I. Case No. Zc02-0 I
Request by STC, Inc. for a Rezoning from Rid, Single Family
Residential to R3 Townhouse District
2. Case No. P 02-01
Request by STC, Inc. for Preliminary Plat Approval - Trott
Brook Crossing Addition
Request
Consider a request by STC, Inc. for a rezoning from Rld (Single Family Residential) to R3
(Townhome District) and a preliminary plat. The preliminary plat includes 21 single family
lots and 82 townhouse lots (103 total lots) on 32 acres.
Location
The property is located on the east side of Twin Lakes Road at the intersection with
Industrial Circle.
Zoning/Land Use
Rld (Single Family Residential) / MR (Medium Density Residential)
Attachments
Location map
Memo from the City Engineer
Preliminary Plat
Preliminary development plans
Building elevations and floor plans
Parking plan
Open space calculations
Letter from Bob Van Den Berg
Phone: 763.441.7420
Fax: 763.441.7425
www. ci.elk-river, mn.us
Existing Conditions
The 32 acre parcel is located on the east side of Twin Lakes Road at the intersection with
Industrial Circle. The property is mostly wooded and hilly. The northwest corner of the
parcel was mined to provide fill for the HomeDepot?Walmart development. There is a gas
line easement along the west property line and two power line easements, one on the north
property line and one along the south property line.
Adjacent land uses include a single family residence and Hillside Park to the east, Trott
Brook Farms South development to the north, undeveloped single family residential
property to the south and the East Elk River Business Park and Twin Lakes Road to the
west.
Project Description
The proposed project is a mix of 82 townhouses and 21 single family residences on 32 acres.
The townhouses are a mix of 28 rambler style townhomes and 54 condominium units in
buildings with 6 or 8 units in each.
Four public streets are proposed. Street B will connect with Trott Brook Farms South and
intersect with Street C. It will provide access, via private streets, to some of the
condominium units. Street C will also connect with Trott Brook Farms South and extend
through the single family portion of the project to the southern boundary of the project. It
will extend into the property to the south when that property is developed. Street D is a cul
de sac servicing the 28 rambler style townhouses. Street E provides access into the project
from Twin Lakes Road. It will also provide access, via private streets, to some of the
condominium units. Individual driveways will service the rambler style units and private
drives will service the condominium units.
Analysis
Rezoning Request
The applicant is requesting a rezoning from Rld (Single Family Residential) to R3
(Townhome District) in order to allow this mixed residential project. The underlying land
use designation for this property is MR (Medium Density Residential), which would allow up
to 7.92 units per acre. The proposed project has a net density of about 3.86 units per acre,
which is consistent with the underlying land use designation of Medium Density Residential.
The Planning Commission, during previous discussions, has expressed some concern
regarding concentrating townhouse developments in a specific area. With the development
of Trott Brook Farms, Trott Brook Farms South and this development there will be 348
townhouse units located along a 2/3 of a mile section of Twin Lakes Road. The units in all
three developments will be the same design, (mix of back-to-back units and rambler units).
Preliminary Plat
The preliminary plat consists of 103 dwelling lots, 21 single family lots, 28 rambler style
townhomes and 54 condominiums. There are also 2 common lots. The single family lots are
located on the eastern side of the plat, adjacent to Hillside Park; the rambler style
townhomes are located in the southwest corner of the plat and the condominiums are
located in the northwest corner of the plat.
Dimensional Requirements
The single family lots comply with the dimensional requirements of the R3 zoning district.
They all exceed the 80 foot lot width requirement and the minimum lot size of 12,000 square
feet. The lots are designed so that future homes will be able to comply with the setback
requirements.
The lots in the townhouse portion of the project also comply with the dimensional
requirements of the R3 zoning district.
Grading, Drainage and Utilities
Grading, drainage and utility issues are addressed in the City engineer's memo.
Access
Street E will be the only direct access into the development from Twin Lakes Road. Streets
B and C will extend south from Trott Brook Farms South. Street B will intersect with Street
C in the middle of the development and Street C will continue through the project to the
south boundary of the plat. Staff is concerned about the proposed location where Street C
connects with the southern boundary of the plat and how it will be extended into the Brown
property. There is a large hill on the Brown property and it appears that the street will run
into the side of it. The location where Street C is to connect with the Brown property may
have to be adjusted.
Park and Recreation
The Park and Recreation Commission recommended cash to meet the park dedication
requirements. They also recommended that the developer provide a trial corridor along the
north boundary of the plat for a connection to Hillside Park. The corridor would be adjacent
to Outlot B, Trott Brook South and the developer would be responsible for constructing the
trail. Sidewalks will be required along at least one side of all public streets.
Historic Preservation
The Historic Preservation Commission reviewed the project and did not recommend any
action be taken.
Landscaping/Tree Preservation
A general landscaping plan has been provided. The Subdivision Regulations, Section 1008,
requires 2 trees per lot, one boulevard tree and one front yard tree. The proposed plat
consists of 103 lots; therefore, 206 trees are required. The landscape plan includes 154
street/yard trees. Detailed landscape plans for the area around the units will be required.
The site is wooded except for the area that was mined and the area included in the gas and
powerline easements. There is to be a small clump of trees to be preserved between the
powerline easment and a drainage pond in the northwest corner of the site and second
clump in the center of the project adjacent to a wetland. If the developer would like credit
for large trees saved on site, a detailed tree inventory needs to be completed prior to credit
being given.
Townhouse Development
The open space requirement for this project is 5% of the net buildable area ( 1.33 acres or
58,131 sf.). The open space calculations submitted by the applicant shows 102,400 sf or 2.35
acres of open space. This does not include the area within the gas line easement. The open
space areas range in size from 3,400 sf. to 28,700 sf. Most of the identified open space areas
are located within the front setback areas along the streets. The two largest areas (28,700 sf
and 22,800 sf.) are located between the gas line and Twin Lakes Road. The proposed open
space is fragmented, scattered and in the case of the two largest areas, is on a hill and
abutting a major arterial street. The proposed open space complies with the ordinance.
