grade change within easement. The ground elevation within the easement shall not be increased above the existing grade. Stockpiling of soil and/or material within the easement will not be permitted. (3)-. ClearanCes .to equipment. A.working clearance of 25 feet between the electrical and any cranes or digging equipment used in or near the easement, must be maintained at all times. If this clearance cannot be maintained, the contractor' or developer must arrange for a line outage by calling NSP's System Co;~trol depar[ment (Carol Andrews 612/330-6'135). At least two weeks 8dvar~ced notic6 must be provided in order to schedule a line outage. There is a fee of Page 2 6/19/2000 (4) approximately $350.00 per day, per outage, for this service. This fee must be paid prior to outage. Landscaping within the easement. Detailed plans for landscaping (including light standards) must be submitted to NSP for review and approval. Generally shorter varieties of trees and shrubs may be considered. If planting is permitted, the line's voltage and the tree's mature height and the distance from the line must be considered. For maintenance purposes there shall be no planting with 15 feet of structure sites. (5) Building on easements. There shall be no permanent or temporary building allowed on the easement. It is the express condition of this consent that all other terms and conditions of that certain easement granted by Oscar Jones by Final Decree and recorded as Document No. 154099 shall remain in full force and effect. To acknowledge receipt of and agreement with the terms of this consent, please sign this letter and return to my attention. Thank you for your courtesy and cooperation. Sincerely, Real Estate Assistant 612/330-6956 ACCEPTE .D,: By: Its C,: Roger Johnson Steve LaCasse NH:33592-20 Str: 88 CITY OF ELK RIVER P.O. Box 490 · Elk River, MN 55330 · (612) 441-4900 L~cationofjob // 7~-/O c77'O~-7~/~1 /'//]P/~ A.,} Signature ~,~ ~ ' d Date ~ ' / 7 ~' ~ o ~ (Show location of house, t~k, drainfield, prope~y line and well) NOTE: On ALL replacements and additions, tanks must be exposed for baffle inspection: COMMENTS: New Work t~l Outside Lift Replacement O Ejector Addition [21 Gravity Mound System Tank Size /,5' o o'c,~~ "."~' m t~,a Tank Size / ]q4- It. o O Square Footage of Drainfield Area _~epth of Rock Under Pipe ! pth of Rock Over Pipe Graveless Depth of Dirt Cover t [ ~ Number of Bedrooms L[ DATE INSPECTOR COMMENTS THIS FORM MUST BE FILLED OUT BY A LICENSED INSTALLER (ASBUILT) (1) CITY COPY, (2) OWNER COPY, (3) LICENSED INSTALLER COPY Howard R, Green Gompany MEMORANDUM To~ From: Subject: File: Date: Michele McPherson, Director of Planning Frank Kriz, R.L.S. Mr. Mike Jones Property / Final Grading 230273M-0325 January 17, 2002 We have reviewed the informational package from Mr. Jeff Hanson of Talberg Lawn and Landscaping, Inc., regarding the final grading and restoration of the Mike Jones property located at 11740 200th Avenue NW. As shown on the as-built drawing in this package, the house that was built on this lot caused an existing 3:1 slope at the rear of the lot to be cut back to a 2:1 slope. It has been the City policy that 2:1 slopes are not acceptable and the solution is to build retaining walls which would allow the slope to be restored to a 3:1. Mr. Hanson's solution of stabilizing the 2:1 slope is not the issue. The issue is that 2:1 slopes have not been permitted. In the package is a letter from NSP which states that only one 4-foot high retaining wall is permitted on their easement. As shown on the as-built drawing, only one-half of this 2:1 slope is in the NSP easement, which means one-half of this 2:1 sloPe has no retaining wall restrictions. As per the area in the NSP easement, it may be possible to have a tiered 8-foot high retaining wall built with the lower 4-foot wall outside of the easement and the upper 4-foot wall being inside the easement. It is our recommendation that the rear slopes be restored to 3:1 using retaining walls, and that a detailed plan be prepared and approved prior to the work being done. FSK:tw Memo 1-1%02 McPhcrson[ 1 ] 1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1993 Telephone (612) 330-5500 June 19, 2000 Mike Jones 11948 Nevada Avenue N. Champlin, Mn 55316 ,_,,~,,_,,r:_~, ,"' ~,-'~ ^,"' p4';~ ~ F'~,,~'~',,,..,,_,,_,,,,,,, - Septic Sysiern ap.d Retaining Wail Line 984 Section 22, Township 33, Range 26 Dear Mr. Jones: Our Transmission Engineers have reviewed the septic system and retaining wall encroachment. The proposed retaining wall cannot exceed 4 feet in height and must not be greater than 5 feet into the easement. The encroachment for the