4.6. SR 03-19-2001 Howard R
, Green Company
Item
4.6
March 13, 2001
File: 812420J-0030, 0564
Honorable Mayor and City Council
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330-0490
RE: DOWNTOWN SIDEWALK REPLACEMENT PROJECT
Dear Council Members:
As you are aware, the public headng and assessment headng for the Downtown Sidewalk
Replacement project are both scheduled for Monday evening, March 19. Attached for your review
is another copy of the bdef feasibility study that was prepared for this project. I will be prepared at
the public/assessment headng to make a brief presentation on the project and then answer any
questions the City Council or public may have. In order to preserve their right to appeal the
assessment, the property owner must submit a written objection to the Mayor or City Administrator
at or before the assessment hearing. Simply voicing any objection at the assessment headng
does not constitute an objection.
As you are aware, staff held an informational meeting to discuss this project on Thursday, March 1,
2001. At that meeting, both business owners and property owners were invited. There was a very
small turnout for the hearing, and very little discussion was sparked by staff's presentation.
Attached for your review are a sign-up sheet and minutes of that informational meeting. Those in
attendance did voice a preference for an eady construction schedule pdor to the Art Soup
celebration.
At the close of the public hearing and assessment headng, the Council has three resolutions for
their consideration. Copies of all three are attached. The first resolution orders the improvement
and the preparation of plans and specifications. The second resolution approves the plans and
specifications and orders the advertisement for bids. According to our schedule, bids will be
opened on Thursday, Apdl 12, and be available for the City Council's consideration on Monday,
April 16. The final resolution for the Council to consider is a resolution adopting the final
assessment roll.
If there is anything specific you would like me to present Monday evening, or any questions you
have prior to the meeting, please call.
Sincerely,
Howard R. Green Company
Terry J. I~ra~rer, P.E.
TJM:tw
Encs.
O:\PROJ\812420j\0030\Ltr 03-13-01 Council.doc
1326 Energy Park Drive · St. Paul, MN 55108 ° 651/644-4389 fax 651/644-9446 toll free 888/368-4389
Project No. 812420J-0325
FEASIBILITY STUDY
FOR THE
DOWNTOWN SIDEWALK REPLACEMENT PROJECT
CITY OF ELK RIVER, MINNESOTA
812420J FEASIBILITY
Howard R. Green Compar,
Project No. 812420J
Feasibility Study
City of Elk River
FEASIBILITY STUDY
DOWNTOWN SIDEWALK REPLACEMENT PROJECT
ELK RIVER, MINNESOTA
FEBRUARY 2001
I hereby certify that this Plan, Specification, or Report was prepared by me or under my direct
supervision and that I am a duly licensed Professional Engineer under the laws of the State of
Minnesota.
Terry J. Maurer, P~.
Reg. No. 15316
Prepared by:
Kristina Thompson, E.I.T.
Date
Date
812420J FEASIBILITY
Howard R. Green Compan.
Project No. 812420J
Feasibility Study
City of Elk River
1. INTRODUCTION
m
This feasibility study is authorized by the City Council with the adoption of Resolution 01-
06, passed on February 12, 2001. The scope of the feasibility is to consider the
replacement of the downtown "red" sidewalks with concrete pavers. This report will
briefly discuss the proposed improvements, estimated cost, provide a method of
assessing a portion of the project, and provide a schedule for completion of the project.
Resolution 01-06 authorizing this feasibility study was adopted by the City Council based
on a recommendation from the City's Housing and Redevelopment Authority (HRA).
PROPOSED IMPROVEMENTS
The replacement of the downtown existing "red" sidewalk has been discussed for
several years. Two things have occurred which make it appropriate to consider the
initiation of this project in the summer of 2001. First is the redevelopment of the
northwest corner of Main Street and King Avenue. The second item is the desire by the
Elk River Municipal Utilities to bury conduits and electric wires in the downtown area.
At several meetings, the City Council and/or HRA have discussed various options for the
replacement of the downtown sidewalks. It was concluded that all of the "red" sidewalks
should be replaced with a similar concrete paver style as chosen by the development at
Main Street and King Avenue. That development will be replacing the sidewalks on both
sides of the new building with a concrete paver that is of a cobblestone style in a random
pattern with three different size blocks, those sizes being 3' x 6", 6" x 6", and 6" x 9".