Parking
As proposed, each townhouse unit will be provided with 1 parking space per bedroom. Each
unit's garage and driveway can provide parking to meet the resident parking requirement.
Guest parking is required at ~ space per unit (56 spaces). There are 19 spaces provided in
separate parking areas near the condominium units. Additional guest parking is provided in
the driveways and along public streets. There is sufficient guest parking provided to meet the
requirements. Parking will not be allowed on the private drives serving the condominium
units.
Townhouse Design
Condominiums
The condominium units are the same style and material as those proposed for Trott Brook
Farms South. The developer will be providing a different mix of colors for these units. The
units meet the minimum width requirements of 24 and 28 feet. The end units are 37 feet
wide and inside units are 33 feet wide. The garages meet the minimum size requirements.
The developer is offering two options for the building elevations. The proposed elevation
presented to the Commission (option A) consists of a mix of brick, stucco and vinyl siding
on the front. The side elevation is vinyl lap siding on the lower portion and the area within
the peak is vinyl shingle style siding. In response to the Commission's comment that the side
elevation should consist of different materials, the developer included option B in which the
side elevations consist of two materials, brick and vinyl. Option B also included changes to
the front elevations making the lower portion entirely brick instead of a mix of brick and
stucco and changing the upper floor from stucco to vinyl. Staff feels that both options
comply with the ordinance but that option A is preferred.
Rambler Style
The rambler units are also the same style, material and color as those proposed for Trott
Brook Farms South. The units meet the minimum width requirements of 24 feet and 28 feet.
The units are 32 feet wide. The garages meet the minimum size requirements. The front
elevation consists of stucco and brick. The rear elevations are about 1/3 brick, 2/3 vinyl lap
siding with decks. The building elevations comply with the ordinance.
Planning Commission Meeting
At the Planning Commission meeting held on January 29th no one spoke at the public
hearing. The issue of private drives was discussed. Private drives are not clearly defined in
the ordinance. However, there are specific design criteria that private drives must meet, and
the drives shown on the plan meet those criteria. The Commission and staff feel that drives
servicing the back-to-back units are private drives and not shared driveways. The shared
access to the garages are shared driveways. A 30 foot setback from the curb is required for
private drives and the plan as proposed does not meet this requirement. The developer
argued that the entire drive from the public street to the garages is a shared driveway and not
subject to any setback requirement. The Commission talked about why the 30' setback was
included in the ordinance. Two reasons came up, to provide open space between buildings
and to provide room in the driveway for off street parking. The Commission included a
condition in their recommendation that all townhouses meet the 30 foot setback
requirement. In response to the Commission's comments, the developer is proposing a 25
foot setback which would be adequate space to park one car in the driveway. Included in the
packet is a diagram submitted by the developer showing how cars would fit in the driveway
at 22', 25' and 30' setbacks.
The Commission also discussed the rear building elevations of rambler townhouses. They
felt that the decks did not provide the required relief on the rear elevations. The developer
has revised the rear elevations to provide the needed relief.
The location where Street C meets the south boundary of the plat was discussed. The
Commission included a condition in their recommendation that the developer work with the
City Engineer on an appropriate location for Street C to exit the plat.
Recommendation
The Planning Commission recommended that the City Council approve the request for a
zone change from Rld (Single Family Residential) to R3 (Townhouse District) with the
following findings:
I. THE REQUEST IS CONSISTENT WITH THE LAND USE PLAN.
2. THE REQUEST WILL NOT ADVERSELY IMPACT ADJACENT
PROPERTY OWNERS OR LAND USES.
The Planning Commission recommended that the City Council approve the preliminary plat
with the following conditions:
I. ALL COMMENTS OF THE CITY ENGINEER SHALL BE
ADDRESSED.
e
THE DEVELOPER SHALL ENTER INTO A DEVELOPER'S
AGREEMENT OUTLINING THE TERMS AND CONDITIONS OF
THE DEVELOPMENT.
3. THAT THE MAILBOXES SHALL BE CLUSTERED.
4. A SEALCOAT FEE IN THE AMOUNT DETERMINED BY THE CITY
BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING.
AN ENGINEERING ESCROW IN THE AMOUNT DETERMINED BY
THE CITY BE PAID PRIOR TO RELEASING THE PLAT FOR
RECORDING.
PARK DEDICATION FEES IN THE AMOUNT DETERMINED BY
THE CITY BE PAID PRIOR TO RELEASING THE PLAT FOR
RECORDING.
5
STORM WATER MANAGEMENT FEES IN THE AMOUNT
DETERMINED BY THE CITY BE PAID PRIOR TO RELEASING THE
PLAT FOR RECORDING.
Be
WATER ACCESSIBILITY FEES IN THE AMOUNT DETERMINED BY
THE CITY BE PAID PRIOR TO RELEASING THE PLAT FOR
RECORDING.
9. THE DEVELOPER SHALL PROVIDE AT LETTER OF CREDIT FOR
100% OF THE COST OF THE IMPROVEMENTS.
I 0.A WARRANTY BOND SHALL BE PROVIDED AFTER THE
IMPROVEMENTS ARE ACCEPTED BY THE CITY AND SHALL BE
HELD FOR ONE YEAR.
I I.SlDEWALKS SHALL BE PROVIDED ON ONE SIDE OF STREETS B,
C, D AND E.
12. A TRAIL EASEMENT SHALL BE PROVIDED TO HILLSIDE CITY
PARK ALONG THE NORTH PROPERTY LINE FROM STREET C.
13.A DETAILED LANDSCAPE PLAN FOR THE CONDOMINIUM AND
TOWNHOME DWELLING UNITS SHALL BE PROVIDED.
