Loading...
6.4. SR 01-16-2001City of E River FROM: DATE: SUBJECT: MEMORANDUM Item # 6.4. Mayor and City Council Scott Harlicker, Senior Planne, r~ January 16, 2001 Request for Preliminary Plat of Hillside Estates Eighth Addition, Public Hearing Case No. P 00-18 Request Phoenix Enterprises requests Preliminary Plat approval of Hillside Estates Eighth Addition, a 104-1ot single-family residential subdivision in the Rle zoning district. Loca~on General Description: West of Auburn St, east of Highway 169 and South of 197th Avenue. That part of the Northeast Quarter of Section 27, Township 33, Range 26 and the Northwest Quarter of the Northwest Quarter of Section 26, Township 33, Range 26, Sherburne County, Minnesota lying easterly of U.S. Highway 169, except that part platted... (Hillside developments), together with Outlot A and B Hillside Estates 1st Addition and Outlot B, Hillside Estates Fourth Addition. Zoning / Land Use Rle (Single Family Residential) / MR (Medium Density Residential) Attachments · Location Map · Preliminary Plat, dated 12/20/00 · Grading and Erosion Control Plan (3 pages), dated 12/20/00 · Landscape and Tree Preservation Plan, dated 12/20/00 · Howard IR. Green Memorandums, dated December 21, 2000 and January 10,2001 · Exhibit C, Hillside Estates Park and Trail Plan, dated November 22, 2000 · Section 1008.18, Park Dedication Requirements · Letter from Cheryl Becker · Map of Lot Averaging for all of Hillside Estates · Minutes of Park and Recreation meeting of 2/9~00 and 11/8/00 · Memo from the Chief of Police and Fire Chief 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone (763) 441-7420 · Fax (763) 441-7425 Memo to Mayor and City Council/P 00-18 January 16, 2000 Page 2 Overview: The preliminary plat dated December 20, 2000, is for a 104 lot single-family residential subdivision on 62.74 acres in the Rle zoning district. Hillside Estates Eighth Addition is the last section of Hillside Estates to be developed. Hillside Estates encompasses about 190 acres and began developing in 1994. The proposed subdivision includes a 4.27 acre (Outlot D) Park with trails in the adjacent power line corridor (Outlots B and C). Together the park and trail/utility corridor encompass 13.43 acres. Credit for park dedication will be adjusted to reflect the amount of utility corridors, wetlands and steep slopes encumbering the property. Analysis: Existing Conditions The site is located in the woods behind Menards, south of 197th Avenue and north of Hillside Estates 1st Addition. The site consists of rolling hills and mature Oak woods and several wetlands as has been typical in previous Hillside Estates developments. Crossing the site are two power line easements, a 240 foot wide Northern States Power power line easement and a smaller 60 foot wide United Power Association power line easement. Within the woods, staff found numerous ATV/pedestrian trails that connect the Hillside 5th and 2nd Additions to the commercial area along Highway 169. Phasing No phasing of the development has been indicated, however, the developer has stated that the first phase would include connecting Dodge Street to 196th Lane near Menards. This is being done to to encourage the new traffic to drive west rather than using Auburn Street. Lot Configuration/Lot Averaging All the proposed lots meet or exceed the dimensional requirements of the Rle zoning district including the 12,000 SF minimum lot area requirement. The lots range in size from 12,000 SF to 46,000 SF, with the average lot size being 16,812 SF. The average lot size of the other phases of Hillside Estates are as follows: Hillside Estates 1st Hillside Estates 4th Hillside Estates 9th 18,000 SF 13,500 SF 20,700 SF The areas that these phases include are shown on the attached map. Wetland Conservation Act The developer has shown areas of fill and wetland mitigation, which will require a Technical Panel review and approval as required by the Wetland Conservation Act. As proposed, each of the four wetlands in the development will be partially filled to s:\planning\scott\pO018cc.doc Memo to Mayor and City Council/P 00-18 January 16, 2000 Page 3 accommodate lots or grading. Lot 11, Block 5 and Lot 15, Block 2 require filling of wetlands. Grading, Drainage and Erosion Control (See the Attached Howard R. Green Memorandum). Utilities (See the Attached Howard R. Green Memorandum). Tree Preservation Most of the existing woods will be removed with construction in order to accommodate the required grading. All trees shown as preserved shall be protected prior to clearing or site grading by fencing the drip line of protected trees and the limit of grading with a snow fence to prevent unnecessary grading, compaction, or storage of debris or equipment. 50-Foot No Cut Zone A condition of the Hillside Crossings commercial development conditional use permit stipulated that a 50-foot buffer was to be maintained between the commercial area and future residential development. This buffer area is presently shown inclusive of the required back yard area. No additional buffer area has been provided behind Menards. Landscaping The Landscape and Tree Preservation Plan conforms to City requirements. No landscaping has been proposed for the park area; however, staff has prepared a landscape plan for the park with conifers and shrub plantings along the back yards of existing residential lots. (See attached Exhibit C, Hillside Estates Park and Trail Plan). Development Signs No development signs have been indicated. Roads The preliminary plat now shows a reconfigured road layout that more closely resembles an early concept plan for the area. Dodge Street will extend north from its present location to a T intersection with a three way stop. This has been done in response to comments regarding cut-through traffic on Dodge heard during the November 28th public hearing. Dodge Street is currently an 863 foot long temporary dead-end. There has been a great deal of discussion regarding creating a permanent cul de sac on Dodge Street, similar to what has been proposed for