4.4. SR 01-28-2002 Howard R. Green Oompany Item 4.4. January 23, 2002 File: 815640J-0030 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: ZANE STREET IMPROVEMENT PROJECT FEASIBILITY STUDY Dear Council Members: Attached is a copy of the Zane Street Feasibility Study ordered by the City Council in December 2001. This feasibility study looks at the extension from Mississippi Ridge development to the Zane Street cul-de-sac and the elimination of the existing TH 10 access at Zane Street near the Americlnn. In addition, the feasibility study looks at the realignment of Zane Street between Saxon Motors and NAPA Auto Parts in an effort to get all of the Saxon Motors property on one side of Zane Street. Also, the feasibility study discusses the potential extension of lateral sanitary sewer and trunk watermain to serve the businesses and vacant properties in the area. Attached is a resolution for the City Council's consideration that accepts the feasibility study and orders the public headng to be held on February 25, 2002. We would recommend adoption of the resolution by the City Council. If you have any questions regarding the feasibility study or this project in general, I will be in attendance at your January 28, 2002, City Council meeting. Sincerely, Howard R. Green Company Terry J. Maurer, P.E. TJM:tw Attchs. Ltr 1-23-02 Council 1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 RESOLUTION 02 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND ORDERING A PUBLIC HEARING ON THE IMPROVEMENT IN THE MATTER OF THE ZANE STREET IMPROVEMENT OF 2002 WHEREAS WHEREAS the Feasibility Report ordered by the Council in Resolution 01-79 has been prepared with reference to the Zane Street improvement and was received by the City on January 28, 2002; and the Feasibility Report recommends that the proposed improvement is feasible; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: The City Council will consider the Zane Street improvement as described in the Feasibility Report and the assessment of the property abutting this proposed improvement for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Section 429 at an estimated total cost for the improvement of $434,300. A public headng shall be held before the City Council on the proposed improvement on the 25th day of February, 2002, at 6:00 o'clock p.m. at the Elk River City Hall Council Chambers. The City Administrator shall provide two published notices (one week apart) in the official newspaper with at least three days between the last publication date and the heating, and mailed notice ten days prior to the hearing as required by law.. Passed and adopted this 28th day of January, 2002. ATTEST: Stephanie A. Klinzing, Mayor Sandra A. Peine, City Clerk O:~PROJ~815640J~0030~Resolution 1-23-02.doc Proj. No. 815640j FEASIBILITY STUDY FOR ZANE STREET NW IMPROVEMENTS ELK RIVER, MINNESOTA Janua~ 2002 FEASIBILITY STUDY FOR ZANE STREET NW IMPROVEMENTS ELK RIVER, MINNESOTA Januaw 2002 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Minnesota. Terry J. Maurer, P.E.' Lic. No. 15316 Date Prepared by: .,,¢~¢67"~-~~ Kristie Thompson Date Howard R. Green, Consulting Engineers 1326 Energy Park Drive St. Paul, MN 55108 Phone: (651) 644-4389 Fax: (651) 644-9446 INDEX II. III. IV. V. VI. VII. VIII. IX. X. Page INTRODUCTION ............................................................................................... 1 PROJECT SCOPE ............................................................................................. 2 NECESSITY AND COST-EFFECTIVENESS ..................................................... 