14. A HOMEONWERS ASSOCIATION SHALL BE ESTABLISHED FOR
THE MAINTENANCE OF THE COMMON AREAS INCLUDING THE
EMERGENCY ACCESS TO TWIN LAKES ROAD. A COPY OF THE
DOCUMENTS AND BUDGET SHALL BE PROVIDED TO STAFF.
15.THE DEVELOPER SHALL CONSTRUCT THE TRAIL FROM STREET
C TO HILLSIDE PARK
16. THE DEVELOPER SHALL WORK WITH THE CITY ENGINEER ON THE APPROPRIATE LOCATION WHERE STREET C MEETS WITH
THE PROPERTY TO THE SOUTH (THE BROWN PROPERTY)
17. THE TOWNHOMES SHALL BE SETBACK A MINIMUM OF 30 FEET
FROM THE BACK OF THE CURBLINE OF ALL PRIVATE DRIVES.
18. THE LANDSCAPE PLAN WILL HAVE TO COMPLY WITH THE
LANDSCAPING REQUIRED IN SECTION 1008 OF THE ELK RIVER
CITY CODE. A DETAILED LANDSCAPE PLAN FOR AROUND THE
UNITS WILL BE REQUIRED.
19. ANY TREES OFF SITE OR ON SITE, NEAR THE LIMIT OF
GRADING THAT ARE TO BE PRESERVED, SHALL BE FENCED
WITH A SNOW FENCE AT THE DRIP LINE TO PREVENT
GRADING, COMPACTION, OR STORAGE OF EQUIPMENT,
DEBRIS OR MATERIALS. STAFF SHALL INSPECT FENCING PRIOR
TO GRADING COMMENCING.
20. THE COACH TOWNHOMES SHALL HAVE A 32" BREAK IN THE
REAR ELEVATION. THE DECK IS NOT CONSIDERED A BREAK IN
THE ELEVATION.
BoO2
175TH
Site
HILLSIDE
- CITY PARK
174TH
173RD
172ND
Case Number:
Location Map
Case P 02-01
N
oward
January 21, 2002
File: 816720J-0240
Green Company
Mr. Scott Hadicker
Senior Planner
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330-0490
RE:
TROTT BROOK CROSSING ADDITION
SITE PLAN REVIEW
Dear Mr. Harlicker:
As requested, we have reviewed the submittal package for Trott Brook Crossing Addition. The
submittal package was prepared by Westwood Professional Services and included a 7-page set
of plans. The plan set included existing conditions; preliminary plat; grading, drainage, and
erosion control plan; centerline profiles; preliminary utility plan; and preliminary landscape plan.
Also included in the submittal package were drainage calculations which encompass both Trott
Brook Farms South and Trott Brook Crossing. Based on our review, comments received at the
staff review meeting, and a meeting with the Developer and their engineer, we would offer the
following comments:
A. PRELIMINARY PLAT
The preliminary plat does not accurately reflect the previous taking from this property
for the Tyler Street right-of-way. This needs to be corrected.
The Developer indicated they were negotiating for the acquisition of Outlot A of Elk
River Business Park, which is on the east side of Tyler Street adjacent to their
property. The preliminary plat should reflect this parcel of land also if it is to be
attached to this plat.
B. SITE PLAN
The exception to this plat is owned by Mr. Bob Vandenberg. A ghost plat of how this
property could be subdivided in the future should be shown on the site plan.
Mr. Vandenberg's property currently has its access through Hillside Park northerly up
to CSAH 12. An attempt should be made to realign Mr. Vandenberg's ddveway to
meet the City street in Trott Brook Crossing and to vacate the driveway easement he
has through Hillside Park.
Unit 27 of the townhomes encroaches into the existing power line easement. There
is a note that indicates the Developer is negotiating to have the easement width
reduced. We believe that this is not likely to happen; therefore, the buildings should
be realigned to eliminate the encroachment.
Ltr 1-21-02 Harlicker. rev
1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 851/644-9446 toll free 888/368-4389
Mr. Scott Hadicker
January 21, 2002
Page Two
There is only one access from the proposed plat onto Tyler Street. That is at the
northern portion of the development. The access point lines up with the no,bern
access from Elk River Business Park. Left turn lanes for turning vehicles into Trott
Brook Crossing are established at this point.
The southerly access from Elk River Business Park also has left turn lanes
established for access into Trott Brook Crossing. However, the Developer has
indicated that the gas line easement and the elevation of Tyler Street make it
impossible to have a road connection at this point. Therefore, the Developer has
shown an emergency access from the cul-de-sac to Tyler Street. This must be
paved to a width of 10 feet so that it can act as a pedestrian trail. We will work with
the Developer's engineer to design an emergency access that is suitable for the
largest emergency vehicles that may need to use it. At a minimum, the width needed
for emergency vehicles is 20 feet.
The left turn lane on Tyler Street at this southerly access point will need to be
removed by this development.
The townhome ordinance requires a 30-foot setback from the curb line on private
ddves to the buildings. The 8-plexes at the northwest corner of this development do
not currently meet this setback. The building arrangements will need to be adjusted
to maintain a minimum of 30 feet from the curb line on the pdvate ddves to the
buildings.
GRADING, DRAINAGE, AND EROSION CONTROL PLAN
· Where Street C hits the south plat boundary as it would enter into the Brown property
further to the south, it appears to be at a poor Iocatiom From the little bit of
topography shown, it appears that the street location will fall on the side of a hill
located on the Brown property. Additional information needs to be provided to
definitively show that this street location will not cause development problems on the
Brown property. If it will cause development difficulty on the Brown property, the
location where Street C hits the south plat boundary needs to be modified.
· Additional storm sewer structures need to be placed in Street E to catch runoff from
the 8-plexes pdor to discharging into Street E. It appears the proposed storm sewer
route can be adjusted to hit Street E with appropriately placed catch basins.