Auburn Street. The maximum length for a cul de sac is 700 feet, the current street already exceeds the maximum length, adding additional length for a cul de sac will only increase the non-conformity. Chief of Police Zerwas has indicated s:\planning\scott\pO018cc.doc Memo to Mayor and City Council/P 00-18 January 16, 2000 Page 4 in his attached memo that there are also public safety concerns regarding turning Dodge Street into a cul de sac. Dodge Street and 196th Lane will provide the only ingress and egress to and from the plat. 196th Lane is presently constructed to the east property line adjacent to Menards. There will be six new cul-de-sacs, in part due to the rolling terrain and wetlands. Snow storage easements will be required in each cul-de-sac as has been required in other developments. Sidewalks Sidewalks will be constructed along the north side of 195th Ave, the east side of Dodge St. and on the north side of 196th Lane to provide a pedestrian circulation loop that connects the park to the commercial area along Highway 169. The Commission and some of the public had requested that a sidewalk be added along Dodge Street to 193rd. Parks and Trails The proposed Park, Outlot D, is 4.27 acres in size of which about half is wetland, utility easement or steep slope. A 60-foot wide powerline easement crosses the Park in a north-south direction and a watermain easement crosses the park in an east-west direction. A play structure, tennis court and basketball court are proposed amenities for the park. Staff has provided a landscape plan that identifies screening of the backyard of existing homes. Outlots B and C, the 240 feet wide Northern States Power power line corridor combined are 9.16 acres in size and will be used as a trail corridor linking the Hillside 5th Addition Park, the new Hillside 8th Addition Park to 195th Circle and 196th Lane. The trail will be a 10 foot bituminous trail with a gradient of 8%, which will require grading in the utility corridor. Outlot B is too steep for a bituminous trail, but may include a woodchip trail at a later date if the Park and Recreation Commission determines that the amount of foot traffic warrants one. To construct a woodchip trail, an easement will be required across the commercial lot west of the plat. Together, the park and trail/utility corridor encompass 13.43 acres and have adequate road frontage and enough flat area for the proposed amenities. The attached Exhibit B, Hillside Park and Trail Plan, shows the trail and park connections and proposed landscaping of the proposed Hillside 8th Park. Park and Recreation Commission The Park and Recreation Commission recommended that the Planning Commission and Council accept the Park for park dedication, excluding the power corridor, steep slopes and wetland from full dedication credit as required by the Subdivision Ordinance. Also, that the remaining Park Dedication requirements be accepted as a cash dedication in lieu of land. The developer will install the trail as part of the public improvements and will be reimbursed from the trail fund as required by City Ordinance. The Park and Recreation Commission recommended the proposed location for park for Hillside Estates 8th because it was centrally located and would better serve the residents of the entire Hillside Estates development, it is in a relatively level area, and would not require the removal of any trees in order to install improvements. There have been several comments about placing the park behind Menards. The placement of the park s:\planning\scottkpO018cc.doc Memo to Mayor and City Council/P 00-18 January 16, 2000 Page 5 behind Menards might serve as a buffer between Menards and the immediate neighbors, but it would require the removal a substantial number of trees, is not centrally located in the Hillside Estates development and would require significant grading. The Park and Recreation Commission will be reconsidering the use of Hillside Estates 5th Addition Park in consideration of the amenities being proposed in the Hillside Estates 8th Park. Planning Commission Meetinqs On November 28, 2000, the Planning Commission held a public hearing for the preliminary plat of Hillside Estates Eighth Addition. At that time, the Commission continued the public hearing to December 12, 2000 because of insufficient information for review and of unresolved issues. On December 12, 2000, the public hearing was again held. The public hearing was again continued to the December 27th meeting because of unresolved issues and because there was little time to review the submittal. On December 12, the issues raised by staff, the Commission and the public include: 1. Excessive retaining wall heights. 2. Concerns regarding traffic on Dodge Street and 193r~Avenue. 3. Buffering between the residential and commercial districts. 4. Trails along back yards. 5. The park being located too close to the powerlines and that it should not be placed behind the existing homes on Auburn. 6. Dodge Street as a cut-through road. 7. Concerns over loss of existing trees. 8. Concerns about the small size of lots. 9. The need for sidewalks along Dodge Street to 193rd Avenue. At the December 27th meeting the applicant had submitted revised plans. The revisions included eliminating a large retaining wall. Public comments at this meeting were, for the most part, the same as those heard at the December 12th meeting. The main concerns were increased traffic on Dodge Street and the need to turn the existing Dodge Street into a cul de sac, the need for sidewalks on Dodge Street and the increase in traffic at the intersection of 193rd Avenue and Evans Street. Issues raised by the Planning Commission include: 1. The depth of the lots on Dodge Street behind Menards. 2. The large number of retaining walls. 3. Concern about Lot 11, Block 5 and Lot 15, Block 2 because of the excessive grading and wetland fill and whether they are suitable building sites. The Commission recommended eliminating these two lots. 4. Buffering between the residential and commercial districts. 