septic system is acceptable to NSP under the following conditions: (1) Excavation close to structure location. A minimum distance of 20 feet of supported earth must be maintained from any part of the line structure. Support of the ground beyond the 20 feet may be provided by a slope no greater than three feet horizontal to one foot vertical. Support may also be provided, by the use of cribbing, sheet .piling, retaining wall or tunneling. The specific plan for providing ~he required support and the excavation plan for the Proposed projeot must be submitted to NSP for review and approval. (2) Grade change within easement. The ground elevation within the easement shall not be increased above the existing grade: Stockpiling of soil and/or material within the easement will not be permitted. (3) Clearances to equipment. A working clearance of 25 feet between the electrical and any cranes or digging equipment used in or near the easement, must be maintained at all times. If this clearance cannot be maintained, the contractor' or developer must arrange for a line outage by calling NSP's System Co~troi depa¢.rnent (Carol Andrews 612/330-6'135). At least t-wo weeks 8d-,iar~ced notice: must be provided in order to schedule a line outage. Them is a fee of Page 2 6/19/2000 approximately $350.00 per day, per outage, for this service. This fee must be paid prior to outage. (4) Landscaping within the easement. Detailed plans for landscaping (including light standards) must be submitted to NSP for review and approval. Generally shorter varieties of trees and shrubs may be considered. If planting is permitted, the line's voltage and the tree's mature height and the distance from the line must be considered. For maintenance purposes there shall be no planting with 15 feet of structure sites. (5) Building on easements. There Shall be no permanent or temporary building allowed on the easement. It is the express condition of this consent that all other terms and conditions of that certain easement granted by Oscar Jones by Final Decree and recorded as Document No. 154099 shall remain in full force and effect. To acknowledge receipt of and agreement with the terms of this consent, please sign this letter and return to my attention. Thank you for your courtesy and cooperation. Sincerely, Real Estate Assistant 612/330-6956 C: Roger Johnson Steve LaCasse ACCEPTED: By: Its NH:33592-20 Str: 88 Members Present: Members Absent: Staff Present: MEETING OF THE ELK RIYER BOARD OF ADJUSTMENTS HELD AT ELK RIVER CITY HALL TUESDAY, OCTOBER 23, 2001 Chair Pederson, Commissioners Baker, Franz and Ropp Commissioners Mesich and Schuster Michele McPherson, Director of Planning; Steve Rohlf, Building and Zoning Administrator; Scott Harlicker, Assistant Planner; Chris Leeseberg, Park Planner/Planner; Debbie Huebner, Recording Secretary o 4.1. Call Meeting To Order Pursuant to due call and notice thereof, the meeting of the Elk River Board of Adjustments was called to order at 6:30 p.m. by Chair Pederson. Consider Board of Adjustments Agenda COMMISSIONER FRANZ MOVED TO APPROVE THE OCTOBER 23, 2001, BOARD OF ADJUSTMENTS AGENDA. COMMISSIONER BAKER SECONDED THE MOTION. THE MOTION CARRIED 4-0. Consider 9/25/01 Board of Adjustments Minutes COMMISSIONER BAKER TO TABLE CONSIDERATION OF THE SEPTEMBER 25, 2001, BOARD OF ADJUSTMENTS MINUTES TO THE NOVEMBER 27, 2001 MEETING. COMMISSIONER FRANZ SECONDED THE MOTION. THE MOTION CARRIED 4-0. Request by Mike Jones for Variance to Requirement for Retaining Wall, Public Hearing - Case No. V 01-08 Staff report by Director of Planning Michele McPherson. Mike Jones, 11740 200th Avenue (Brentwood) requests a variance to allow a slope greater than 3 feet horizontal to 1 foot vertical (3:1) to exist without a retaining wall. Ms. McPherson reviewed the site conditions, noting that the property is encumbered by a large power line easement. The applicant received permission from NSP to locate the septic system on the property, as well as permission to locate a retaining wall 5 feet into the easement. Ms. McPherson reviewed staff's observations of the site and recent photographs of the area where the retaining wall is proposed to be located. She explained that the applicant's bank has escrowed money for the retaining wall, final grading and the driveway. Ms. McPherson reviewed the five conditions which must be met in order to grant a variance. Staff does not feel the request meets these conditions and recommends that the Board of Adjustments deny the request. Commissioner Franz asked if there were restrictions on the type of wall Mr. Jones could build. Ms. McPherson stated that there are several options for