· We question whether or not a permit from the gas company can be obtained for the
storm sewer line from Street D to Street E. The storm sewer line is shown on the
gas line easement boundary. Therefore, construction of this line would require
digging in the gas line easement parallel to the gas line.
· It appears that the ddveway for Unit 11 and for 8-plex building #2 are somewhat flat.
These two areas should be looked at and building elevations adjusted as
appropriate.
· There are a number of areas where cross-lot drainage will not follow the prescribed
drainage and utility easements. In these cases, additional drainage and utility
easements will need to be provided to accommodate these drainage patterns.
Ltr 1-21-02 Harlicker.rev
Howard R, Green Gompany
CONSULTING ENGINEERS
Mr. Scott Hadicker
January 21,2002
Page Three
· The emergency overflow and high water elevations need to be included on the plan
to vedfy the elevation of the buildings.
· At the southeast comer of the plat, there are two areas where storm sewer pipe
extends out into the rear lot areas to pick up Iow points. We question whether or not
these storm sewer extensions are necessary. Closer examination of the natural
topography in these areas should take place to verify whether or not storm sewer ,is
necessary to pick up these isolated drainage areas.
· There is grading shown on the exception to the plat all along the frontage of Street C.
Permission from the owner of the exception will be necessary before the grading
plan can be approved.
· A temporary cul-de-sac meeting the City dimensions will need to be constructed at
the south end of Street C. If the Developer is unable to get an easement from the
Brown property to construct a temporary cul-de-sac, one of the lots in this location
may become unbuildable to facilitate the cul-de-sac construction.
· When the grading plan is resubmitted with the above changes and/or corrections, it
should be submitted at a 50 scale.
PRELIMINARY UTILITY PLAN
· The dead-end watermain proposed in Street D and Street E needs to be looped
together to eliminate the dead-ends and to facilitate a higher fire flow in these areas.
Sanitary sewer and water services should be shown at the appropriate locations for
serving future lots to be developed in the exception. Also, an extension of the
mainline water and sewer, if appropriate, needs to be shown into the exception.
We are reviewing the ERMU's water model to determine an appropriate routing and
sizing for a trunk watermain through this development. We will provide this
information as soon as it is available. This development will be provided a trunk
credit for any trunk sized watermain required above 8-inch.
STORM DRAINAGE CALCULATIONS ·
A review of the storm drainage calculations submitted indicates that the calculations
are for Trott Brook Farms South and Trott Brook Crossing. When the two plats are
looked at for storm drainage purposes together, the drainage calculations are
acceptable. Essentially, the drainage calculations are requiring Trott Brook Crossing
to retain more of its drainage so that Trott Brook Farms South can discharge at a
slightly higher rate than proposed. At some point, the Developers of Trott Brook
Crossing will need to submit in wdting that they are agreeable to restricting the
discharge from their site to a lower level so that Trott Brook Farms South can
discharge at a higher rate.
Ltr 1-21-02 Harticker.rev
Howard R, Green Company
CONSULTING ENGINEERS
Mr. Scott Harlicker
January 21, 2002
Page Four
If you have any questions regarding these items, please call.
Sincerely,
Howard R. Green Company
Terry J. l~laurer, P.E.
TJM:tw
Ltr 1-21-02 Hadicker.rev
Howard R. Green Oompany
CONSULTING ENGINEERS
e2001 Westwood Professional Services. Inc.
1110
Westwood Professional Services, Inc.
7599 Anagram Drive
Eden Pr airie, MN 5534a
Phone: 952~337-5150 Fax: 952]937-5822
.%
1313'
:J
/ i
Rld
Undeveloped
128OE
Ii..",,:
O~n spa~e._.,x-,
i,.,,,,.,x,,, ~" '~ ........... ....
/
//
?/: L
128OE
Legend
Coil 48 Hours before digging:
GOPHER STATE ONE CALL
Twin City Area 651--454-0002
Mn. Toll Free 1-800-252-1166
Soil Types
MAP UNIT SOIL
NOT FOR CONSTRUCTION
S.T.C./
Fischer
0 100' 200' 300'
P-lO 20011101
r~ 12/21/01 s~ I o~ 7
Existing
Conditions Plan
e2001 Wes[wood Prolessionot Services. Inc.
Westwood Professional Services, Inc.
7599 Anagram DAve
Eden Prairie, MN S5344
Phone: 952J937-$150 Fax: 952J~37-5822
~O*J'TLoT~B
? \
Typical Single Family Lot:
NO
-- The lot dimensions and DreGs on this plan ore
approximate. Refer to the Final Plot and
supporting data for exact lot dimensions
o~eas.
- Easements other than t)~plcals are noted
the plan.
F 10' REAR UTIUTY EASEMENT (TYP.)
I i 5. o~--~ ~-- SlOE YARD ORAINAGE
I I I I UI~LIFY EASEMENT
5. Od I~_ 21 II LOT NUMBER
IL
I rO.O~ ~ DRAINAGE & UTIU~
I I I I I EASEMENT
~ tO.O'
~ S~REET
Shade Tree Construction
18530 UI~
Existing Legal:
Call 48 H~urs before digging:
GOPHER STATE ONE CALL
Twin City Area 651-454-0002
Mn. foil Free 1-800--252-1166
The Southeast Ouorter of the Northwest Ouorter of Section 2.