5. Concerns about the small size of lots. 6. Need for additional sidewalks, especially along Dodge Avenue. 7. Additional tree replacement. s:\planning\scott\pO018cc.doc Memo to Mayor and City Council/P 00-18 January 16, 2000 Page 6 Since traffic on Dodge Street seemed to be the main concern raised by residents at the 3 public hearings, staff would like to provide the following background information: In 1994 the City granted final plat approval to Hillside Estates 1st Addition. Included as part of that plat was the construction of Dodge Street to its current terminus. Dodge Street was platted up to the northern boundary of the plat; it was always intended to be extended through to the north. The current length of Dodge Street is 863 feet. A cul de sac would probably extend the length by at about 150 for a total length of 1013 feet. The maximum length allowed for a cul de sac is 700 feet. Furthermore, if Dodge Street was converted to a cul de sac, Auburn Street would be the only north-south connection in the entire Hillside Estates development. Recommendation After a lengthy discussion, the Planning Commission and staff recommend the City Council approve the preliminary plat of Hillside Estates Eighth Addition for 102 single family lots with the following conditions: THAT A DEVELOPERS AGREEMENT BE PREPARED OUTLINING THE TERMS AND CONDITIONS OF THE PLAT APPROVAL AND INSTALLATION OF IMPROVEMENTS TO BE RECORDED WITH THE FINAL PLAT. 2. THAT THE APPLICANT COMPLIES WITH THE WETLAND CONSERVATION ACT AND THAT: A TECHNICAL PANEL REVIEW OF ANY FILLING OR MITIGATION OF WETLANDS. · THE DEVELOPER'S AGREEMENT FOR THE PROJECT INCLUDE LANGUAGE THAT PLACES THE RESPONSIBILITY OF THE SUCCESS OF THE WETLAND MITIGATION ON THE DEVELOPER. · THE DEVELOPER OBTAIN ALL THE APPLICABLE PERMITS PRIOR TO FILLING ANY WETLANDS. · A RESTRICTIVE COVENANT AND DRAINAGE AND UTILITY EASEMENT BE RECORDED ON THE WETLAND MITIGATION AREAS WITH THE RECORDING OF THE FINAL PLAT. · THAT A LETTER OF CREDIT BE PROVIDED TO THE CITY IN THE AMOUNT OF 100% OF THE COSTS OF PUBLIC IMPROVEMENTS INCLUDING THE COST OF THE MITIGATION WORK. · THAT THE DEVELOPER SUBMIT A WRITTEN MONITORING REPORT ON THE REPLACEMENT WETLANDS ONE YEAR AFTER THIS MITIGATION WORK IS COMPLETED AND THAT THIS REPORT BE APPROVED BY CITY STAFF PRIOR TO RELEASING THE LETTER OF CREDIT. 3. THAT ALL COMMENTS OF THE CITY ENGINEER BE ADDRESSED. 4. THAT STREET LIGHTS BE INSTALLED AS REQUIRED BY ELK RIVER UTILITIES. 5. THAT A SNOW STORAGE EASEMENT BE PROVIDED IN THE CUL-DE-SACS PRIOR TO RELEASING THE PLAT FOR RECORDING. 6. THAT THE 10 FOOT BITUMINOUS TRAIL BE CONSTRUCTED IN THE PARK AS PART OF THE PLAT IMPROVEMENTS AND CONSTRUCTED TO CITY STANDARDS. s:\planning\scottkpO018cc.doc Memo to Mayor and City Council] P 00-18 January 16, 2000 Page 7 7. THAT THE PARK BE ACCEPTED TOWARDS PARK DEDICATION ( WITH A REDUCTION FOR WETLAND, STEEP SLOPES AND UTILITY CORRIDOR) AND THE REMAINING DEDICATION REQUIREMENTS BE ACCEPTED AS CASH IN LEIU OF LAND IN THE AMOUNT REQUIRED BY THE CITY AT THE TIME OF FINAL AND PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. 8. THAT PARK BOUNDARY MARKERS BE INSTALLED AS REQUIRED BY CITY ORDINANCE. 9. THAT ALL THE MAIL BOXES IN THE CUL-DE-SACS BE CLUSTERED. t0. THAT UPON COMPLETING ALL OF THE IMPROVEMENTS AND HAVING THEM ACCEPTED BY THE CITY, A WARRANTY BOND IN THE AMOUNT OF 25 % OF THE IMPROVEMENT COSTS SHALL BE SUBMITTED TO THE CITY FOR A ONE-YEAR PERIOD. 11. THAT A SURFACE WATER MANAGEMENT FEE IN THE AMOUNT REQUIRED BY THE CITY AT THE TIME OF FINAL PLAT BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING WITH SHERBURNE COUNTY. 12. THAT A SEALCOAT FEE BE PAID TO THE CITY PRIOR TO RELEASING THE PLAT FOR RECORDING WITH SHERBURNE COUNTY AS REQUIRED BY THE CITY ENGINEER. 13. THAT PRIOR TO CLEARING TREES OR GRADING, THE DRIP LINE OF PROTECTED TREES AND THE LIMIT OF GRADING SHALL BE FENCED WITH A SNOW FENCE TO PREVENT UNNECESSARY GRADING, COMPACTION, OR STORAGE OF DEBRIS OR EQUIPMENT WITHIN THE DRIPLINE. 14. THAT THE DEVELOPER OBTAINS WRITTEN APPROVAL FROM THE UTILITIES TO GRADE IN THE POWER LINE EASEMENTS. 15. THAT A RESTRICTIVE COVENANT AND DRAINAGE AND UTILITY EASEMENT BE RECORDED OVER THE 50 FOOT BUFFER AREA ADJACENT THE COMMERCIAL ZONING WITH THE RECORDING OF THE FINAL PLAT. 16. REVISED LANDSCAPE PLAN BE SUBMITTED WHICH PROVIDES A MINIMUM OF 3 TREES PER LOT OR GROUPED PER STAFF APPROVAL. 17. LOT 15 BLOCK 2 AND LOT 11, BLOCK 5 BE ELIMINATED 18. THE RETAINING WALLS BE FENCED OR TERRACED PER BUILDING CODE REQUIREMENTS. 19. THE DEVELOPER, HOMEOWNERS ON DODGE STREET AND THE CITY MEET TO DISCUSS THE EXTENSION OF THE SIDEWALK ALONG DODGE STREET. 20. SIDEWALK BE ADDED TO THE WEST SIDE OF DODGE STREET. 21. THE FOLLOWING CONDITIONS OF THE PARK AND RECREATION COMMISSION BE INCLUDED AS CONDITIONS OF PLAT APPROVAL: THAT LOT 1, BLOCK 5, BE INCORPORATED INTO THE PARK. THAT A PAVED TRAIL BE CONSTRUCTED IN THE POWER LINE CORRIDOR AS FAR AS 196TM LANE THAT HAS A MAXIMUM GRADE OF 8% AND SIDE SLOPES NO GREATER THAN 3:1. s:\planning\scott\pO018cc.doc Memo to Mayor and City Council/P 00-18 January 16, 2000 Page 8 3. THAT SIDEWALKS BE INCORPORATED INTO THE PLAT TO CONNECT THE PARK AND TRAILS TO THE COMMERCIAL DISTRICT TO THE WEST. 4. THAT NO WETLANDS OR STORM PONDS BE ACCEPTED AS PART OF THE PARK DEDICATION. 5. THAT IMPROVEMENTS TO LAND DEDICATED FOR PARK, TRAIL AND PUBLIC OPEN SPACE PURPOSES INCLUDE, BUT NOT LIMITED TO, FINISH GRADING, GROUND COVER, CONSTRUCTION OF TRAILS AND CLEARLY IDENTIFYING PARK AND TRAIL BOUNDARIES WITH CITY APPROVED MARKERS. 6. THAT IN ADDITION TO THE LAND DEDICATED FOR PARK, THE DEVELOPER PAY IN CASH THE REMAINDER OF THE REQUIRED PARK DEDICATION. 