construction including treated timbers, interlocking blocks or a poured concrete wall. Chair Pederson opened the public hearing. Mike Jones, applicant, reviewed the letter he received from NSP. He stated that the City was given the letter and approved a building permit for the house. Mr. Jones explained that he currently does not have a water problem and he felt that a retaining wall would create one. He questioned why the City issued a building permit when they were aware of NSP's restrictions. Commissioner Baker asked Mr. Jones to explain where the retaining wall would go. Mr. Jones showed where the wall would be if it were placed 5 feet into the easement. Mr. Jones felt that he should not have been issued a building permit and he would have chosen a different lot if he would have known the retaining wall would be a problem. Commissioner Franz asked if Mr. Jones has approached NSP to ask if they would consider allowing the retaining wall further into the easement. Mr. Jones stated that he has not asked and he did not feel he should have to. City Engineer Terry Maurer explained how the retaining wall could be buik so that it would not create a water problem. Chair Pederson asked if the temporary Certificate of Occupancy (C.O.) stated that the retaining wall was required. Ms. McPherson stated that the retaining wall and final grade were listed on the temporary C.O. as conditions for the final C.O. Mr. Jones stated that he felt that nothing would stop water from coming over the retaining wall. He stated that the landscaping company he consulted does work for MN/DOT and they are confident the erosion control blanket and seeding will work to control erosion. There being no further public comment, Chair Pederson closed the public hearing. Commissioner Franz stated that he fek the ordinance was clear on this issue. He asked if the problem could have been foreseen. City Engineer Terry Maurer stated that it is not common to require installation of a retaining wall as a condition of the Certificate of Occupancy, which makes it clear this was an unusual circumstance. Commissioner Baker lek the request is not supported by Items 1 through 4 in the findings for granting a variance. He stated that the applicant was made aware that a retaining wall was required. He felt the issue was who is responsible for the dilemma in placement of the retaining wall. Chair Pederson asked Mr. Maurer to describe an erosion control blanket. Mr. Maurer stated that there are over 100 types of erosion control blankets and that they basically all let water run through them and seed to grow up through them. Mr. Maurer felt that the seed mix Mr. Jones was referring to is a "ditch mix" that MN/DOT uses. Chair Pederson fek that the letter from NSP and the bank escrow support the fact that Mr. Jones was aware that a retaining wall was required. He fek that the photographs show that erosion is already occurring. Chair Pederson agreed that the findings for granting a variance cannot be met and could not support approval of the variance. COMMISSIONER BAKER MOVED TO DENY THE REQUEST BY MIKE JONES TO ALLOW A SLOPE GREATER THAN 3:1 WITHOUT A RETAINING WALL, CASE NO. V 01-08, BASED ON THE FOLLOWING FINDINGS: THE SITE IS UNIQUE IN THE FACT THAT THE PROPERTY IS ENCUMBERED BY A LARGE UTILITY EASEMENT; HOWEVER, THERE ARE OTHER SITES IN THE AREA ENCUMBERED BY THE SAME UTILITY EASEMENT. THE APPLICANT COULD HAVE CHOSEN A DIFFERENT STYLE HOME TO PLACE ON THE LOT TO REDUCE THE IMPACT ON THE EXISTING SLOPE. LITERAL APPLICATION OF THE ORDINANCE PROVISIONS WOULD REQUIRE THE APPLICANT TO INSTALL THE RETAINING WALL AS REQUIRED. 3. THE SPECIAL CONDITIONS ARE A CONSEQUENCE OF THE APPLICANT'S SITE AND HOME STYLE SELECTION. o THE REQUEST WOULD NOT ADVERSELY IMPACT OTHER PROPERTIES IN THE VICINITY; HOWEVER, IT COULD ADVERSELY IMPACT THE PROPERTY ITSELF IF THE EROSION INCREASED. SEVERE EROSION WAS OBSERVED ON THE SITE DUE TO THE ROCKY AND GRAVEL-LADEN SOIL. THERE ARE A NUMBER OF LOTS REMAINING IN THE BRENTWOOD SUBDIVISION THAT ARE ENCUMBERED BY LARGE POWER LINE EASEMENTS. STAFF FEELS THAT DUE TO THE SOIL TYPES, A RETAINING WALL IS APPROPRIATE AND THAT A VARIANCE SHOULD NOT BE GRANTED TO ALLOW A SLOPE GREATER THAN 3:1 TO BE MAINTAINED WITH AN EROSION CONTROL BLANKET. COMMISSIONER FRANZ SECONDED THE MOTION. THE MOTION CARRIED 5-0. 5. Other Business No other business. 6. Adjournment There being no further business, COMMISSIONER FRANZ MOVED TO ADJOURN THE MEETING. COMMISSIONER BAKER SECONDED THE MOTION. THE MOTION CARRIED 5-0. The meeting of the Elk River Board of Adjustments adjourned at 7:08 p.m. Respectfully submitted, Debbie Huebner Recording Secretary