Township J2 North. Range 26 West. Sherburne Counly. Minnesota. except that
part thereof described as follows:
Commencing at the Northeast corner of said Southeast Ouqrter of the
Northwest Ouorter; thence on on assumed beqrlng of South t degree 17
minutes t3 seconds West, alonq the East line thereof, ~ distance of ~0.~4
feet lo the actual point Of begmning of the lo~d to be describe~' thence
N~th 88 degrees 42 mlnules 47 seconds West o distance of 272.86 feeC
thence Southwesterly o distance of 6Z79 feet alonq a nont~genUql curve
concave to the Northwest having o radius of ~0.00 feet. a central angle of
I~ degrees 46 minutes 12 sec~ds and the chord of said cur~ bears South
58 degrees t7 minutes 28 seconds WesC thence Southwesterly and Southerly
a distance of 406. I2 feet ai~g o reverse curve concave to the Southeast
hadn~ radius of ~70.00 feet. a central angle of 62 degrees 5~ minutes 21
set,ds and the chord of said curve bears South ~2 degrees 4~ minute~
sec~ds WesC thence South I degree 17 minutes I~ sec~ds West, tangent
lo said cur~. o d/stance of ~52.65 feet: thence Eouthed~ Southeasterly and
Easterly o distance of 269,78 feet along a tongenUal curve concave (o the
N~theost hodng q radius of 170.00 feet and o central angle of 90 degrees
55 minutes ~6 seconds; thence South 89 degrees ~8 minutes 2~ seconds
East. tangent to sold curve, o distance of ~IL57 feet; thence Easterly and
Southeasterly a distance of 69.74 feet along a tangent/o/ cur~ c~co~ ~o
the Southwest having o radius of I05.00 feet and o central on~le of 38
deqrees 03 minutes 15 seconds; thence North 38 degree~ 24 minutes 52
seconds EosL not tangent to said cur~. o distance of 21&84 feet; thence
South 89 de~ees ~8 minutes 2~ seconds East q distance of 49.54 feet
the East llne of sold Southeast Quarter of the Northwest ~orter; thence
N~th I degree 17 m/nu~es t~ seconds East. dong said East line. o distance
of 5~.02 feet ~o the point of beginning.
Development Data
Lot Areas (Single Family)
- Side Yard Setback (S/F) 5/I0 ft. (5 ft. garage s/de)
Vicinit7 Map
-.:',/ ....
$
NOT FOR CONSTRUCTION
S.T.C./
Fischer
100' 200' 300'
12/21/01 s~ee 2 or 7
Preliminary Plat
'1
Westwood Professional Services,
EMERGENCY ]ECC S
(PER CITY
PROPOSED TROTT BROOK FARMS 8OUTH
\ \
J CO~IaoNtLOT 3
( \
\
GAS PiPE /-, Wetlondl
LINE EASEMENT '~ . /
COMMON LOT 32
^
_.d
LOT 32
· EXISTING 50' OVER HEAD POWER
EASEMENT TO PROVIDE PRIVATE
SERVICE TO PROPERTIES TO EAST.
THE DEVELOPER TO NEGOTIATE
REDUCTION IN EASEMENT WIDTH.
4
EXISTING 50' OVER HEAD
POWER LINE EASEMENT
L
5
;XlSTING OVER HEAD
POWER LiNE EASEMENT
4
.30' SETBACK
Fhone: g52~37-5150 Fax: 952~37-S822
Shade Tree Construction
18530 Uly~es St. NI~
Coil 4~ Hours before digging:
GOPHER STATE ONE CAll
Twin City Area 651-454-OO02
Mn. Toll Free I-8OO-252-1166
DEVELOPMENT DATA
Total Site Area: 32.20 Acres
- Public R-O-W: Tyler Street 0;36 Acres
- Public R-O-W: Stets B, C, D & E 5.15 Acres
- Wetland~ Z07 Acre~
Developable At'em 26.69 Acres
Total Uni~: 103 Units
- Single Family:, 21 Lots
- Villa Townhome~ 54 Units
- Coach Townhome~ 28 Units
Development Density:. 3.86 Units/Acre
LOT AREA (AVERAGES)
Average S.F. Lot Area: 17,7'72 S.F.
Average Villa Townhome Lot Area: 1,493
Average Coach Townhome LOt Area: 3,816 S.F.
SINGLE FAM1LY LOT STANDARDS
LOt Width 80 Feet Min.
Front Yard Setback 30 Feet
Side Yard S~tback 5/10: 3,5 ft. Total
Typical Single Family Lot:
F JO' REAR YARD 5ET~ACK
1o' ~ SIDE YARD SETBACK TO L/kING AREA
h
SIDE (NON LIVING AREA)
L Jo'
STREET
X
NOT FOR CONSTRUCTION
S.T.C./
Fischer
100' 200' 500'
P-10 20Ol1101.00 20011101SPPl.DW~
12/21/01 sh~ 3 o~ 7
Site Plan
02001 Westwood Professional Services, ~nc. Call 48 Hours before digging:
GOPHER STATE ONE CALL
., i
ih
,,,',~ ----- 2 ,
meE PROTE~noh ',, '" '" ~
FENCE (TYP.) '-.'
!~i \.g2a/ f
J~j ~ //~ LOT CORNER ELEVATION
~ 2 2 ~ -- LOT NUMBER
it t--DRAINAGE ARR°w
m 916 0 ' WALKOUT/LOOKOUT GRADE
// ']-.. I ELEVA.ON (,F APPUCABLE)
wa
~ ~2~ ~iNi~U~ BASEMENT FLOOR
I I ~ ~ j ~ ELEVA~ON
J ~ / /J~ ~FRONT~AOCC~VA~O.
E
J~C~ LOT
EXTRA STRENGTH FILTER FABRIC\
TY~E II -- ADD WIRE MESH BACKING
~(PE Ig -- ADO WIRE MESH . ~
AND HAY BALES
wood POST ~o~
~0'--0' &lAX. SPACING
6'--0" MAX. SPACING ~OUT
~RE SUPPORT FENCE
9" MAX.
PONOING HEICHT r-
/~ FILTER FABRIC.