2 EXISTING CONDITIONS ................................................................................... 3 PROPOSED IMPROVEMENTS ......................................................................... 4 RIGHT-OF-WAY, EASEMENTS AND PERMITS ............................................... 6 ESTIMATED PROJECT COSTS ........................................................................ 7 FINANCING AND ASSESSMENTS ................................................................... 8 PROJECT SCHEDULE .................................................................................... 10 CONCLUSION ................................................................................................. 10 EXHIBITS Exhibit 1 - Study Area Map Exhibit 2 - Trunk Highway 10 Improvements Exhibit 3 - Zoning Map Exhibit 4 - Proposed Street Improvements and Typical Section Exhibit 5 - Proposed Sanitary Sewer Improvements Exhibit 6 - Proposed Watermain Improvements Exhibit 7 - Proposed Storm Sewer Improvements Exhibit 8 - Saxon Motors Right-of-Way Exhibit 9 - Napa Auto Parts Right-of-Way APPENDIX Detailed Estimated Construction Cost I. INTRODUCTION On December 10, 2001, the Elk River City Council adopted Resolution 01-79 authorizing Howard R. Green Company to prepare a Feasibility Study for the Zane Street NW Project in the City of Elk River. The study was initiated by the City Council due to concerns regarding the safety at the intersection of Zane Street NW and Trunk Highway 10. The proposed project is through the existing "The Crossroads" plat. A map of the project area is provided as Exhibit 1. The proposed Zane Avenue Project includes the realignment of Zane Avenue and construction of sanitary sewer, watermain, and storm drainage improvements. The major components of the proposed project are as follows: · Realignment of Zane Street NW to connect to Yale Street NW in the newly constructed Mississippi Ridge Addition. · Closing of the access to TH 10 at the existing intersection with Zane Street. · Extension of sanitary sewer and watermain from the north property line of Mississippi Ridge Addition to the north project limits. · Construction of storm sewer to service the new street location. Zane Street is an existing cul-de-sac road off of Trunk Highway 10. The road serves three existing businesses: Americlnn, Napa Auto Parts, and Saxon Motors. In order to improve the safety and traffic service on Trunk Highway 10, the City of Elk River has been working with MnDOT to reduce the number of access points onto the Trunk Highway. The recent construction of the Mississippi Ridge Development to the south of Zane Street was designed using this concept. The project eliminated four driveway access points to Trunk Highway 10, reconfigured one driveway access into a city street that aligns with 173rd Avenue, and created the fourth leg of the signalized intersection at 171st Avenue and Trunk Highway 10. Through direction from City Staff the Mississippi Ridge Development included a public right-of-way for the future extension of the Zane 'Street cul-de-sac. Due to safety concerns at the intersection of Zane Street and Trunk Highway 10, City Council determined' that a project should be initiated that would study the feasibility of FEAS-STUDY 1 extending the cul-de-sac and removing the existing access with TH 10, promoting the use of the signalized intersection at 171st Avenue for vehicle traffic. Due to the closure of the Zane Street/Trunk Highway 10 intersection, the City was able to enter into a cooperative agreement with MnDOT for the proposed project. MnDOT has committed funds toward the project due to the benefits to the Trunk Highway. Exhibit 2 