7. PARK BOUNDARY MARKERS BE INSTALLED, CLEARLY STATING PARK DEVELOPMENT INFORMATION. s:\planning\scott\pO018cc.doc LOCATION LOCATION MAP CASE' p 00-18 f/ Howard R, Green Qompany CON!SULTING ENGINEERS December 21, 2000 File: 812590J-0240 Ms. Michele McPherson Director of Planning City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: HILLSIDE 8TH ADDITION Dear Ms. McPherson: As requested, we have reviewed the revised grading plan for the Hillside Estates 8th Addition. The plan we reviewed was prepared by Pioneer Engineering and had a revision date of December 12, 2000. There are a number of issues with this revised grading plan. The major ones include the significant retaining walls that have been added to eliminate all the wetland encroachment, the retaining walls and grading for the most southerly lots on Dodge Street, lack of emergency overflow information for the vadous ponds and drainage areas, and a number of more minor grading issues. Frank Kriz of my office has redlined the grading plan and together we have discussed all of our issues with Leon Opatz, P.E., from Pioneer Eng.ineedng, who prepared the plan. Mr. Opatz discussed with me this afternoon each of these issues, stating that he understood the issue and would make the revision necessary. With these changes, I believe that the grading and erosion control plan will be approvable. One word of caution, however, is that removal of the retaining walls adjacent to the wetlands may require some filling of the wetlands. I indicated to Mr. Opatz that he would still have to go through the Technical Evaluation Panel regarding the Wetland Conservation Act. He understood that he would have to go through this process and that the Technical Evaluation Panel may not approve the filling of the wetland, in which case one or more lots may be lost from the development. If you have any specific questions regarding issues of the grading and drainage plan, please call. Sincerely, Howard R. Green Company Terry J. Maurer, P.E. TJM:tw O:~PROJ~812590j\0240~.tr 12-21-00 McPherson.doc 1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Howard R, Green Gompany QQNSULTING ENGINEERS January 10, 2001 File: 812590J-0240 Mr. Scott Hadicker Senior Planner City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: HILLSIDE ESTATES 8TH ADDITION Dear Mr. Harlicker: As requested, we have reviewed the most recent revised set of Hillside Estates 8th Addition plans prepared by Pioneer Engineering and dated December 21, 2000. At this point in time, the only significant change that has been made to these plans is the elimination of the retaining walls adjacent to the wetland complexes at various locations in the development. The grading plan now shows 3:1 slopes encroaching into the various wetlands. As discussed at the Planning Commission meetings, this will require that the project go through the Technical Evaluation Panel (TEP) relative to the Wetland Conservation Act. As of today's date, a meeting of the TEP has not been scheduled. All the other vadous comments we made on the previous grading and drainage plans have not been addressed as of this date. However, on December 20, 2000, Leon Opatz, P.E., of Pioneer Engineering, did send a letter to the City indicating that they have received all of our comments and will be making all of the changes pdor to the final submittal of the grading plan. I called Mr. Opatz yesterday to confirm that this is still his intention, and he indicated that it is and they are working on these changes but do not have them available at this point in time. I have also reviewed our July 18, 1997, memo to the City Council regarding the intersection of 193rd Avenue and Evans Street. At that point in time, traffic counts were taken at that intersection. Two of the legs had over 5,200 vehicles per day. One leg had over 3,200 vehicles per day, and the lowest leg had over 1,700 vehicles per day. Obviously there has been significant development in this whole area in the past three and a half years, and the development of the proposed Hillside Estates 8th Addition will add even more traffic to this intersection. In 1997, we recommended the installation of the 3-way stop at 193rd Avenue and Evans Street, and indicated that the intersection did not currently meet any warrants for a traffic signal but may at a future date. At this time, we would recommend that this intersection have the traffic recounted in the spdng of 2001 and the traffic control at the intersection be re-evaluated. O:\PROJ~812590j\0240~tr 10-1 0-01 Hadicker. doc 1326 Energy Park Drive · St. Paul, MN 55108 ° 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Mr. Scott Hadicker January 10, 2001 Page Two If you have any questions regarding this information, please call. Sincerely, Howard R. Green Company Te~~. M~aurer, P.E. TJM:tw O:~PROJ~812590j\0240%tr 10-10-01 Hadicker.doc Howard R, Green Company CONSULTING ENGINEERS Dec-20-O0 04:09P Pioneer_Engineering 1 PIONEER c,v,, Engineers. Land Planners 'Land Surveyors- Landscape Architects engineering December 20, 2000 Terry Maurer Howard R. Green 1326 Energy Park Drive St. Paul, MN 55108 RE: HILLSIDE 8TM ADDITION P.E. # 200342 Dear Mr. Maurer: I received the marked up grading plan form Frank Kriz this afternoon and also talked to him about his concerns. I will make the changes he is suggesting, including eliminating the high retaining walls. I will also address all the other issues listed in your letter of November 22, 2000. All these changes will be made when we submit the final plat. If you have any questions or require additional information, please feel free to call me at (763) 489-2272. Sincerely, PIONEER ENGINEERING P.A. Leon P. Opatz. P.E. Stephen Weasman, City of Elk River Daryl Thompson, Phoenix Enterprises 2422 Enterprise Drive · Mendota Heights, Minnesota 551 20, (612) 681-1914 · Fax 681-9488 625 Highway 10 N.E. · Blaine, Minnesota 55434 · (612) 783-1880 · Fax 783-1883 1008 .18 - DEDICATION OF LAND OR CONTRIBUTION OF CASH FOR PUBLIC PUI~.~OSE 1. In every plat, replat or subdivision cf land to be developed for residential, commercial, cr industrial uses, or as a planned unit development which includes such uses or any combination 5hereof, iC is reasonable to require that an amount cf land equal in value to'ten percent (10%) cf the undeveloped land proposed to be subdivided shall be set aside and dedicated by the tract owner cr owners ~o %he City for parks, playgrounds, trails, or public open space. 