/
RECOMMENDED
STORAGE HEIGHT
J-J// All'ACH SECURELY
STEEL OR · I M TO UPSTRE~d n
36' HIGH MAX J j SIOIF Or POST_
WOOD POST RU~NOFF ~ RUNOFF
~° TRENCH 12" MI
WITH COMPACTED
STANDARD DETAIL
TRENCH WITH NA~tVE~ BACKFILL ALTERNAIE DETAIL.
TRENCH WI~I-I GRAVEL
NOTE:
1.INSPECT AND REPAIR FENCE AFTER EACH
STORM EVENT AND REMOVE SEDIMENT WHEN
NECESSARY.
2. REMOVED SEDIMENT SHALL BE DEPOSITED
TO AN AREA THAT WILL NOT CONTRIBUTE
SEDIMENT OFF-SITE AND CAN BE
PERMANENTI. Y STABlUZED.
3. SiLT FENCE SHALL BE PLACED ON ELOPE
CONTOURS TO MAXIMIZE PONOINO EFFIOENCY.
GENERAL GRADING & DRAINAC.4~ NOTES:
J '~,'~V Westwood Professional Services, Inc.
· v 7599 Anagram Ddve
J
l~pared fo~.
Shade Tree Construction
~ ~theh Mbm~o~a ~
Twin City Area 651-454--OOO2
Mn. Toll Free 1-800-252--1t66
NOTE:
ROCK CONSTRUCTION ENTRANCE SHOULD BE
A MINIMUM HEIGHT OF 1.0' AND CONTAIN
MAXIMUM SIDE: SLOPES OF 4:1.
{ROCCOflSTRUC~ON J
EHTR~IC~ j
STORMWATER PONDING
(PUBLIC VALUE CREDIT)
W~TI_AND FIll
WE Il. AND REPLACEMENT
(Wetland Creotlon; New Wetl~d Credit)
REGRADED WETLAND BUFFER AREAS SHALL
BE SEEDED TO MN/OOT SEED MIX 15A
MODIFIED. A NAT1VE GRASS-WILDFLO~R
SEED MIX DEVELOPED FOR PRAIRIE REGIONS
~- SOIL BORING
DENOTES
i~,~e~ DENOTES SILT FENCE
a~J~a~em~ DENOTES HEAVY DU'~' SILT FENCE
m z~a ~ ~ DENOTES TREE PROTECTION FENCE
-~ g~(.~---- DENOTES EXISTING CONTOURS
~g~o~ DENOTES PROf~0SED CONTOURS
~---.~,. -K3 DENOTES EXISTING STORM SEWER
~---i~--~ DENOTES PROPOSED STORM SEWER
,~-"-~.'"~ DENOTES EXlSllNG TREE UNE
0ENOTES APPROXIMA]E 1REE
/~ REMOVAL UMITS
· 8..~.3 DENOTES EXISTING SPOT ELEVATION
0ENOTES PROPOSED SPOT ELEVATION
DENOTES BALE CHECKS AROUND
CATCH BASINS
DENOTES EMERGENCY OVERFLOW
E.O.r. ELEVA]ION
EROSION CONTROL NOTES:
X
NOT FOR CONSTRUCTION
S.T.C.!
Fischer
I J
O' 100' 200' 300'
p-10 20011101 20OI11OICOF1.DWG
12/21/01 ~ 4 o~' 7
Grading, Drainage &
Erosion Control Plan
02001 Westwood Professional Services. Inc. CaU ¢8 Hours before digging:
GOPHER STATE ONE CALL
R[=895,6
I CC~IONILOT 3
\
4
COMMON LOT 32
3
4
RE=906.3
IDRO~ IE NE=896.3
IE=892.7
RE-904.6
RE=908.3
tE=898.3
LOT 32
i!
Westwood Professional Services, Inc. "~T~'~' ~'~'~'-~' ~"~ -
Eden Prairie. MN 553~4
Phone: 952~137-5150 Fax: 9S2/937-5822 F
u.~ 12/21/01 ~ ~__ 17716
OLm_OT B
5
1
! RE=921.3
4
RE-933.7
IE=925.7
GENERAL UT1LITY NQTE$:
· ~E CONTRACTOR SHALL V~RIFY ALL E×IS~NC CONOI~ONS PRIOR TO CONS'~UCTION
AND NOTIFY THE OWNER OF ANY OIFFI-~RENCES.
· UNLESS OTHERWiSE NOTED. ALL MATERIALS, CONST. TECHNIQUES ANO TESTING SHAU_
CONFORM TO TI~E 1988 ED. OF' ll-IE "STANDARD UTIUTIES SPECIFICATIONS FOR WATER
MAIN AND SERVICE LINE INSTALLAllON ANO SANITARY SEWER AND STORM SEWER
INSTALLAllON BY THE CITY ENCINEERINC ASSOCIATION OF MINN." ANO TO TIdE
"STANDARD SPECIFICAllON FOR HICHWAY CONSTI~UCllON' MINN. DEPT. OF TRANS..
JUNE 9.1988 INCLUDING THE CURRENT ADDENDUM. THE CONTRACTOR SHALL BE
REQUIRED TO FOLLOW ALL PROCEDURES AS OUTLINED BY THE LOCAL AGENCY.
· TI-IR CONTRACTOR SHALL RECEIVE THE NECESSARY PERMITS FOR ALL WORK OUTSIDE
OF THE PROPERTY UMITS.
· SEE ARCH. PLAN FOR EXACT BLDG. LOCATION. SEE: SiTE PLAN FOR LAYOUT DIMENSIONS.
SERVICE ENTRY LOCATIONS TO BE COOROINATED WtTH THE ARCHITECT.
· VERIFY EXISTiNG INVERT LOC. & ELEV. PRIOR TO BEGINNING CONSTRUCTION.