shows the access management goals of the Mississippi Ridge and proposed Zane Street NW Project. In addition, the option of realigning Zane Street was also examined. Saxon Motors currently has property on either side of Zane Street. Potential customers must cross the road to reach the second half of the car lot. The owner of Saxon Motors, Ted Saxon, requested that the City examine the option of realigning the road so that the property owned by Saxon Motors could all be on the west side of the road. II. PROJECT SCOPE The purpose of this study is to analyze the realignment of the existing road, together with the extension of lateral sanitary sewer and trunk watermain and determine the feasibility of the proposed project. This study will discuss the existing conditions, proposed improvements, estimated construction costs, and overhead costs which include city administration, engineering, fiscal, and legal expenses. The City's Assessment Manual and past practices will be used as guidelines to discuss financing methods for the proposed improvements. III. NECESSITY AND COST-EFFECTIVENESS The improvements proposed in this study are necessary for a number of reasons. The Mississippi Ridge Addition eliminated four access points along Trunk Highway 10. The Zane Street NW Project would eliminate another full access point. In conjunction with the street improvements, lateral sanitary sewer and watermain would be constructed. The proposed watermain improvements will connect to the City's existing system at multiple locations providing an added benefit of a looped system. FEAS-STUDY 2 The proposed improvements will be developed into a project large enough to ensure a competitive bidding process. Therefore, the proposed improvements will be cost- effective. Based on the information contained within this report, the proposed improvements are necessary, cost-effective, and feasible from an engineering standpoint. The project is necessary in order to provide the properties in The Crossroads area with safe and adequate public transportation facilities, watermain, sanitary sewer, and storm sewer systems. IV. EXISTING CONDITIONS Street Zane Street starts at the intersection with Trunk Highway 10 and terminates 500 feet to the south in a cul-de-sac. The intersection is controlled by a stop sign on Zane Street, with an open median on Highway 10 to allow for left turning movements. It should be noted that the on-ramp from Trunk Highway 101 merges onto Trunk Highway 10 east less than 100 feet from the intersection of Zane Street. The area adjacent to Zane Street is zoned as Highway Commercial (C3). The cul-de- sac serves three businesses - Americlnn, Napa Auto Parts, and Saxon Motor. There are two lots that are undeveloped located between the Americlnn and Saxon Motors. A zoning map of the study area is provided as Exhibit $. Sanitary Sewer There is no city sanitary sewer within The Crossroads plat. The three existing businesses are served from on-site sewer systems. The on-site systems for both the Americlnn and Saxon Motors have recently been determined to have failed. Both of these businesses are currently using their septic tanks as holding tanks and are having them pumped weekly as an interim measure until city sanitary sewer is available. Both drain fields have been abandoned and are no longer in use. Watermain There is no city watermain within The Crossroads plat. Watermain was brought under Trunk Highway 10 as part of the Eastern Area Phase 1 project. A 16-inch watermain was stubbed to the north of the intersection and a hydrant was installed. FEAS-STUDY 3 Storm Sewer There is a small existing storm sewer