Loading...
6.1. SR 02-19-2002City ~ Elkk. '- River TO: FROM: DATE: SUBJECT: Item# 6.1. MEMORANDUM Mayor and City Council Stephen Rohlf, Building and Zoning Administrator February 19, 2002 '~' Request to Construct Electrical Generation Facility at the Elk River Landfill bY Waste Management and the Elk River Municipal Utilities -Case # CU 02-01/P.H. Request Waste Management, the Elk River Municipal Utilities and Sherburne County are jointly working on a project to construct a facility at the Elk River Landfill to produce electricity from landfill gas. The project requires approval of a conditional use permit. Attachments A letter dated, December 31, 2001, from Bryan Adams, General Manager of the Elk River Municipal Utilities. Site plan, building layout and building elevation for the proposed structure. Review There is a generator currently at the landfill that is capable of producing 525KW. The proposal is to replace the existing generator with up to 4 new ones capable of producing an ultimate electrical capacity of 3200KW. This is enough electricity to serve more than 2,000 homes from a resource that would otherwise be wasted (landfill gas). The generators will be housed in ~'building that will also include offices and a meeting room. The meeting room will be used for educational purposes for energy and waste issues. This project will be an Energy City Demonstration. Staff did have the city's environmental consultant for the landfill review this request. His comments are reflected in the stipulations below. The Landfill's conditional use permit was recently reviewed and renewed. Staff is proposing that this issue be made an addendum to that exiting CUP. Staff also agrees with Bryan Adams' comment in his attached letter that drainage is not an issue with this request. Recommendation Staff fully supports this project and the Planning Commission recommends approval with the followin~ conditions: That a building permit is acquired and all appropriate building codes are met. That a ten stall paved parking lot is provided for the building that includes a minimum of one handicapped stall. That the area surrounding the building is landscaped in accordance with city requirements. That all truck traffic associated with this facility use the main southern access to the landfill for ingress and egress. That an "Air Emission Permit" for the generation is obtained from the Minnesota Pollution Control Agency (MPCA). That air emission testing, as required by MPCA's permit, is conducted; that the facility meet the air emission standards; and that test results are copied to the City of Elk River. That the stipulations of this approval are considered an addendum to the Landfill's existing CUP. Paver Case Number: Location Map CU 02-01 Ell< River Landfill N !i~C-Zl-Z001 04:0ZPM FROM-EI~MU ,,.lk R_ive r Mumdpal Utilities 322 King Avenue Elk River, MN 55530 ?Bi-441-B099 T-OBB P.OOl/OOl phone: 76:3.641.2020 F~ %5.441.8099 December 21, 2001 To' Michele McPherson Director of Plnnning From: .Bryan C. Adams General Manager Subject: Landfill Gas Electric Generation Project Elk River Municipal Utilities (ERMU), as an active participant in Energy City activkies, has been involved in utilizing Landfill Gas (LFG) to generate electricity at fl~e Elk River Landfill since 1998. In 1998, a 525 KW electric generator fueled by LFG, was brought on-line. Due to the mount of LFG now available, 'ERMU in parmership with Waste Management m~d Sherbume County, desire to expand the LFG electric generation project from the initial 525 KW capacity to ultimately 3200 KW. This is enough elecrr/cal energy to supply over 2100 homes with their electrical needs. This project entails removing the existing 525 KW engine / generator housed in an all- weather metal enclosure m~d constructing approximatety a 5800 square foot masonry building. This new building will house 3 - 800 KW engine / generator milts initially and will be expandable to 4 - 800 KW units. This facility also contains a compressor room, elecu-ical room for equipment, along with a bathroom, office, storage and an education ceDter. No grading plan or drainage calculations are included. Due to the flat sire, no grading is' requkred. Due to the small footprint of this building, drainage is not an issue either. cc: Deb Delm NOTE, DECEMBER I~98, ~ECEMBER [999 AND JANUARY 3000 BY MEYER, ~GHLiN INC. VERTICAL DATUM = NGVD 19~9 MONITORING WELL AND GAS ~ROSE LOCATIONS PROVIDED BY WASTE MANAGEMENT. , ~ /,,, R ? FO& CU~' MOl T ~: F , I FLOOR EAST ELEVATION SOUTH ELEVATION NORTH ELEVA~ON ~ST ELEVATION ,/m