T0: N[~RTHSTAR ~l~aJ~T LEAa~S AND STAKEHDLDE=IBS
FR0~1. ,1DNATl~AN BLAICI~, PI~I~LIG INIroRMATI~N DO~DINATOI
~ATIr: V~I~DNESDAY, APRIL ~3, X908
SUBJECT: N~RTHTARC~NSTI~uGT![~N UPDATE
This week, work continues on the Light Rail Transit ~LRT} connection in downtown l1~Inneapn[is,
the Vehicle lvlaintenance facility ~VMI~} in Big Lake, and commuter rail stations in BIg Lake,
Anoka and coon Rapids details an upcoming canstructiQn activities are included below.
~r~TO~rN IUIINN~AP~~.~s ~- LRT CDNN~cTIDN
construction crews will be pouring rnedians and curbs on the south half of the ~`~ Street
North bridge over the BNI* #raln tracks. The south half of the bridge is being prepared
for exclusl~re use by the Hiawatha LRT line.
[ectrical work beneath the ~~~ Street North bridge aver the BN1~ tracks will conclude
this week.
crews will be doing rebar work on the deck of the south half of the 5~~ Street North
bridge aver 1394.
Soil correction war[c at the site of the downtown commuter rail #atlan continues.
pedestrian access to the southwest sidewalk corner at k~ Avenue North and ~~~ Avenue
North will be closed la#er this week. brews wilt besetting up traffic control far the future
removal and reconstruction of the sidewalk.
CITY DI f~~?N RAPIDS ~ Ni~Ri H iAR TATIDN R~VRDA~. PARS{-ANA-Rlp~
canstructian of a temporary parking surface Immediately to the narfh of the Riverdale
perk-and~ride is scheduled to begin Later this week. This additional an-site parking will
help r~Itigate the loss of parking from cons#ruction staging and ac#ivities.
~ur~rey work is scheduled to begin in early IUlay on the southwest side of the BNF train
tracks. This work is being done to prepare far canstructian of a maintenance access
rand between ~ ~19`~ Avenue and the area across from the Riverdale park~and*rlde lot. Al[
access road work will take place within BNSF rlght~afRway~
CITY QF ~rND~fA- ~~RTHTARaTAT~4N ~~HN~N STREET ANa ~~~ Av~NUE
Site preparation and clearing and grubbing work began last week.
Trucks will be hauling materials across 4'" Avenue toward the site of the future Nor#hstar
cornrnuter rail s#ation~ Than are no anticipated significant traffc impacts related to this
workt but motorists should be watchful far trucks and heavy equipment in the area.
brews may begirt canstructian ac#ivities an the west end of `~ Avenue as early as this
week. Howeverr access to ~~~ Avenue buildings will be maintained throughout
canstructian.
CITY (~~` ~I LAKI~ ~- NaRTHSTAR STATION I~wY ~~ ANI7 aUNTY RIB 43 AND VMC~
4 Temporary fencing has been installed at the Big Lake commuter rail station site.ll~ork
on the platl'orrn and parking area will continue this v~reek.
Interior piping end ductwork installation will continue in the IJMF.
If you have any questions or concerns regarding the Northstar pra~ect, please contact danathan
Blake a# G5~~3~fi-840 ar by e~rnail a# ionathan.blakea.rnnrai[.org or visit Norths#ar online at
www, mn-etcnBoard.car~t.