collection system on Zane Street. The 18-inch concrete storm sewer discharges to a ditch, which enters a pond below the Mississippi River bank to the west. The storm water ultimately reaches the Mississippi River. Existinq Private Utilities Private utilities which have facilities in or near the project area will be notified of the project and requested to incorporate repairs and replacements with the project as needed at their cost. Private utilities include Qwest Communications, Elk River Municipal Electric, Connexus, North Star Access, Sherburne Telesystems, and Minnegasco. V. PROPOSED IMPROVEMENTS The proposed improvements for the Zane Street NW project include sanitary sewer, watermain, storm sewer, and street construction. A detailed description of each proposed improvement is provided below. Street Proposed street improvements include the realignment of Zane Street, extension of the cul-de-sac southerly, removal of existing turn lanes along TH 10 at the intersection with Zane Street, and closure of the Zane Street access to TH 10. The proposed street improvements are shown on Exhibit 4. The proposed realignment of Zane Street allows Saxon Motors to have all of their property to the west of the new road. The reconfiguration of the property will necessitate the exchange of right-of-way between Saxon Motors, Napa Auto Parts, and the City of Elk River. This is discussed further in the Right of Way and Easements section of this study. The existing intersection of TH 10 and Zane Street will be closed to promote access management along the Trunk Highway. Access to the businesses along Zane Street would be from 171st Avenue or 173rd Avenue. The proposed street section for Zane Street, shown on Exhibit 4, consists of a 32-foot wide street section with barrier concrete curb and gutter. This section will provide two FEAS-STUDY 4 12-foot wide lanes and a 4-foot wide reaction area next to the curb and gutter. The proposed street section for this road is in accordance with City and MnDOT requirements. Based on typical soils in Elk River, the proposed pavement section consists of 8 inches of Class 5 aggregate base, 2 inches of bituminous base course, and 2 inches of bituminous wear course. The proposed street section will be verified by a geotechnical investigation. Proposed improvements also include a 6-foot wide sidewalk located on the west side of Zane Street. Estimated costs for sidewalk have been included in the street construction cost. Sanitary Sewer The proposed sanitary sewer improvements, as shown on Exhibit 5, consist of extending an 8-inch lateral sanitary sewer from the current termination point at the north end of the Mississippi Ridge Addition. The proposed sanitary sewer alignment along Zane Street would provide service to the adjacent properties, allowing for the discontinued use of the on-site sewer systems currently being used by the businesses. Stubs would be provided to the two undeveloped properties. Watermain The proposed watermain improvements, as shown as Exhibit 6, consist of extending a 10-inch trunk watermain from the current termination point at the north end of the Mississippi Ridge Addition. The watermain would be connected to the 16-inch stub under Trunk Highway 10 near the Americlnn, creating a looped system. Storm Sewer The proposed typical section for Zane Street includes barrier curb. The existing storm sewer system is adequate to handle the drainage from the new road but will need to be modified slightly to collect the runoff. The proposed storm drainage improvements are shown as Exhibit 7. Pipe material will be reinforced concrete. Inlets will be standard