The color chosen by the development is Autumn Blend. Exhibit 1 shows what the
random pattern style will look like using the intersection of Main Street and Jackson
Avenue as an example.
In addition to replacing the "red" sidewalks in the downtown areas, it is also proposed to
replace sections of concrete curb and gutter which have been damaged over the years,
replace sections of flat gray sidewalk on King Avenue which have deteriorated over time
and, finally, to connect the two concrete islands at the intersection of Main Street and
Jackson Avenue with the curb line to eliminate any cut-through vehicle traffic. The
project would also remove and replace all of the pedestrian ramps in the downtown area.
PROJECT COSTS
This section provides the estimated project costs for the proposed improvements.
Overhead, which includes City administration, engineering, legal, fiscal, and assessment
roll preparation, is typically estimated at 28% of the construction cost. For the purposes
of this project, that overhead rate has been estimated to be 10%, given the relatively
simple process this project will go through. The estimated project costs are as follows:
Estimated Construction Cost
Estimated Overhead (10%)
Estimated Total Project Cost
$263,700
26,400
$290,100
812420J FEASIBILITY
Howard R. Green Compan'.
Project No..812420J
Feasibility Study
City of Elk River
4. FINANCING
The project is proposed to have a small percentage assessed to the abutting property
owners with the remainder funded by the HRA. Various options have been reviewed by
the HRA and City Council for the assessment of this project. The chosen alternative is
to assess $1,500 per unit, with a unit being determined to be any parcel of property
which has a separate tax identification number. A review of the County records
indicates that there are 39 parcels in the project area with individual tax identification
numbers. Using $1,500 per unit, this means that the total assessment would be
$58,500.
The method of spreading this assessment was chosen as 50% per unit and 50% by front
footage. It was determined that there is a total assessable front footage of
approximately 2,500 front feet. Therefore, the assessment rates are $750 per unit and
$11.64 per front foot. Applying these rates to each parcel results in the preliminary
assessment role shown on Exhibit 2.
The remaining project costs will be funded by the HRA with a small portion of the cost
being paid for by the Elk River Municipal Utilities, equivalent to the cost of removing the
existing sidewalk on the north side of Main Street:
5. PROJECT SCHEDULE
The schedule for the Downtown Sidewalk Replacement project, as provided in Table 1
below, is based upon guidelines established in Minnesota State Statues Chapter 429,
Local Improvements, Special Assessments. Dates for construction may be revised after
the informational hearing.
Table 1.
PROJECT SCHEDULE
City Council orders Feasibility Study
* City Council receives feasibility study and orders public
hearing.
· City Council orders preparation of assessment roll and
assessment hearing
· Informational Hearing
· Public Hearing and Assessment Hearing
· Order Improvement
Approval of Plans/Authorization to Bid
· Open Bids
· City Council awards contract
· Begin construction on sidewalk replacement and ERMU
underground electric work
· Complete construction
· First payment due with real estate taxes
February 12, 2001
February 26, 2001
February 26, 2001
March 1, 2001
March 19, 2001
March 19, 2001
April 12, 2001
April 16, 2001
April 23, 2001
Mid June, 2001
May 2002
812420J FEASIBILITY
Howard R. Green Compan:
Project No. 812420J
Feasibility Study
City of Elk River
6. NEED AND COST-EFFECTIVENESS
The sidewalk in the downtown area is showing signs of deterioration and is in need of
replacement. The Elk River Municipal Utilities has plans to place its electric facilities
underground in the downtown area in 2001, which will require replacement of
approximately half of the sidewalk. The project is necessary to provide a quality means
for pedestrian movement throughout the downtown business district. This project
consists of approximately 30,000 square feet of sidewalk to be replaced. The size of the
project will insure competitive bidding and from this standpoint, is cost-effective.
J
CONCLUSION
Based on the information contained within this report, the Downtown Sidewalk
Replacement Project is necessary, cost-effective, and feasible from an engineering
standpoint. As previously stated, the cost will be financed through a combination of
assessments to benefiting properties, HRA funds, and Elk River Municipal Utilities funds.
