6.2. SR 05-05-2008REQUEST FOR ACTION To Item Number Ci Council 6.2. Agenda Section Meeting Date Prepared by Public Works Ma 5, 2008 Tex Maurer, Public Works Director Item Description Reviewed by Resolution Accepting Bid and Authorizing Execution of Lori ohnson, City Administrator Contract in the Matter of the Jackson Avenue/School Street Reviewed by Intexsecdon Improvement Action Requested Adoption of the attached resolution accepting the bid and authorizing the execution of the contract fox the Jackson Avenue/School Street intersection improvement. Background/Discussion The City Council authorized the advertisement fox bids at your March 17, 2008 meeting. Bids were opened on Tuesday, April 15. There were a total of five bids received. A copy of the bid tabulation is attached and the following table lists the five bidders and their total bids. Bidder Bid Amount W.B. Miller, Inc. $110,977.17 Desi Electric, Inc. 113,406.00 North Valle ,Inc. 116,118.18 Forest Lake Contxactin ,Inc. 118,168.99 Haxdrives, Inc. 120,447.03 As a xexnuidex, the improvement includes adding left turn arrows to southbound Jackson Avenue and westbound School Street. In addition, it includes adding a right turn lane fox southbound Jackson Avenue. These improvements require the moving of the signal pole in the northwest corner of the intersection, along with the control panel at that location. An easement was necessary from the School District to facilitate the construction of the right tum lane and the moving of the signal equipment. The easement has been received from the School District. It is impartant to note that the existing signal will be out of operation fox a few weeks as the improvements axe completed. During that time, the intersection will operate with afour-way stop sign control. To obtain a cost, we bid as an alternate, a temporary signal system in lieu of an all- way stop sign control. The alternate bid cost is $23,500. We believe the intersection will operate safely and effectively duxuig construction with stop signs; therefore, we axe not recommending the award of the temporary signal system. W.B. Miller, Inc. has previously successfully completed similar projects in the City of Flk River. Therefore, we would recommend award to them as the lowest responsible bidder. School Street/Jackson Avenue Intusecnon Improvement Page 2 May 5, 2008 Financial Impact The 2008 Capital Improvement Plan (CIP) has earmarked $350,000 fox the total project cost at this intersection. Based on the low bid, the previously ordered signal equipment in the amount of approximately $17,000 and the expended and estimated overhead to accomplish the project, it is anticipated the total project cost will come in between $180,000 and $185,000, well below the programmed CIP amount. Attachments • Bid tabulation • Resolution Accepting Bid and Authorizing Execution of Contract ACtIOn tifotion by Second by Vote Follow Up 5:AF,r~ineerlmpxovYxojA2008Impeovemenc &ojectsASchod SFJackson Ivte~secriovAUS OS U8 cc memo.doc --M CONSULTMG ENGINEERS, PLC SCHOOL STREET AND JACKSON AVENUE PROJECT N0.226073 E7D TAEULATION INTERSECTION IMPROVEMENTS ELK RIVER. MN mnTRACrrreMS ITEM. SPFL RBMRIw,IIiP. Iluign EledviStne. Nash Valley,Inc; ForeSf Lake C Onfraafing, Ina Ihrdr ivq Tnc QlK ND. NO. OBSCRIPf1pN. S1Nff TOTAL UMT TOTAL LINK TOTAL UNLT TOTAL UNR. 