catch basins built into the proposed concrete curbing. FEAS-STUDY 5 VI. RIGHT-OF-WAY, EASEMENTS AND PERMITS Ri.qht-of-Wa¥ and Easements As previously noted, the read will be realigned so that the Saxon Motors property will all lie on the west side of the road. The construction of the realigned Zane Street will require the donation of right-of-way from properties adjacent to the proposed alignment. The proposed street right-of-way to be acquired is 55 to 60 feet in width. In exchange for the donated right-of-way, the City will vacate the unneeded right-of-way. Exhibits 8 and 9 outline the right-of-way that will be acquired and vacated for the Saxon Motors and Napa Auto Parts properties. An easement will also be required across part of Saxon Motors lot for storm sewer. Due to the realignment of Zane Street a small piece of right-of-way will need to be acquired from Kirkeide. The following table summarizes the information provided on the exhibits. Table 1 Right-of-way Right-of-way to be Right-of-waY to be Property acquired (acres) vacated (acres) Saxon Motor 0.75 0.84 Napa Auto Parts 0.12 0.29 Kirkeide 0.01 N/A Temporary construction easements may be required throughout the project area to accommodate accesses into adjacent businesses. Verbal permission will be secured from private property owners during the construction process should work need to be completed on private property, outside of obtained rights-of-way. Permits Several permits will be required prior to construction of the proposed improvements. Required permits include, but are not limited to, the following: FEAS-STUDY 6 · Minnesota Pollution Control Agency · Minnesota Department of Transportation · Minnesota Department of Health · Minnesota Pollution ControlAgency Sanitary Sewer Street/Storm Sewer Watermain Grading VII. ESTIMATED PROJECT COST The estimated construction costs and associated overhead costs for the proposed improvements are summarized in Table Two. A detailed preliminary construction cost estimate is provided in the Appendix. In accordance with the City's Assessment Manual, the overhead costs have been estimated as 28% of the total construction cost. The overhead cost includes City administration, engineering design, construction staking and inspection, and fiscal and legal costs. No costs have been included for the acquisition of utility easements and rights-of-way since it is assumed they will be dedicated. Although no acquisition costs have been included, the overhead costs were increased by $10,000.00 due to administration costs incurred to acquire them. Table 2 Project Cost Estimate Street Improvements Sanitary Sewer Improvements Watermain Improvements Storm Sewer improvements Trunk Highway 10 - Crossing Closures Construction Cost Contingency (5%) Total Construction Cost Administration, Engineering, Fiscal & Legal Total Project Cost $206,000 48,000 43,200 8,100 10,000 $315,300 16,000 $331,300 103,000 $434,300 FEAS-STUDY 7 VIII. FINANCING AND ASSESSMENTS The improvements discussed in this report are proposed to be financed through a number of different methods. These include cooperative agreement financing provided by MnDOT, trunk watermain funds, and lateral assessments for sanitary sewer and watermain improvements to Saxon Motors, Napa Auto Parts, Americlnn, and the two undeveloped properties adjacent to Zane Street. The following paragraphs discuss each of these financing methods in greater detail. MnDOT has notified the City that funds have been encumbered for this project in the 2002 fiscal year. A detailed cost estimate for the proposed improvements has been prepared and is included in the