· THE WATER SERVICE SHALL BE INSTALLED WITH A MIN. OF 7.5 FT. OF COVER. THE
CONTRACTOR SHALL VERIFY THE CITY AS-BUILT CONSTRUCTION PLANS TO CHECK
LOCATION AND MAlaRIAL TYPE.
· ALL STORM SEWER PiPE SHALL BE CLASS 5 UNLESS OTIqERWISE NOTED.
· THE CONTRACTOR SHALL CONTACT 'GOPHER STATE ONE CALL' FOR
FOR UllUTY LOCAllONS PRIOR TO UTIUTY INSTALLATION.
TYPICAL VILLAS UTILITY SERVICE I.AYOUT
6" PVC SAN, SERVICE
W/CLEAN OUT
LEGEND
EXISllNG PROPOSED
SANITARY SEWER -- ~ -- SANITARY SEWE:R -- · ....
WATER .....
HYO. W/VALVE
STORM SEWER --
DRAIN TILE ----~----
NOT FOR CONSTRUCTION
$.T.C./
Fischer
Twin City Area 651-454-0007
Mn. Toll Free 1-800-252-1166
I J
O' tO0' 200' 300'
r~= 12/2'1/01 s~ 6 o~ 7
Preliminary Utility
Plan
02001 Westwood Professional Services. Inc.
West'wood Professional Services, Inc.
7599 Anagram Drive
Eden Prairie, MN 553~4
Phone: 952J937-5150 Fax: 95~J937-5822
12/21/01 ~ ~ ~64,54
J~
\
\
Plant Schedule
QTY. SYMBOL
OVERSTORY DECIDUOJS
154 ~
COMMON,/8OTANICAL NAME SIZE
Hockberry/Celtis occideflta~is 2" BB
Common ~lorrdess Ho~le~locust/Gleditsia triconthos var, inetrnis 2' B8
Red 5pie~dor Crab / Malus · 'Red Splendor' 1.S' 88
Preserved Existing Trees
NOT[:OUm, m~ES ON I~N SUPERSEDE UST OUANTHIES iN EVENT O~ OISCR~-PANCY.
Planting Notes
Landscape contractor shall vfsit siteprior to submitting bid to become
completely famitiar with the site conditions.
It is the responsibility of the ca~tractor to identify all underground cables,
conduits, wires, etc. oel the Foperty.
remo~-d after 5/I.
Shade Tree Construction
18530 Ui)mm~ St. NE
East Bethel, Minnesota 55011
Landscape
Call 4-8 Hours before digging:
GOPHER STATE ONE CALL
Twin City Area 651-¢54-0002
Mn. Toll Free 1-800-252-1166
Requirements
EEOUIEEO (6355,18/40 ~ 158 trees)
Trees o~ site:(100~)
Overst~'y: (50~)
Ornamental:
Coniferous!
PRO'~IOEO
Trees o~ site:
158
8O
59
59
252
154
59
59
Overstory Tree Detail
,Evergreen Detail
NOT FOR CONSTRUCTION
S.T.C./
Fischer
Elk Rive~, Mtnn~
i ~.~ 12/21101 a~
Preliminary
Landscape Plan
100' 200' 300'
02/13/02 13:47 FAX 952 937 5822 WESTWOOD PROF. SERVICES ~004
Westwood Professional
7599 Anagram Drive
Eden Prairie, MN 55344 \
Phone: 612/937-5150 Fax: 612(937-
Trott Brook Crossing
30' Driveway
.O2/13/02
O' 15' 30' 60'
CEF F.'Drow\Projects\20011101 \20011101PLA T{25',).DWG
02/13/02 13:47 FAX 952 937 5822 WESTWOOD PROF. SERVICES ~003
7599 Anagram
Eden Prairie
Phone: 612/937-5150
mai Services, Inc.
Trott Brook Crossing
25' Driveway Alternative
j J '~}2/13/02
O' 15'
CE? I:": Drow\Projects\£O011101 \20011101PLA T(25',).DWG
~-' Westwood Professmonai
/ ~ .' '~k'~ 759S Anagram Drive '
' / //~ · Eden Prairie, MN 55344
· * / · · Phone: 612/937-5150 Fax: 613FJ31
Trott Brook Crossing
23' Driveway
~O2/13/O2
O' 15' ..tO' 60'
CEF F'Oraw\Project$ \20011701 \20017101PLA T(25').DWG
wood Professional Services, Inc.
31
STREET E
COMMON LOT 32
LOT 32
COMMON LOT 4
3
4
4
4
5
2
3
2
Trott Brook
25' Driveway
Crossing
Alternative
Westwood Professional Services, Inc.
7599 Anagram Drive
Eden Prairie, MN 55344
Phone: 952/937-5150 Fax: 952~937-5822
Drown by: WH
Job No: 20011101
p: ~20011101 \20011101PLA T.D WS
~IOE EL~EV~TION ~,/1~~
F~ONT ELEYATION'--~/I~'" · 1'-0"
OPTION
Z
~lgl= EL..i=¥ATJON 5/1~" · I'-0"
oPT~o~
II
II
II
tl
V2' Mi.
~[NING.
l f-o'
)3'4r
4o ~ pAT'I~
&' N
~I¥IN~
FIRST FLO0~ PL,~N 3/1~," = 1'-.0"
II
II
I
I
I
I
I
I
I
I
I
I
I
t~IIT t
1
1
I
I
L_
FRONT E LIE~'ATIO N -- -
REVISIONS
(612) 452-2044
..................... ~
rJzz-:lcc czz-z z z_-zcz zz722_- z_--z _--_-_.-_ z z_--z 2 c 2_-2z-- zzzz 2 ~ z c ~z-~
RIGHT ELEVATION
~ ~ ....... -ZZ2ZZ£ZZZZ--ZS-h
,~ LEFT ELEVATION
12' X 12'
WOOP PgCK
gIVIN~ ROOM
PINING ROOM
KItCHeN
~gROOM~2/
-SZZZZ~ ..........