'ryYfAL. UNR T P9ECE ERLCB YBWE hR[CE PRICE TNC6 PRICE PRICE Y81CE OTAL PH1CE $CHEDIILE I.O-STREET 13011.501 MOBILIZATION LS LO:~- ! EIOOW 00 EIO WD00 513.850D 513 A50.3] 511 OD EI2 O.Bp SS 500.00 SS SN.00 SIS 9M.g0 SI399a q0 3 3104501 REMOVE CONCREIECURE AND GU]TER. _ __ __. LF 2B4 y '. A.W 5853.00 5341 E96B.14 5349 S8J)56 W.W SI ll6.W 5335 E951M 3 210iSOL OBLITERAtB PAVEMENTMARKMGS LP I@E~ $D42 E]E3 24 5005 ET)490 . I9R SB95 q4 10.50 586100 5043 E]4D46 a 21 W,505 REMOVF.HITIRAMOUS PAVEAlENf 4Y 183'-~ " 55,00 592500 fq.]3 $81505 fg.W E14BRW 5400 S]qO GD d3.4] 3691.95 S 11W.505 REMOVE CONCRETE WALK Y 19]]; r~ 1030 Mg8.5D E06B 11340.36 SI,D3 fE W6.31 30is 51483]5 50.54 SI MZ58 6 3109309 REMOVE DRAMAGE STRUCNRE EACH IE ~ 5300.00 53W.M 19]250 fgR50 551500 ESIS.OD SW000 SIW.00 133901 5339.83 ] 21 M 509 REMOVE SIGN EACH 1:' : II500 #500 131 ]S 531 35 . ___.._ _ __ _., .. ; . 130.90 51090 E30.W $]O,W 53339 53339 8 RIWStI SaW CUYHITUMMW3 PULL pEPTN LP 2Mj{ e 5350 551000 f19d $395]6 19,50 1910A0 E3W 161200 5384 5660.56 9 210451] SAW LLTCONCRETE(MLDEPTHI LF 184ti ;~ 5500 SWW 59,20 5]560 f9& 369A8 55 00 SWOD h . 54-)2 AD6 10 11M.52] SALVAGE ANDREMSTALl51GN PANEL - EACH _ I F . EIIS.W SHSW SI]R65 5130.63 f@8 ]5 51]8]5 513500 EID W 513496 513496 U 2_IDS_535 - fOP501L BORROW LV) ~ ~ Cv ]8 3 y SIO W RB0.00 8635 d]35W 53000 EBaD00 535 W b9&10D 51948 554541 I2 30.11,501 gGGREGA3E0ASECLh445 TON 255 S SI5.00 j]8E500 51943 fd 934 65 5493 fl ]6113 51100 _ . 52805.00 51335 5]404.35 I] 22]2.501 MW.BITUA9110US SURFACE 1.5' SY 150 i " 56.00 S9WW SS S 1]8]50 11)35 5198]50 f9 W ~ , . . 51 ]SOW 50.]1 fl ]06.30 14 3350.501 TYPEMV4 WEARCOURSE MIXNRE TON 9R ' % 5110.00 £63]000 58885 55061 45 93380 5534660 EB] W 3 , . . fq 959W SB]IS Eq 96]35 IS 23505W TYPELV]NON_WEARMG CUVRSE MI%NRE - TOH --- SS ~i ~ % E103W ~ 5561000 $0803 §4886.]$ 59100 SS ODSW SB100 Eq ]85.00 fY1.BS §40M,I5 16_2]0.503 BITUMINOUS MATERIALPOR TACK COnT pqL , 29{q a j500 514500 5535 515225 55.W fIIS.W SL66 55]91 55.65 516185 I'i 25033x1 12'RC PIPE SEWER DE$]006iLV LF B~I S Sa625 I)]U W E]B ]3 563000 §1E3W _ . 59BBB0 fIW.W- SWD00 SB0.96 SWL04 IB 3501.603 CONNECT TOIXI3TMG DRAMAGE STRUCIIIF£ E4CH I E1P9.00 S3WW 526250 SE63W f024.W 5634.M SE00W MW.00 SI DN66 S1 tl19.66 I9 250G50E CONSTDRAMAGE ST DESIGN SPECIAL 54'X]6" FACH E9W W f900 W SI ]1250 131 5 _ . _ ~~ . . 0 5 2 f1 B5600 51859W 52.000.00 E20W.W SI Td]C6 5192].96 20 2506516 CASTMG A$$EMELV R-IB01-E EACH 2 F e f950.W EI SYI000 11155.00 E231DW E1133W S 26600 SIOWW S2 W - O.W EI 18].63 jE 3)5.36 21 350G533 AONST FRAME ANDROID CASTMG STORM EACH 1~~ E35D00 #SOW 51600D 5160.00 5300W ESN.00 E]5W EI5.00 EEr9D9 88909 33 25066@ ADNET TOP SLAB fETORF51 EACH 1~ ~ W00 00 &OO W 5]0150 5 , . . ]0].50 b61B00 j618.W KOD00 EWO.M SI O'19.66 SI O)966 D 3521501 4"CDN_CREI£SIDEWAL%___.