Loading...
INFORMATION #3 05-05-2008INFORMATION tciver MEMORANDUM TO: Lori Johnson, City Administrator FROM: Jeremy Barnhart, Planning Manager DATE: May 5, 2008 SUBJECT: Aldi's Screening At the April 7 Comxil meeting, Councilmembex Gumphxey questioned the status of the screening fox the Aldi's grocery store. Sincc thcn, I met with the developer, Hempel Properties, questioning the status. Based on this meeting, the screening is custom made and has been delayed at the factory. Hempel believes the screening will be installed the week of May 12. If it is not installed by then, Hempel is prepared to install temporary sexeetung which will need to be designed and fabricated prior to installation. The temporary screening will be completed by May 30. Hempel Properties understands the Council and neighborhood frustration and would like this xesohed as soon as possible. ®®"" 9704 ti3RD AVENU_r- Nc~n~rH, BUITF_ 20D r,^~ ~ py ~ ~ IVi,41'l.C-. Giiri\+E, ~N+INN[Sp7R 553f>~3 ~" 763.383.7'100 April 29, 2008 City of Elk River Atfn: Jeremy Barnhart 13065 Orono Parkway Elk River, MN 55330 RE: ALDI Food Store -Elk Ridge Center 3 RTU Screening Dear Jeremy: We appreciate your time last week to meet with us and walk through the issue regarding the Aldi Food Store. As you are aware, we have four roof top units on this building -three standard units and one custom unit. This particular custom unit, which is a custom refrigeration unit specific for Aldi stores, requires a custom made screen. This custom made screen has been the culprit for the delays in the delivery of the. screens. The screens, which are being manufactured in Canada, were ordered last winter. We expect delivery of the screening in early May. Foryour information, I have also attached a letter from VSI Construction (General Contractor) explaining the delay and installation in more detail: 7040 Lakeland Partners, LLC &VSI understand your frustration and are confident the above issue will be resolved by the end of May. We hope the City will understand our situation with the supplier and give us an extension until the end of May to get this resolved. We want to apologize for any inconvenience this may have caused and want to thank you and the City in advance for your time and understanding. If you have any questions or comments, please feel free to call me (763.398.4233) or email me (imcoherson anhempelorooerties.com) at anytime.. Sincerely, / ~ ., ;, ..;t~~ ,~' ~~ ~ ..v ~~._~ 9Joe McPherson Project Manager nstriui~g Inc. Solutions Built with Valua, Service & lnlegrity" d 11751 Troy Lane Mort Maple Grove, Minnesota 5536 763.493.3000 office 763.428.3954 fe 877.493.3001 Io0 fre EMA1L xsE i i<n iruaiym..em WEn SITG envU:~wiinc.tpn'~ Date: April 29"', 2008 Jeremy Barnhart, Council and City Administrator, Re: Roof top screening ak the Aldi lacatian in Elk River It is with great regretthat I need to write this letter. Our intentions were to have this issue resolved, as I know you wish it was. The information that we are receiving from our secondary subcontractor is that the screening for the Aldi location in Elk River will be shipping around May 0Th, 2008. We have received many different dates from our subcontractor and have made arrangements, not only to track this shipment, but to have installers standing by to achieve the installation as soon as the product arrives. If for some ~easoh we see this shipment being delayed yet again, we would like to suggest a temporary screening,. if necessary, to secure the Aldi store status of remaining open. Wifh this plan, we would start the instal[ of a temporary screening on the 19`" so that we are completed with the temporary screening by the 30th of May. This temporary screening would be of material that can be easily instaNed and disassembled without compromising the roofing. To achieve this goal, the temporary screening would need to be attached in the same manner as the .permanent screening would be installed. By attaching to the screening to Roof top units themselves. In closing, we at VSI wouldlike to extend to our most sincere apologies, and will continue to do whatever is required to resolve this matter in the timely fashion possible. VP of Corporate Operations VSI Construction, Inc. 612.919.4754 bround s@vsiconstruction.com An Equa! Opportunity Employer/Oontroetor