Appendix. This cost estimate puts the cost of the various improvements into the appropriate column for funding by MnDOT cooperative agreement dollars or City costs. According to the agreement with MnDOT, the state has agreed to pay for 60% of the street costs and 100% of the median closure. An analysis of the project costs indicates that the estimated construction cost financed by MnDOT is $120,000. Assuming MnDOT will pay 18% on top of this for overhead, the additional dollars would be $21,600, for a total of $141,600. Trunk watermain is being extended from the current termination point at the north property line of Mississippi Ridge to the 16-inch stub across TH 10 by the Americlnn. Trunk watermain charges were assessed to these properties in the Eastern Area project in 1998. It is proposed that trunk watermain funds in the amount of $15,000 be used. An analysis was performed to determine the lateral benefit to the properties adjacent to Zane Street NW. Currently, the City of Elk River's assessment policy is to assess $50.00 per linear foot of frontage for lateral sewer and water. The Americlnn is located on a private driveway to the north of Zane Street. Due to the location of the property, the front footage abutting the roadway is not representative of the size of the lot. In order for the assessment to be representative of the size of the property, it is proposed that for this project the assessments be based on acreage. In 1998, as part of the Eastern Area Project, these properties were assessed trunk watermain costs based on FEAS-STUDY 8 the size of the property. It is proposed that the same acreages used in determining the trunk costs be applied to lateral assessments. It is proposed that lateral sewer and water assessments be assessed in the amount of $23,300 per acre. The following table details the acreage and proposed assessment for each property. Table 3 Lateral Assessments PIN PrOperty Acreage Lateral AsseSSment OWner 75-003-4401 Americl n n 2.48 $57,750 75-521-0110 Undeveloped 1.11 $25,850 75-521-0120 Undeveloped 1.03 $24,000 75-521-0130 Saxon Motors 1.03 $24,000 75-521-0150 Saxon Motors 3.97 $92,500 75-521-0210 Saxon Motors 1.28 $29,850 75-521-0220 Napa Auto Parts 1.02 $23,750 Total 11.92 $277,700 A quick summary of total project costs versus available funds reveals the following' Total Project Cost Table 4 Project Financing $434,300 MnDOT Cooperative Funds Trunk Watermain Monies Lateral Sewer and Water Assessments Total Funds $141,600 $ 15,000 $277,7OO $434,300 FEAS-STUDY 9 As shown above, there are sufficient funds to complete the project based on the estimated project cost. IX. PROJECT SCHEDULE The schedule for the Zane Avenue Project, as provided in Table Four, is based upon guidelines established in Minnesota State Statues, Chapter 429, Local Improvements, Special Assessments. These dates will be revised as the project develops. Table 4 Project Schedule City Council receives Feasibility Study and orders Public Hearing Public Hearing, order preparation of plans and specifications Prepare plans and specifications and submit to MnDOT Cooperative Agreement preparation (MnDOT) Approval of plans/authorization to bid Open Bids Assessment Hearing/Public Hearing Award Contract Construction complete First payment due with real estate taxes January 28, 2002 February 2002 February 2002 4 - 6 weeks April 2002 May 2002 2002 Late May 2002 Spring 2003 May 2003 X. CONCLUSION The total estimated project cost, including overhead costs, is $434,300. The project is necessary and cost-effective. As previously stated, this cost will be financed through a combination of assessments to benefiting properties and MnDOT Cooperative Agreement funds, Trunk Watermain funds, and City funds. Based on the information gathered and the analysis presented, the proposed improvements discussed in this study are feasible from an engineering standpoint. The financial feasibility of the project will be determined by the City through discussions with the affected property owners. 