The project will enhance the downtown area by eliminating above ground utilities and
replacing deteriorating sidewalk and curb.
812420J FEASIBILITY
EXISTING BUILDING
..... x, x.,
-STREET LIGHT (TYP.)
EX.
EX. TREE GRATE (TYP.)
z
0
10' WIDE BOULEVARD
MAIN STREET
BOULEVARD
EXISTING BUILDING
/
/
/
/
/
/
/
EXISTING
ALLEY
/
EXISTING
/
BUILDING
NOTE: SIDEWALK
PAVERS ARE NOT SHOWN TO SCALE
DESIGNED BY: DESIGNED_BY DRA1M~I BY: BRAWN_BY
APPROVED BY:APPROVED_BY JO~ NUMBER JOB~
CAD DATE: Jonuory 11, :~OO1 11:54:18 a.m.
CAD FILl[: 23OOOOm\exhibits~MAIN-JACK$ONB.DWG
~ 1326 ENERGY PARK DRIVE
.~"'~1 ~ ST. PAUL. MINNESOTA 55108
~~,, (651) 644-4389
~ I Howard R. Green Company
~" j CONSULTING ENGINEERS
Gl'Pt' OF ELK RIVER
COBBLE - RANDOM PATTERN
STREET AT JACKSON AVENUE
SI~ALK E4PROVEMENTS
1
EXHIBIT 2
DOWNTOWN SIDWALK REPLACEMENT (812420J-0564)
ASSESSABLE COST= $58,500.00
No. TAX ID. NUMBER Property Owner Property Address City, State, Zip Mailin( Address
1 75-404-0150 City of Elk River P.O. Box 490 Elk River, MN 55330 35.85 $1,167.29i
2 75-404-0151 City of Elk River P.O. Box 490 Elk River, MN 55330 35.85 $1,167.29
3 75-404-0152 Van Valkenburg 657 Main Street Elk River, MN 55330 657 Main Street Elk River, MN 55330 6.3 n/a
4 75-405-0110 Anthony Jarmoluk 822 Main Street Elk River, MN 55330 822 Main Street Elk River, MN 55330 60 $1,448.40
5 75-405-0130 Anthony Jarmoluk 822 Main Street Elk River, MN 55330 822 Main Street Elk River, MN 55330 60 $1,448.40
6 75-405-0140 2TLC, LLC 11555 205th Avenue Elk River, MN 55330 n/a n/a
7 75-405-0215 First National Bank 729 Main Street Elk River, MN 55330 1729 Main Street 'Elk River, MN 55330 77 $1,646.28
8 75-405-0225 Ronald & Rober Robeck, C/O Robeck's Prop. 724 Main Street Elk River, MN 55330 724 Main Street Elk River, MN 55330 32 $1,122.48
9 75-405-0230 Houlton Investment Company 729 Main Street Elk River, MN 55330 729 Main Street Elk River, MN 55330 49.5 $1,326.18
10 75-405-0235 Houlton W H Estate 729 Main Street Elk River, MN 55330 729 Main Street Elk River, MN 55330 39.5 $1,209.78
11 75-405-0240 City of Elk River P.O. Box 490 Elk River, MN 55330 40 $1,215.60
12 75-405-0245 Cyril Lenzmier, C/O US Bank 708 Main Street Elk River, MN 55330 P.O. Box 64142 St. Paul, MN 55101-0142 161.25 $2,626.95
13 75-405-0250 Conrad & Marion Johnson, Trustee P.O. Box 598 Monticello, MN 55632-0142 50.75 $t ,340.73
14 75-405-0255 Edward & Charlene Barder & M. Foster 905 Oakwood Terrace Champlin, MN 55316 30 $1,099.20
15 75-405-0260 Frank and Judy Galli 22603 159TH Street NW. Elk River, MN 55330 30 $1,099.20
16 75-405-0265 !Keith Holme ~323 Jackson Avenue Elk River, MN 55330 9923 Aetna Avenue Northeast Monticello, MN 55362 50 $1,332.00
17 75-405-0310 'City of Elk River Park P.O. Box 490 Elk River, MN 55330 280 $4,009.20
18 75-405-0320 Bank of Elk River 630 Main Street Elk River, MN 55330 630 Main Street Elk River, MN 55330 94.27 $1,847.30
19 75-405-0340 Bank of Elk River 630 Main Street I Etk River, MN 55330 630 Main Street Elk River, MN 55330 230 $3,427.20
20 75-405-xxxx Bank of Elk River 630 Main Street Elk River, MN 55330 630 Main Street Elk River, MN 55330 111.14 $2,043.67
21 75-405-0410 Robin & M Van Valkenburg 657 Main Street Elk River, MN 55330 12400 Ridgewood Drive Elk River, MN 55330 34 $1,145.76