2. If the C/~y Council, in its sole discretion, determines that ~he land proposed to be dedicated is unsuitable for parks, then the tract owner or owners ska!! contribute to the City, in lieu of park land dedication, an amount cf cash not to exceed the fair market value cf %he undeveloped land required to be dedicated, as the City Council shall determine by resolution from time to time. 3. Previously platted Residential Proper~y on which park dedication has not been received by the City, being replatted with the same number cf lots and the same number cf dwelling units, shall be exempt from all park land dedication requirements. If ~he number cf lots or the number cf dwelling units is increased, then park dedication shall be made based cn the number of additional lots or the'number of additional dwelling units. 4. Prior platted Commercial and Industrial land on which park dedication has not been received by the City, being topis=ted with the same land area, shall be exempt from all park dedication requirements. If land area is being added to a previously recorded plat, then additional park dedication-requirements shall be based on the additional land being added. 5. Any monies paid to the City in lieu of park dedication shall be placed in a special fund and used cn!y for the acquisition of land for parks, playgrounds, trails, public open space; for the develcpmen~ of such areas and sites; and for debt retirement in connection with land previously acquired or developed for such public purposes. Any monies specifically paid to the City for trails shall be used only for .the acquisition of land far trails and for the development of such land. 6. For purposes cf =his Ordinance, "fair market value of the undeveloped land" is defined as the fair market value of the land within such plat, replat, or subdivision as cf the date the plak, replat, or subdivision is presented to the City Council for approval cf the final plat, as determined by the 'City Assessor in the same manner as he determines the fair market value of land for tax purposes. 10.66 Cheryl Becker 11452 197th Avenue NW Elk River, MN 55330 Cit')., planmng and Planning Comrmssion 13065 Orono Parkway Box 490 Elk River, MN 55330 RE: Proposed Hillside Estates 8u' Addition Case P00-18 November 30,2000 Dear City Planning and Planning Commission, I am writing you to express my position and concerns in iegard to the Hillside Estates 8* Addition and the proposed trails. I may not be able to attend the workshop on December 17. I share a common property line on the north end of Hillside Crossings 4 and the new Hillside Estates 8t~ Addition. (colored lot on enclosed map) This trail issue was up before you in February. 1996 and here I am again trying to defend my position on the same matter. Listed below are rite reasons I am opposed to the trail ranmng north of 196u' Avenue: On February. 27,1996 the Planning Commission held a public hearing in regard to the rezoning and preliminary plat for Hillside Crossings 4. Al that time the commission said. "No," to the proposed trail that would have run across my back property line because they said they won't approve trails across the back of existing homes. On March 26,1996 the city counsel decided that a 10 or 20 foot "No Cut Buffer" was to be on the north and east sides of Hillside Crossings'4. I am not sure, but a trail I believe needs more than a 20 foot width between properties. My home is only 30 feet from my back p~:operty line therefore a trail would definitely violate my pr/vacy and make my property and home easily accessible to burglar), and vanctalism. I have mn a daycare business from my home at tiffs location for 13 years. My daycare children would be ex'posed to strangers and people walking dogs, and would be tempted to follow them or pet these dogs, which could be dangerous. I feet I would be forced to put up a fence, which is monetarily not an option for me, and it is unattractive. Putting the trail north of 196th and down the power line would mean the trail would have to cross a wetland and fill or grading would have to be done. The northeast corner of the Hillside crossings 4 is also wet and low and grading in the no cut buffer would be necessary and then tree and brush would have to come down. The trail would have to pass through the "No Cut Buffer" area north of Hillside 4 therefore trees, even small ones, would have to be cut. 6 months of the year there are no leaves on the branches and the cutting of the brush for this trail would open and diminish the reasomng for the buffer for our neighborhood. If a woodchip trail is put in, the woodchip trails many times are paved within a year or two because of vegetation growth and upkeep. A paved trail would attract more traffic because then roller blading, bicycles and more strollers would use the path. 10. Since the proposed trail crosses 196t~ Ave. and 196~ Ave. has the sidewalks it is not necessary for the trail to mn behind my emSUng home or the homes of the new lots. The sidewalk on 1966 Ave. connects with the sidewalk system on Evans and comes out very close to where the proPOsed trail would come out. I do not want to see the public walking or kids runmng by nor hear the public talking, shouting, kids screaming, and so forth while t ,rymg to enjoy a dinner on my deck. 11. I have also talked with Darryl Thompson, who is involved with this project, and he is not in favor oft/us trail mnmng north of 196t~ either. I have lived here since 1986 when I built the home. I have made many sacrifices already, including monetary ones, in regard to the rezoning and cleanng of the property that joins trane. I cannot sit on my deck without the som~ds of semi-trucks downshifting, the cars roaring by, I hear the loudspeakers at Menards lumber yard, (which I can hear with my doors and windows shut). I can smell the gas from the ,~aoco station, the bright lights from Menards and Amoco shine in, garbage blows onto my property from Menards and the highway. My property value was decreased ~, $_3000 on an appraisal I had