815640J FEAS-STUDY 1 0 EXHIBITS \ I \ x, EXISTING ZANE STREET -" /-- - - ............. 'S~ .... DENOTES PROPOSED WATERMAIN STREET PROPOSED WATERMAIN iMPROVEMENTS cONSULTING ENG CiW~ ELk.~L~~ t<~ver ZANE II ' - ......................... ::l ., ............. ~ ' _ ..... DENOTES PROPOSED STORM SEWER ~,, ZANE STREET PROPOSED ~ STORM SEWER :~,.,:.,~:-': IMPROVEMENTS , ~ /----/ ~ GONSULTING ~NGINEERS iI iI . / iI iI January 23, 2002 12:31:38 p.m. /,( I I I il CN I ij II II II II II II II II II I 0 I r--. M/SS/SS/PPI RI VER 0 100 - STUDY AREA ZANE STREET IMPROVEMENTS STUDY AREA MAP CONSULTING ENGINEERS Ic~nuary 2~, 2002 12:51:38 p.m. 815640j~,FEASE%815640EX.DWG TRUNK HIGHWAY NO. 10 IMPROVEMENTS CONSULTING ENGINEERS BP C 3 -HIGHWAY COMMERCIAL AT - A.:.N^ TOUR // Jonuary 23, 2002 12:31:38 p.m. J815640)FEASE81560EX.DWG I I I - ' /_.1 ..:.! I i I ! Bp - BUSINESS PARK I1 - L,GHT - STUDY AREA ZANE STREET IMPROVEMENTS ZONING MAP City / Iii / / / o 60 ROW 55'-60' ZANE AVENUE PROPOSED STREET IMPROVEMENTS ~' ~ Elk~ r-~ VARIES CON ~ ~ 6 CURB & GU3qER · · 16' ~ Vt~RIES, I Il ~' ~E Mv5 WEARING COURSE MIXllJRE (MVWE35055B) TACK COAT 16' danuory 23, 2002 12:31:58 p.m. B,S~Oi\~SE\B15~,,OE×.~WO -- 2" TYPE MV3 NONWEARING COURSE MIXTURE (M~NW350.35B) -- 8" CLASS 5 AGGREGATE BASE -- APPROVED SUBGRAOE TYPICAL STREET SECTION ZANE AVENUE Jonuory 23, 2002 12:31:38 p.m. B 15640j~FEASE~B 15640EX.DWG F I \ x ""~ EXISTING ZANE STREET /--I --/ DENOTES PROPOSED SANITARY SEWER ZANE STREET PROPOSED SANtTARY SEWER IMPROVEMENTS ~,~ ~,c~. ~ca~, Ktver ,,,, / o 30 PROPOSED LAND TRANSFER RESIDENT ACQUIRED pROPERTY - 36,599 SQ. F'r. (0.84, ACRES) ZANE AVENUE IMPROVEMENTS SAXON CHEVROLET RIGHT OF WAY CiW~ CONSUL'TtNGENGINEERS January 24, 2002 7:28:09 o.m. 81564Oi~REMOVALS~81564.0TEX.DWG ~ PROPOSED LAND TRANSFER ZANE AVENUE IMPROVEMENTS NAPA AUTO PARTS RIGHT OF WAY CONSULTING ENGINEER Jonuary 24, 2002 7:28:09 (~.m. APPENDIX ENGINEERS ESTIMATE FOR: ZANE AVENUE IMPROVEMENTS (815640J) CITY OF ELK RIVER, MINNESOTA S~'HEDllLE 1.0 ZANE AVENUE 2021.501MOBILIZATION LS I 30,000.00 ff42 2101.501CLEARING ACRE 0.10 3,000.OO 0.06 2101 502CLEARINQ TREE 5 250.00 3 O0 2101.506GRUBBING ACRE 010 3,000.00 006 2101.507GRUBBING TREE 5 200.00 300 2104501 REMOVE SEWER P1PE (STORM) LF 23 5.00 13.80 2104501 REMOVE SEWER PIPE (SAN) LF 40 5.00 2104.501REMOVE CURB AND GUTTER LF 2,101 300 1,260.60 2 ~04.501 REMOVE FENCE LF 90 2 50 54.00 2104503 REMOVE BITUMINOUS PAVEMENT SY 7,792 400 4,675 20 2104.505REMOVE CONCRETE SLAB SF 189 450 113.40 2104 509 REMOVE CATCH BASIN EA I 150 OO 060 2104 523 SALVAGEMAIL BOX EA 1 5000 060 2104 523SALVAGE SIGN (COMMERCIAL) EA I 2,00000 0.60 2104 523 SALVAGE LIGHTING UNIT EA 16 200.00 9.60 2t05 501COMMON EXCAVATION (P) CY 2,950 500 1,770.00 2105 501COMMON EXCAVATION (SPECIAL) LS 1 10,000 OO 1.00 2105525 TOPSOIL BOP..ROW (P) CY 1,878 IO00 1,12680 2211 501AGGREGATE BASE CLASS 5 TON 1,500 1000 900.00 2232 501MILL BITI-,rMINOUS SURFACE (1 5") SY 24 500 14 40 2350501 TYPE MV 3 WEARING COURSE MIXTURE TON 370 35.00 22Z00 2350.502TYPE LV 3 NON WEARING COURSE MIXTURE TON 370 33.00 22200 2357502 B[TUIVl]NOUS MATERIAL FOR TACKCOAT GAL 129 2.00 77.40 2503541 15" RC PIPE CLASS V LF 32 2700 2503 54118" RC PIPE CLASS III LF 148 2900 2503.602CONNECT TO EXISTING MANHOLES (SAN) EA