22 75-405-0420 Michael Rafferty 653 Main Street Elk River, MN 55330 653 Main Street ~EIk River, MN 55330 25 $1,041.00
23 75-405-0430 Paul's Properties 2323 East 25TH Street Minneapolis, MN 55406 30 $1,099.20~
24 75-405-0440 ECM Publishers, Inc. PO Box 653 Elk River, MN 55330 4095 Coon Rapids Blvd Coon Rapids, MN 55433 54.5 $1,384.381
25 75-405-0450 ECM Publishers, INC. 14095 Coon Rapids Boulevard Coon Rapids, MN 55433 56.5 $1,407.66
26 75-405-0460 First Bank Maple Grove C/O U.S. Bank Corp. Prop. 2800 East Lake St. Lake Minneapolis, MN 55406 100 $1,914.00
27 75-405-0470 Laura Nadeau 612 Main Street Elk River, MN 55330 13063 183rd Avenue Elk River, MN 55330 66 $1,518.24
28 75-405-0505 First National Bank of Elk River 729 Main Street Elk River, MN 55330 729 Main Street Elk River, MN 55330 140 $2,379.60
29 75-405-0510 Houtton Investment Company 729 Main Street Elk River, MN 55330 729 Main Street Elk River, MN 55330 16 $936.24
30 75-405-0515 Jeffrey & Vicki Krueger 14512 County Road 72 Elk River, MN 55330 32 $1,122.48
31 75-405-0520 Houlton Investment Company 729 Main Street Elk River, MN 55330 729 Main Street Elk River, MN 55330 18 $959.52
32 75-405-0525 Houtton Investment Company 729 Main Street Elk River, MN 55330 729 Main Street Elk River, MN 55330 24 $1,029.36
33 75-405-0530 I Houlton Investment Company 729 Main Street Elk River, MN 55330 729 Main Street Elk River, MN 55330 14 $912.96
34 75-405-0535 Houlton Investment Company 729 Main Street Elk River, MN 55330 729 Main Street Elk River, MN 55330 20 $982.80
35 75-405-0555 Van Valkenburg Services 701 Main Street Elk River, MN 55330 701 Main Street Elk River, MN 55330 41.5 $1,233.06
36 75-405-0560 Dennis & Catherine Larsen 12700 206Th Avenue NW. Elk River, MN 55330 24.5 $1,035.18
37 75-405-0565 City of Elk River P.O. Box 490 !Elk River, MN 55330 20 $982.80
38 75-405-0610 831 Main Street Properties 831 Main Street Elk River, MN 55330 831 Main Street :Elk River, MN 55330 66 $1,518.24
O:/PROJl812420J/0564/Asmt Roll 020501
No. TAX ID. NUMBER Property Owner Property Address City, State, Zip Mailin¢ Address Cit State, Foota( ;750/unit + $11.64/front foot
39 75-405-0620 iDouglas Chapel Affiliation 19365 Lander Street NW Elk River, MN 55330 1118 N. 6th St. IMinneapolis, MN 55411-4308 66 $1,518.24
40 75-405-0630 In"an Habib 817 Main Street Elk River, MN 55330 34321 Myrtle Lane Union City, CA 94587 66 $1,518.24
41 75-405-0640 Dares Funeral Service Inc. 805 Main Street Elk River, MN 55330 805 Main Street Elk River, MN 55330 132 $2,286.48
TOTAL 2513.11 $58,500.00
o:/P ROJ/812420JlO564/Asmt Roll 020501
Downtown Sidewalk Replacement Project
Informational Hearing Meeting Minutes
An informational meeting for the Downtown Sidewalk Replacement Project was held on
March 1, 2001 at 6:00 p.m. in Council Chambers at the Elk River City Hall. A list of
those in attendance is attached. Terry Maurer, City Engineer, opened the meeting
promptly and went over the following topics: the product chosen and placement,
assessments, Elk River Municipal Utilities work that will be done in conjunction with the
project, what to expect during construction, and timing of the project. An overview of
each topic is found below.