done on April 15,1998, (see enclosed), because of the zoning of the Hillside Crossing 4.. Mature trees are failing do~ even two feet in diameter, in the buffer area and are knocldng down large trees on my property because of the clearing of the Hillside Crossings 4. I do not need to add to all this with the trail running across the back and people laughing, talldng, kids running and screaming down the trail. My privacy and daycare business would be great/3' affected and in a detrimental way ff a trail runs across the back of my property. My house is too close to the property line. Please put yourself imo my position. I welcome anyone from the city planmng, the planning commission, the city council, or the developers to come out and see for yourself. Thank you for taking time to read tiffs lengthy request. Sincerely, ) . Cheryl B eck/e'r 763~1-3509 AVERAGE LOT SIZE 16,800 SF HILLSIDE ESTATES 8TH AVERAGE LOT SIZE 13,500 SF HILLSIDE ESTATES 4TH AVERAGE LOT SIZE 18,000 SF HILLSIDE ESTATES 1ST AVERAGE LOT SIZE 20,700 SF HILLSIDE ESTATES 9TH Park & Recreation Commission Minutes November 8. 2000 Page 3 be a reinforced poly material at $800 per rink, but he felt the material would likely only last one Year and would need to be thrown away. Mr. Hals asked if the Commission was interested in adding a second set o boards at the Gary Street site. He explained that he also checked on s( ~e lightweight (110 lbs. per panel) "soft" hockey boards which fit togethE puzzle pieces and have rounded edges. The advantage of this material is it would float, making the panels easier to retrieve when the ice begins to if they were used on Lake Orono. The disadvantage is the cost, which .000 for an Olympic size rink and approximately $15,000 for the smaller size which the City typically has (60'xl 20'). Mr. Hals then stated that a second set of wood hockey b( site would cost approximately $3,400 for the material an for the Gary Street be built by staff. Commissioner Peterson asked if additional lighting Hals stated he did not feel additional lighting woul. currently six light poles at the site from the 1999 sE established in 1999, one for recreation skating. need to be added. Mr. necessary, since there are Two rinks were Ms. Bergh stated that Area Recreation hockey rink site for practices, and felt ther willing to schedule a second definitely a demand for one. Phil Hals stated that he has two peopl~ are interested in doing the flooding. Commissioner Sladek asked if hock could be set up on Lake Orono. phil Hals stated that the problem with the is that it would be nearly impossible to retrieve the boards off the lake end of the season. He explained that since the boards freeze into they would have to wait till spring when the ice thaws to get them out at that point, the boards would sink. He stated that the soft boards wot ideal for use on the lake, since they would float. Commissioner Dave Ar stated that he would check out the hockey boards used on Lake see what type of material is used. The Commission the following consensus on these items: · The Comr · The adde~ will discuss the soft hockey boards option next year. recommended that a second set of hockey boards be Gary Street site. CON DANA ANDERSON MOVED TO RECOMMEND THE EXPENDITURE OF UP TO $3,500 FOR THE COST OF MATERIALS FOR A SECOND SET OF HOCKEY BOARDS TO BE PLACED AT THE GARY STREET ICE RINK SITE. COMMISSIONER DAVE ANDERSON SECONDED THE MOTION. THE MOTION CARRIED 6-0. 10.B.1. Hillside 8th Addition Preliminary Plat Steve Wensman explained that Phoenix Enterprises is requesting preliminah/plat approval to subdivide 62.74 acres into 111 single family lots. The developer is proposing a 3.64 acre park to be located adjacent to the power line corridor on Auburn Street, across from the existing water tower and Hillside Estates 5~h Park & Recreation Commission Minutes November 8, 2000 Page 4 Addition Park. Mr. Wensman reviewed the changes which were made in the plan since the Commission's last review in February 2000. Commissioner Dave Anderson asked about the status of the outlots. Mr. Wensman explained that Outlots B and C will be acquired for the trail, and a 30 foot wide trail corridor will be acquired as part of Outlot B (power line corridor), north of 196~h Avenue. Commissioner Dave Anderson asked why the trail was only 30 feet and not the entire width of the corridor as originally discussed. Ms. McPherson explained that there is no logical use for the extra width (120') and the excess will be absorbed by the adjacent lots. Discussion followed regarding the woodchip trail proposed behind the houses from 197th to the power line corridor (Outlot B). Commissioner Dana Anderson asked if the developer was being given credit toward his park dedication for the power line corridor. Mr. Wensman stated that he would not receive credit. Commissioner Peterson stated that the play structure was shown farther away from the street than on the earlier concept plan. Mr. Wensman explained that the residents attending the last public meeting stated that they wanted the playground structure located as far away from the power line as possible. Mr. Dana Anderson asked if the amenities in Hillside 5th Park would be installed. Ms. McPherson explained that the amenities proposed for this park are identical to those proposed for Hillside 5th Park. She noted that City Council has made it clear that they would not support any development in the Hillside 5th Park at this time, and that if the Commission did not support the proposed Hillside 8th Park concept, they would need to make a decision whether or not they wanted to pursue the Hillside 5th Park issue. Commissioner Dana Anderson asked why the sidewalk is looped and makes no outside connection at the southwest corner near Dodge and 195m Avenue. Mr. Wensman stated that there is no iogical connection point outside of the plat, and if it were extended, the sidewalk would come out between two commercial sites on Evans Street. Commissioner Anderson stated he was concerned that the pond shown in the park area would become larger. Mr. Wensman explained that the pond could get larger with development, but that since there was steep slope, the pond would likely become deeper and not take up any more of the park land. COMMISSIONER REITSMA MOVED TO RECOMMEND THAT THE PLANNING COMMISSION AND CITY COUNCIL ACCEPT THE PROPOSED PARK FOR HILLSIDE 8TM ADDITION WITH THE FOLLOWING CONDITIONS: 1. THAT LOT 1, BLOCK 5, BE INCORPORATED INTO THE PARK. 2. THAT A PAVED TRAIL BE CONSTRUCTED IN THE POWER LINE CORRIDOR AS FAR AS 196TM LANE THAT HAS A MAXIMUM GRADE OF 8% AND SIDE SLOPES NO GREATER THAN 3:1. 