__„ _.__SP 1448 ~ 5265 3q 69]10 1256 54]3088 53.58 S4 ]6]g4 53.50 468W 52]0 5498960 JA 25]1501 CONCRETECURB ANO GVtIER B616 LF A 269 ~y ~ I12]0 53308 J0 EI3g3 5;61]6] EI205 f) 41 d5 f12C0 532E%00 I 36 . E 4 SJ 86281 33 25315]2_ _ PEDESIAIANCURE RAMP TRIINCATEDDOML$) EACH 1 ~ 525RW 5550.00 S41gW b41RW f30GC0 5306W ESP].00 §SWW 52]855 53]855 26 2563601 TRAFFIC CONTROL IS L0~ # OW 525W.W SE OSSI.W E305d.W 53060.00 E3 MOW 525W00 52500W 3215933 j215g 33 29 2564.331 F6:I SIGN PANFLTYPEC ff 3LB C~ $39A0 51096.20 558]5 II OB695 f3P3) SI OhLB9 52]50 _ 110)9.50 EE469 51 125.38 20 2564 602 PAVFlAENI ME3SAGE(IEFTARROWI WfR(ll54) FACN 4 ~ LI500 W60 00 fI15 W W6D00 5 . . . 2585] 51034.12 f251W f1004.OD SII&]6 Eq]5.04 29 3564 6(Q PAVFAffM hff33AGE HRU ARROW WHI 3354 EACH dT4 - S115W H6000 E1150D E4W 00 b299 '/ . S S . . 1 b1198.93 829100 SI I61W EIIB]6 Sa]504 30 2561.602 PAVEAORfI MSSAGE {RIGHT ARROW WHT(53543 EACN_ 3 5115W R30.OD 511500 IIiW10 HI58.53 f51].C6 R9.W f502W SI IBTI I33]Sq 31 2561 bD2 PAVCMENT MP SSAGE ffHRUIRICiHfI WHT(])S4) EACH r : 2RB SIBD W f36RW SIB3 8B 5]65]6 $]]I kt . . . . 114366 E)6L00 S]d2W S38A 94 E3]].BB 33 25W.E03 4'DOUEL£SOINYELIgW-EPOXY ~ 426~ 11.13 546990 11.15 5459.W ED62 5364 13 mW S255W - 33 2561 503 4"901IDYELLOW -EPoXY LF 48151 50 56 SE]890 q1 W 5388 W 5041 , 51.19 f50G91 . . . . b21164 &1.P3 530683 5059 5203]9 N 2561.60) d",m1.Ip YEl1AW HATCN AREAS=FXIXY___ _ __ LF 2321 5190 SIW.W SI SB 59)616 5300 E696.W $293 E6T44 519P 5 $450G8 35 3K4.60I 4"$pI.ID WHITE-EPOXY LF ~3 ~" ~. fD.58 E343W 1060 5355 BD (O.W Y36093 E0q) S2WW 50.59 §)49$] ]6 3564.603 9"WIQTEW SK@ EPOXY _ _ LF _ _ ISg S"fi ~.:, 0.0,32 1114.56 SD32 511156 93,44 E15)R E0.4J 515399 I032 111456 3] 2564 601 N'SOLID WHf1E ISTOPBAR)-EPO%Y LF 135 [~: 0.525 510%]5 35 55 590895 56 18 . . . . SB3d ]0 jb UO EBIO.W 55.40 5]39.00 IS 2364 618 2'X6'ZEBRACROSSMO WHILE-EPOXY SF ]]4 ~"' S3 W f2 ]0610 5161 52]94 14 5 0 . . . 3 9 5239166 8.W 53333.00 53"2 E2 gN2g I9 35]3505 SRi FENCETTPE: MAC3RNE5LICED LF 200•'{ E2.W HOOW Y1 63 5926 W 51 58 AI600 _ _. ___ _ _ _ . . . F3,35 563000 5540 81,OBOW Page 1 BDM CONSULTING ENGINEERS, PLC SCHOOL STREETANO JACKSON AVENUE PROJECT NO. 2260"!3 B]D TABULATION INTERSECTION IMPROVEMENTS ELK RIVER, MN COM&ACCffEMd R'B MitleS ivr. ITuigR F,Ia.IrIS Ine .North Vag6y,lnu PomtLeke ContruXng, GC. Nerdrivn, Inc rrzM SPEC eTV. NQ. NO. -%$C®PrIOX iMR - TOTAL .UNIT 'E(IEAL UMT T(YEAL UNIT TOTAL UNIE 'S(1'SAL UNR 1'DEAL PAICe ~PB1CE PWCE PRICE PHIC6 PRICE RRWE P&[CE PRICB PWCB 40 285.553 SEEDBLANI(Ef FERTIL¢ER_ __ _ ___ _ _ ST 512; 5300 E1960D b2El E113LR SL65 5544&2 $1 ]5 589600 ffi]D 51 AE.40 41 $PEC_ _ $TANOARDPROCNRf$UBGRAOE) EACH I..~-. 59500 $950D E99E5 $9925 599.]5 599 ]S !95.00 E95.DD 5102.51 SIDES] 42_ _ $PFF MPLACE DENSITY&MOISNREf411EORADEI PACH 2'.