Product and Placement - The product chosen is manufactured by Borgert. The
concrete paver sidewalk will be a cobblestone series placed in a random pattern
with the Autumn Blend color. There are three sizes of pavers that will be placed,
3" x 6", 6" x 6", and 6" x 9". The pedestrian ramps will be replaced and will be
constructed in the same style currently in place. In addition curb and gutter
throughout the downtown area and portions of gray sidewalk on King Street will
be replaced as needed.
Phil Hals, Elk River Street Superintendent, is currently investigating replacing the
existing tree grates with either new grates or possibly planters. No decisions
have been reached at this time and are dependent on budget constraints.
Assessments - The total project cost is approximately $290,000, of which
$58,500 will be assessed. The assessments will be approximately $1,500 per
unit but will be assessed based on unit and front footage. Those with one unit
and 60 feet of front footage will be assessed $1,500. Property owners with less
footage will receive a smaller assessment and visa versa. A unit is a piece of
property that has a unique property identification number. The public hearing
and assessment hearing will be held on March 19, 2001.
Elk River Municipal Utilities (ERMU) Construction - In conjunction with this
project ERMU will be burying overhead power lines and conduit. Lines that
currently feed the buildings will remain in place. If the property owner would like
to bury their individual power line it would be done at the expense of the property
owner.
What to Expect during Construction - The Sidewalk Contractor will remove
the existing sidewalk between the curb and the buildings for one block. ERMU's
Contractor will then bury the power lines and conduit within the sidewalk area.
The Sidewalk Contractor will then place the pavers on a recommended base.
The Sidewalk Contractor will remove the existing sidewalk on another block while
ERMU's Contractor is working on a different block so construction can move
smoothly with minimal downtime to either contractor.
The Sidewalk Contractor will place a wooden structure or platform from the curb
to the door while the sidewalk work is being completed in front of each business.
Disruption to area businesses will be kept to a minimum. It will be necessary to
post no-parking signs on blocks where construction is taking place. Due to
limited number of parking stalls this will be kept to a minimum.
It is still being discussed where the Contractor's will store equipment and
materials. A location will be determined that does not add to the disruption to
businesses, but is in close proximity to the construction.
Timing of the Project - The Sidewalk Contractor can lay approximately 2000
square feet of pavers a day depending on weather. It will take about two months
to complete the project with the addition of the burying of the overhead lines and
replacement of curb and gutter and gray sidewalk.
An early start date will be conducive to Iow bids and will allow ERMU to place
their upgraded lines before the extra capacity is needed.
After the introduction Terry Maurer opened the meeting up for questions. They were as
follows:
Question: Will there be down time for businesses? Response: Wooden ramps will be
installed to allow access to businesses at all times.
Question: The transformer or lines to the buildings will be left unless the owner chooses
to bury them? Response: That is correct.
Question: Can the owner of the building choose to bury their service at any time?
Response: That is correct. It was recommended that if several businesses choose to
bury their lines they attempt to coordinate the work in order to receive a lower bid.
Question: Will one block be ripped up at a time? Response: In order for both
contractors to continue to work at all times it might be necessary to disturb two blocks so
that either contractor may be working on a different block at the same time.
Question: Will the driveways be paver blocks? Response: Yes, this product has been
used for crosswalks in several cities and as street pavement in Duluth and is capable of
carrying heavy traffic.