3. THAT SIDEWALKS BE INCORPORATED INTO THE PLAT TO CONNECT THE PARK AND TRAILS TO THE COMMERCIAL DISTRICT TO THE WEST. Park & Recreation Commission Minutes November 8, 2000 Page 5 4. THAT NO WETLANDS OR STORM PONDS BE ACCEPTED AS PART OF THE PARK DEDICATION. 5. THAT IMPROVEMENTS TO LAND DEDICATED FOR PARK, TRAIL AND PUBLIC OPEN SPACE PURPOSES INCLUDE, BUT NOT LIMITED TO, FINISH GRADING, GROUND COVER, CONSTRUCTION OF TRAILS AND CLEARLY IDENTIFYING PARK AND TRAIL BOUNDARIES WITH CITY APPROVED MARKERS. 6. THAT IN ADDITION TO THE LAND DEDICATED FOR PARK, THE DEVELOPER PAY IN CASH THE REMAINDER OF THE REQUIRED PARK DEDICATION. 7. PARK BOUNDARY MARKERS BE INSTALLED, CLEARLY STATING PARK DEVELOPMENT INFORMATION. COMMISSIONER DAVE ANDERSON SECONDED THE MOTION. THE MOTION CARRIED 6-0. 10.C. 1..park Land Acquisition Prioritization Ms. McPherson and Chair Kuester conducted an exercise fo prioritize possibl, future park properties. The following properties were determined to be thc priorities: six 1. Bailey Point 2. Specht Property 3. Bloomdahl Property 4. Alvertta Malstrom Property 5. (Tie) Hoebelheinrich Property and Schulze Property 6. Greys Property This list will be presented to the City Council for disct and direction. 10.C.2...Review Park Fee~ Trail Reimbursement Policy Ms. McPherson explained that after furth policy, staff is proposing that the City staff will provide a trail construction st December meeting. of the trail reimbursement using the current method, but that for the Commission's review at the ?,ark Facility Use Fee/Deposit COMMISSIONER REI' FEES FOR RESERVING PAl ENCLOSED PARK SHI OPEN PARK SHELT TO RECOMMEND APPROVAL OF THE FOLLOWING FOR 2001: RESIDENT NON -RESIDENT S4o.oo $80.00 $20.00 $40.00 COMMISSIOI' 6-0. Discus followed regarding fees for schools using Woodland Trails Park. C( er Dave Anderson stated that he did not feel that charging a fee to local school was unreasonable, but felt that since the City already receives DAVE ANDERSON SECONDED THE MOTION. THE MOTION CARRIED Park & Recrealion Commission Minutes February 9, 2000 Page 4 9.C.2. 9.C.3. 9.B.1. The Commissioners expressed their support for the project and agreed that fin details could be worked out with staff. COMMISSIONER KUESTER MOVED TO APPROVE THE CONCEPT FOR THE DESIGN PROPOSED BY JERRY PALMER FOR LIONS PARK. COMMISSIO! SECONDED THE MOTION. THE MOTION CARRIED 8-0. tORIAL WESTRUM Trott Brook Farms Park Steve Wensman explained that the city has agreed dedication money for park development in the first Steve reviewed the amenities and cost estimates Wensman noted that the shelter could be park shelters have been established. $163,598 of park of Trott Brook Farms. ~sed for the park. Mr. when design standards for Commissioner Reitsma stated that he dimensions of the fields and like more information regarding COMMISSIONER WESTRUM THE PARK IMPROVEMENTS ANDERSON SECONDED TH Reitsma opposed. TO RECOMMEND PROCEEDING WITH BIDS FOR BROOK FARMS PARK. COMMISSIONER DANA ~OTION. THE MOTION CARRIED 6-1. Commissioner Steve Wensman he will provide details for the improvements at the March Park &Recreat Commission meeting. Master Review Plan - Hillside 8th Park St* Wensman reviewed a video of city parks located east of Highway 169 and of County Road 12. A. Hillside 5lb, Hillside 8th and Hillside 9th: (These items were considered jointly.) Steve Wensman reviewed the concept plan for Hillside 5th Addition Park which was previously approved by the Commission. The plan includes a play structure and full basketball court. Mr. Wensman explained that Riverside Development has prepared a 2.21-acre concept park plan for Hillside Estates 8th that includes tennis courts, a basketball court, a tot lot, and parking. He stated that these amenities are redundant with those of Hillside 5th park. Staff believes that Hillside 8th is a better location for the proposed amenities and suggests that Hillside 5th be used for a natural area with a prairie restoration with paths and possibly a picnic shelter with tables. Mr. Wensman noted that the two parks along with the power corridor and trails, could function as one larger park complex. Mr. Wensman stated that the developer has asked if the city is interested in acquiring Outlots A, B and C. The Commissioners were in agreement to not accept Outlot C, which contains a large retention pond. Park & Recreation Commission Minutes February 9, 2000 Page 5 Commissioner Peterson expressed his concern that the developer's park proposal for Hillside 8th is not at all what the Park & Recreation Commission previously reque, sted. Commissioner Westrum asked if the Commission was giving up their previous request by accepting this proposal. Mr. Wensman stated it was true that this proposal is not what the Commission requested, but it is a compromise utilizing the flat open area that now exists rather than a hilly wooded area. Commissioner Kuester felt that connection of the two park areas by trails makes some sense. Discussion followed regarding the Commission's previous recommendation for a park in Hillside 8th which included 5 - 6 acres with some usable flat area, accessible from the street and not tucked in behind residents' backyards. Commissioner Dave Anderson stated he did not support a park in the vicinity of the power lines. Commissioner Olson felt it was a good idea to have separate areas for smaller children and older children to play. Commissioner Reitsma asked for input from the Hillside residents in the audience. Maria