~ 550.00 510000 55325 !100.50 55150 5105.00 ESOW $IW.W §5] 99 EIOt 95 49 SPEC ORAOATIONfCLA5851 _ __L'AGT! 1, , SIDS.W 510500 5109,]5 5109]5 511025 8110.25 !10580 EIOS.W fll]9fi b11336 <6 SP6C BTANDNN PROCTOR (CW5951 _ _ - PACH 1 !105.00 f105W 5109]5 5109.]5 5110.23 511025 SIOSW 5105.00 511136 5113.36 95 SPEC _ MPLACE OENSITYRMOISTUREfCLA$$ 51 EACH 2j~ SSDOD $ILtl.W ES]25 5104.50 552.50 510500 SSOW fILb.00 b5] 99 SID]99 46 SPEC CONCRETE TESTMO CARE kGUITER EACH Vi 1 '- 511500 E115W E~H.2A 89918 5120 ]S $120]5 §9500 MS.W SIDE SI 5102.5] 4]_ SPEC CONLROTE TEST NG $IDP.WALK) EACH 1(t:. 5115.00 511500 512020 512010 1120 ]5 5150. ]5 511500 511500 5124.16 5121.16 OS SPEC RJPLACE OEN9IIY&AIR VOIDS fBITUMINOVS) FACH_ .4 I~g;. $IISW 511500 5110.50 515010 !120]5 511D95 SIISOD 511500 9124.16 E121.t6 ff T PCNEUIILE A-4r&EEi-lUTAL ?' ESi,2W.1] 565,159.00 5633025] E36168.M 565,083.16 !: SCHEDULE 20-SIGNAL SYSTEM ~~5' ~,.Ci ' 69 5365.616 REVISESIGNAL SYSTEM __,___.._ FACII 1 n' ES]T1.00 553 T.W 551 T1.00 §512]]00 ESE915JI 55581531 $52WD.Po S62WO.Po ESS l61.B] $55361.8] '( $CHED-LE 20-SICNALSYSTEM-TOTAL f51,]T/.W f51,2T,W f52BIS31 S62,OW A0 555361.9] t . ee~ (( SCI 8011(b 3.D-AI.TCRNAT%%ID I`'-. 50 - SPEC TEMPORARY SIGNAL 4YSTEM LS 1~ '~`. 523 OOCO fE350D00 523 M.00 523 00.00 !5399900 523 W9.M §4 OOO AD HAM000 525156.14 555156.14 1 i . T D111 F'.10-ALTPRNATE 6ID-TOTAL . E21500.W .SE3300.W 123,999.00 E4A,OW.OD 553.156.14 ~i RID DA565UMMARV !SCHEDULE 1045CHEOIILE2A1 ~ 5110,9]].Ii 5115,406AD 5116~11fl19 511&169.99 SI3oA4i.o3 ~` r~. fG SCHEDULE IA~9TREET-T(YIAL ~ ?. ES],2W.1] j6E,129.W 163305.8] 556,16993 $65,08516 $CIIBDULS I.O-$IGNALSV5P%M-TOTAL [~ [ L~. 533 T2].W f51,2Y1.LO 552915.31 $62,OLO.W 555,3618] l SCHEDULE 3.0-ALTERNATE BN-TOTAL ^r dE3.9M.W SEJ.]OO.W 823,999.00 5q8 W0.[0 555,156.16 ~'. 'f T ARY-T TAL .'+~ SISMT.1] f156,]06.OD SIN,11'I.IB $]66~16R99 $]45,603.1] Pace 5 RESOLUTION 08- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE JACKSON AVENUE/SCHOOL STREET INTERSECTION IMPROVEMENT OF 2008 WHEREAS pursuant to a City Council Resolution 08-20, passed at the March 17, 2008 meeting, competitive bids were solicited and received Eor the Jackson Avenue/School Street Intersection Improvement and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and determined that W.B. Miller, Inc. is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED by the Ciry Council of the City of I;llc River, Minnesota: 1. The Mayor and City Adtninistratox axe authorized and directed to execute, on behalf of the City, such contract with W.B. Miller, Inc., as is approved by the City Attorney, for the completion of the Jackson Avenue/School Street Intexsecdon Improvement according to the approved plans and specifications designed by City Council Resolution. 2. I'he City Administrator is authorized and directed to forthwith retuen to all bidders the deposits made with their bids upon execution of the contract specified above. Passed and adopted this 5~ day of May, 2008. Stephanie A. Klinzing, Mayor ATTEST: Tina Allard, City Clerk