I 500.00 2503.6036" PVC PIPE SEWER LF 58 30.00 2503.6038" PVC PIPE SEWER LF 1,074 32.00 2504.602CONNECT TO EXISTING WATERMAIN EA I 500.00 2504.602INSTALL HYDRANT & VALVE EA 4 2,000.00 2504.6036" WATERMAIN-DUCT IRON LF 52 16.00 2504.603lO" WATERMAIN-DUCT IRON LF 1,158 24.00 2504.62 DUCTILE 1RON FITTINGS LB 3,008 200 2506.502CONSTRUCT DRAINAGE STRUCTURE 48-4020 EA 2 1,20000 2506 522ADJUST FRAME & RING CASTING EA I 150.00 0.60 2506602 CONNECT TO EXISTING DRAINAGE STRUCTURE EA I 500.00 2506.602CONSTRUCT SANITARY MANHOLES EA 7 1,500.00 12,600 O0 180.00 750.00 18000 600.00 6900 3,781.80 135.00 18,700.80 510.30 90.00 30.00 1,200,00 1,920.00 8,850 00 10,000.00 11,268.00 9,000.00 72.00 7,770.00 7,326.00 154.80 90 O0 0.58 $ 17,400.~O $ 30,000.0~ 0.04 $ 120.00 $ 300.00 2.00 $ 500.00 $ 1,250. OO 004 $ 120.00 $ 300.00 2.00 $ 400 O0 $ I,OO0.O0 9 20 $ 46.00 $ 115.OO 4000 $ 20~.00 $ 200.00 840.40 $ 2,521.20 $ 6,303.00 36.00 $ 90.00 $ 22500 3,116.80$ 12,467 20 $ 31,168.OO 7560 $ 340.20 $ 850.50 040 $ 60.00 $ 150.00 040 $ 20.00 $ 50 O0 0.40 $ 80000$ 2,000.00 6.40 $ 1,280.00 $ 3,200.00 1,180.00$ 5,900.00 $ 14,750.00 0.00 $ $ I 0,000.00 751.20 $ 7,512.00 $ 18,780.0~ 600.00 $ 6,000.00 $ 15,000.00 9.60 $ 48.00 $ 12000 148.00 $ 5,18000 $ 12,950.0<) 148.00 $ 4,884 O0 $ 12,210.00 51.60 $ 103.20 $ 25800 32.00 $ 864 OO $ 864.00 148.00 $ 4,29200 $ 4,292.00 1.00 $ 50000 $ 500.00 58.00 $ 1,740.00 $ 1,740.00 1,074.00$ 34,368.00 $ 34,368.00 1.00 $ 500.00 $ 500.00 400 $ 8,000.00 $ 8,000.00 52 O0 $ 832.00 $ 832.00 1,158.00$ 27,792 00 $ 27,79200 3,008.00$ 6,O16.00 $ 6,O16 OO 2.00 $ 2,400,00 $ 2,400.00 0.40 $ 60.00 $ 150.00 1.00 $ 500.0<) $ 500.00 7.00 S 10,50000 $ 10,500.00 38 2521.5014" CONCRETE WALK SF 4,190 2.00 $ 4,190.00 $ 8,380.00 $ 8,380.00 39 2531.501CONCRETE CURB & GUTTER DESIGN B618 LF 1,670 8.00 1,002.00 $ 8,016.00 668.00$ 5,344.00 $ 13,36000 40 2531602 PEDESTRIAN CURB RAMP EA 5 25000 300 $ 750.00 2.00 $ 500.00 $ 1,250.00 41 2540.602INSTALL MAIL BOX EA I 10000 060 $ 60.00 0.40 $ 4000 $ 100.00 42 2545.602INSTALL LIGHTING UNIT EA 16 800.00 9.60 $ 7,680.00 6 40 $ 5,120.00 $ t 2,800.00 43 2564602 INSTALL SIGN (COMMERCIAL) EA I 3,000 O0 0.60 $ 1,800.00 0.40 $ 1,200.00 $ 3,0~0.O0 44 2563601 TRAFFIC CONTROL LS I 4,000.00 0.42 $ 1,680.00 0.58 $ 2,320.00 $ 4,000.00 45 2564531 SIGN PANNELS TYPE C SF 20 4000 12.00 $ 48000 800 $ 320.00 $ 800.00 46 2564603 4" SOLID LINE WHITE-EPOXY LF 1,73t 100 1,03860 $ 1,03860 692.40$ 692.40 $ 1,731.OO 47 2564603 4" DOUBLE SOLID LINE YELLOW-EPOXY LF 866 200 519.60 $ 1,039 20 346.40$ 69280 $ 1,732.00 48 2575.201SEEDING ACRE 0.61 1,0OO OO 0.37 $ 366 O0 0.24 $ 24400 $ 61000 49 2575.502SEED MIXIURE 50 B LB 31 10.00 1860 $ 18600 12.40 $ 12400 $ 310.00 50 2575505 SODDING SY 432 2.00 259.20 $ 518.40 172.80$ 34560$ 864.00 51 2575511 MULCH MATERIAL TYPE I TON 1.22 200.00 0.73 $ 14640 049 $ 9760$ 244.00 52 2575519 DISK ANCHORING ACRE I 200.00 0.37 $ 7320 0.24 $ 48.80 $ 122.00 53 2575 532COMMERCIAL FERTILIZER ANALYSIS 22-5-10 LB 122 10 O0 7320 $ 73200 48 80 $ 488.00 $ 1,220.00 54 SPEC PROCTOR TEST EA 2 8500 1.20 $ 102 00 0 80 $ 6800$ 170 OO 55 SPEC DENSITY TEST, INPLACE EA 18 40.00 10.80 $ 43200 720 $ 288 O0 $ 72000 56 SPEC GRADATION TEST, CLASS 5 EA 2 100 00 1 20 $ 120 00 080 $ 8000$ 200.00 57 SPEC PROCTOR TEST, CLASS 5 EA 2 85.00 1.20 $ 102.00 0 80 $ 6800 $ 17000 58 SPEC DENSITY TEST, CLASS 5 EA 10 40 O0 600 $ 240.00 400 $ 160.00 $ 40000 59 SPEC DENSITY TEST, BITUMINOUS EA 18 125.OO 10 80 $ 1,350.00 7.20 $ 900.00 $ 2,250.00 SCHEDULEI.O-ZANE AVENUE-TOTAL $ 122,189.50 $ 191,877.00 $ 314,066.50 SUMMARY SCHEDULEI0-ZANE AVENUE--TOTAL $ 314,066.50 TOTAL- $ 314,066.50 o:1proi~809782JlO0601bid sch