Brown, 19605 Wilson Street and Ann Johnson, 19609 Wilson Street, were in agreement they liked the flow of the two separate park areas. They felt the play structure should be located in the Hillside 5th Park. They were opposed to play areas in the power line corridor and stated they would not allow their children to play there. The Commissioners and staff discussed the constraints of the park site which was previously recommended for Hillside 8th. Discussion followed regarding the possibility of combining lots 36 and 37 with the park area proposed by the developer for the Hillside 8th Park, to increase the size of the park. It was the consensus of the Commissioners that they wanted a five acre park as originally requested. The Commissioners generally agreed they could accept the park location proposed by the developer, it Lots 36 and 37 were added fo increase the size of the park. They did not support having play areas located under the power lines. The Commissioners agreed to support acquisition of Outlots A and B, but that minimal credit would be given to the developer, since the property was not usable for active play area. B. Deerfield 4: Steve Wensman reviewed the plans for Deerfield 4Ih Addition Park. Improv~9.~¢~*'~ include park boundary markers and park identification signs,~~and fence along the property line at Dodge Street to preve~liders from crossing the road, herbaceous plants around th~.e~j;~4~J'~re of the pond and shrubs along the road, additional play?,~~~pper basketball court to sand volleyball to a full court basketball. E1 iver Date: Police Department Memorandum Michele McPherson, Planning Director Thomas D. Zerwas, Chief of Police '~ ..... Bruce West, Fire Chief f~ ~/1/ , January 9, 2001 ~J~fffV~ ~)/ Subject: PRELIMINARY PLAT FOR HILLSIDE ESTATES EIGHTH ADDITON It has been brought to our attention that residents who live on Dodge Street, just south of the proposed Hillside Estates Eighth Addition, are requesting that Dodge Street be a cul-de-sac. Their request would create two (2) cul-de-sacs; one (1) at the northern edge of Hillside First Addition on Dodge Street and one (1) at the southern edge of Hillside Eighth Addition on Dodge Street. Both cul-de-sacs would more than likely butt up against each other. From a public safety perspective, this doesn't make sense. As we indicated on Auburn Street several months ago, if it were a cul-de-sac, response time would be increased if public safety officials were south of 196th on Auburn and had to drive all the way around via Highway 169 or Evans Avenue for an emergency. This same scenario would hold tree for Hillside Eighth in regards to Dodge Street. We would recommend that the City, with input from City Engineer Terry Maurer, consider the placement of traffic calming barriers or use of other traffic engineering methods to deal with neighborhood concerns. This recommendation may not sit well with some individuals. However, we must look out for the "public safety" of all of our citizens. If you have any questions in regards to this memo, contact the police or f~re chief. TZ/kma 13065 0r0n0 Parkway · P.O. Box 723 · Elk River, MN 55330 · (612) 441-2324 · Fax (612) 441-8937 January l5,2001 Elk River City Council Members City Hall Offices Elk River, Minnesota Dear Council Members, The purpose of this letter is to urge each of you to please vote NO to the proposed plat for Hillside Estates Eighth Addition that is being developed by Phoenix Enterprises. The residents of Dodge Street believe that there are a multitude of reasons why this plat should not go forward as is currently proposed: c~ The existing Dodge Street is inadequate in size to handle increased traffic flow c~ The intersection of Evans Street and 193rd, while already dangerous, will be an enormous traffic hazard, as well as a liability. c~ The proposed location for the park is extremely poor. It is in the middle of wetlands and under power lines that have not been proven safe to be used in this manner. C~ There are 21 conditions on record with the Planning Commission regarding this plat. We believe that number is excessive, and therefore not thoroughly thought out or well planned. Residents met with Daryl Thompson, the developer and our former City Council member. Alternative plat drawings, plat changes and other possible solutions were discussed, with little progress being made. The residents of Dodge Street have met with both Mayor Stephanie Klinzing and City Council member Louise Kuester. Both of them have stated to us that they will vote against the plat as it stands today. We, the existing Dodge Street residents, would like you to do the same. At the January 16, 2001 City Council Meeting, please vote against the plat for Hillside Estates Eighth Addition. Send this plan back to the developer to be re-drawn with the city and it's residents' best interests in mind. Thank you for your time and thoughts regarding this matter. Sincerely, Bill & Audie Gutzwiller 19388 Dodge St. NW Petition Supporting Rejection of the Preliminary Plat for Hillside Estates Eighth Addition We the undersigned people of existing. Hillside Estates Additions, citizens of Elk River, MN, unanimously oppose the preliminary plat presented by Phoenix Enterprises, Inc. and approved at the DeCember 27, 2000 Planning Commission meeting. Signature Print Name Address 57- ~¢v/ Petition Supporting Rejection of the Preliminary Plat for Hillside Estates Eighth Addition We the undersigned people of existing Hillside Estates Additions, citizens of Elk River, MN, unanimously oppose the preliminary plat presented by Phoenix Enterprises, Inc. and approved at the December 27, 2000 Planning Commission meeting. Sic mature Print Name Address Petition Supporting Rejection of the Preliminary Plat for Hillside Estates Eighth Addition We the undersigned people of existing Hillside Estates Additions, citizens of Elk River, MN, unanimously oppose the preliminary plat presented by Phoenix Enterprises, Inc. and approved at the December 27, 2000 Planning Commission meeting. Signature Print Name Address