PAMIL. Y ROOM
~PR00M,b5
is'hr
PAMIt. Y ROOM
W1C
/v~CH,
b
WALL
.....................
:Il'dY
2P~00M~5 '
P,~IL.Y ROOM
_. MEH,
UN[XCAVA"I~D
I
t~AMIL-Y ROOM
L
/v~CH,
4' LE
2OXO~NC.
BASEMENT PLAN
"THE SAPPHIRE"'
--WITH BASEMENT--
END UNIT
) I~PYR~HT D.L HORTON C~S'IOM HOME~, ~. ~2 ~
BASEMENT PLAN
''THC' ;'EARL''
..~ --WITH BASEMENT--
BASEMENT PLAN
'"THE PEARL''
--WITH BASEMENT--
C I:'- NTE R UNIT
BASEMENT PLAN
"TH E SAF::'PHI RE"
--WITH BASEMENT--
UNI'T
PlNIN5 ~OOM
.... ~.
~P~00M~'2 / ~N Jt
12' × 12'
W00¢
2¥10
PINING LOOM
(2) 9-1/2'
M&51'¢ ~ I;~PR00M
12' × 12'
W00P I~CK
PINING
~PI~OOM~2 / ~
(2) 9-1/2'
/Vv6'r¢ F, ~PR00M
k~.51'gE
KITCY~N '*
WING ROOM
PINING I~OOM
~PROOM'~ 2 f
(.t) 2x~o
504 ~, FT.
526 5<2. FT,
i~-ii i~ II'-O it/'
52' .ir
504 SQ, FT.
io'-i i I/7
50~ SO. FT.
(3) 2x10
!S77 FO.
FLOOR PLAN
"'THE SAPPHIRE"
,~kl-- WIT i BASEMENT--
END UNIT
ALTERNATE BATH
IP77 FO, fl;
FLOOR PLAN
--WITH BASEMENT--
OENTER UNIT
ALTERNATE BATH
IP77 FO. ff.
FLOOR PLAN
--WITH BASEMENT--
CENTER UNIT
ALTERNATE BATH
l~77 FO,
FLOOR I~LAN
"'THE: S ,~, F=:" I:::::> t--I I F~
--WITH BASEMENT--
END UNIT
ALTERNATE BATH
=2001 Westwood Professional Ser~ces. inc.
~B_O P o L%E_D
LAT
~E
7599 Anagram D~ ~ ~
~,..,.,..,..,5~. ~-:- ._ a e Tree ons~ction
~: 95~37-5150 F~ ~37.~ ~ ~ ~ ~ ~/~ ~ ~ ~ ~
Total Parking Stalls
Total Stalls (105 Homes): 587
Garage: 206
Driveway:. 265
Private Orive/Bay~: 19
Street: g7
Total S/F Stalls (21 Homes): 172
Garage: 42
Driveway. 72
Street: 58
Total M/F Stalls (82 Homes): 415
Garage: 164.
Driveway:. 19.3
Private Drive/Bay~: 19
Street: 39
(pkg./un.)
5.7
8.2
5.0
Garage Stalls:
Driveway Stalls:
Private Drive/Bays:
Street Stalls:
NOT FOR CONSTRUCTION
S.T.C./
Fischer
Call 48 Hours before ai99incj:
GOPHER STATE ONE CALL
Two City Area 651-454-0002
Mn. Toil Free 1-800-252-1t66
100' 200' 300'
p-lo 2001110100 200Ill01PRKI.DWG
01/0'7/02 s~-,= 1 o~ 1,
Prelim.inary
Parking Plan
01/07/02 14:24 FAX 952 937 5822 WESTWOOD PROF. SERVICES ~002
./0.
/I.
6
01/07/02
I
14:24 FAX 952 937 5822
WESTWOOD PROF. SERVICES ~ 003
PROPOSED TROTT BROOK FARMB BOUTH P .A~
i COMMONILOT ~
( \
\
\
GAS PIPE
LINE EASEMENT
+;3.81
COMMON LOT 32
LOT 32
po~.i
21:46 7634415176 JOHN WEICHT ASSOCSSO PAGE 02
January 29, 2002
Elk River City Council
Elk River, MN 55330
Re: Plat 33.2 Acre Development
First, I want to compliment the developer for adhering to the
obligation to put the street adjacent to the perimeter of my 7.3
acre outlot and for bringing in the access between my future lots
4 and 5. Both of these were key points in defining the boundaries
and future lot lay out of the outlot in 1998. These are covered
by a put option with AVR Associates that do not expire until
2003. Another obligation which transfers is to cover the cost of
propane in the event the natural gas is interrupted during
construction.
Second, I respectfully request that the ring of lots surrounding
my 7.3 acre outlot be increased in size from approximately h to
1/3 acre, as originally zoned. The smaller lots would decrease
the value of my lots which are intended for larger homes.
Third, I would like to have utility stubs placed in such a manner
to service the individual lots prior to street pavement and will
pay for the extra customary costs involved.
Fourth, I would like to have the curb and pavement extended into
my cul de sac as shown, again at my cost.
Fifth, a minor error, lot 3 is actually 2 lots. The additional
lot line goes from the center of the cul de sac and bisects the
northern boundary of lot 3.
Thank you in advance for your consideration. I will contact you
personally prior to the next council meeting.
Regards,
Bob Van Den Berg
10811 18!~ Ave NW
Elk River, MN 55330
Ph. 763 441-6293
Cell 612 963-3718
cc. Dick Hoel, winthrop & Weinstine
Liza Robson, AVR & Associates
Ron Wald, Developer
GOPHER STATE ONE CALL
6
7 3
Shade Tree Cons[ruction
NOT FOR CONSTRUCTION
Tro~ Brook
Crossing
Site Plan