Question: Will Northstar be adding lines in conjunction with this project? Response:
We have been in contact with Northstar and they have expressed interest in adding lines
in conjunction with the project. Every effort will be made to facilitate this in order to
prevent future disruption to the downtown area.
Question: Will U.S. West or other private utilities be doing any work? Response: We
have informed all of the small utilities of the project and notified them of the opportunity
to place additional or new lines.
Question: Where have these pavers been placed? Response: These pavers have
been placed in downtown Stillwater, St. Cloud, and Hopkins.
Question: Was the chief complaint of the old sidewalks that they were hard to shovel
and walk on? Response: There have been no claims made due to the existing
sidewalk although there have been some complaints. The new paver sidewalk will have
sand placed between the groves which should eliminate some of the problem.
Question: What happens if the pavers settle? Response: The sidewalk is within the
public right-of-way. If the sidewalk settles the City will repair that portion of the sidewalk.
The subgrade will be tested prior to placement of the pavers to try to eliminate that from
happening.
Question: Has the existing sidewalk held up as long as it should have? Response: The
existing sidewalk did deteriorate before its expected life cycle. At this point in time the
City would throw a lot of money at trying to assess blame between the supplier and the
contractor. The City has decided that rather than trying to do that they would accept
responsibility and repair the sidewalk. With ERMU burying the overhead power lines
and with the construction of the new building at Main Street and King Street this is the
opportune time to replace the sidewalk.
Question: Will we be buying the pavers from the manufacturer and will this be an open
bid situation? Response: No we will not. The manufacturer has informed us that they
have an ample supply and the Contractor should have no problem placing an order of
this size.
Question: Will the sidewalk project be completed before Art Soup? Response: Every
effort will be made to compete the project before Art Soup. If there are weather delays
then the downtown area will be restored to the best of the Contractor's ability and
construction will resume after Art Soup.
Question: Will parking restrictions be kept to a minimum? Response: Every effort will
be made to keep the disruption to the downtown area to a minimum. Weekly
construction meetings will be held to ensure proper coordination.
With no further questions the meeting was closed.
Howard R, Green Company'
CONSULTING ENGINEERS
~.NFOR~A TIONAL HEAR'rNa,
Name (Print) Mailin~ Address/Zip Phone No.
~\\~ ~¢% ~/~ ~J S~,
~,"~;,~~- "
PRO,TECT NAME: Downtown Sidewalk Replacement Project
CTTY OF: Elk River
DATE OF MEETTN&: 6:00 p.m., Thursday, March 1, 2001
RESOLUTION 01 -
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION ORDERING THE IMPROVEMENT AND PREPARATION
OF PLANS AND SPECIFICATIONS IN THE MATTER OF THE
DOWNTOWN SIDEWALK REPLACEMENT IMPROVEMENT OF 2001
WHEREAS
WHEREAS
a public hearing relating to the Downtown Sidewalk Replacement improvement
was held before the Elk River City Council after ten days mailed notice and two
weeks published notice of the hearing was given; and
the City Council has duly considered the Feasibility Report and those matters
presented at the public hearing by those persons desiring to be heard on the
matter;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota:
The Downtown Sidewalk Replacement improvement is hereby ordered as recommended
in the Feasibility Report dated February 22, 2001.
Howard R. Green Company is hereby designated as Project Engineer for this
improvement. The Project Engineer is directed to prepare plans and specifications for
the making of the improvement and the solicitation of competitive bids.
Passed and adopted this 19th day of March, 2001.
ATTEST:
Stephanie A. Klinzing, Mayor
Sandra A. Peine, City Clerk
O:\PROJ\812420j\0030\RESOLUTIONS 3-13-01 .doc
RESOLUTION 01 -
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS
AND ORDERING THE ADVERTISEMENT FOR BIDS
IN THE MATTER OF THE DOWNTOWN SIDEWALK REPLACEMENT
IMPROVEMENT OF 2001
WHEREAS
pursuant to Resolution 01 - , the Project Engineer has prepared plans and
specifications for the Downtown Sidewalk Replacement improvement, which
plans and specifications have been reviewed by the City;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota:
Such plans and specifications, a copy of which is attached hereto and incorporated
herein by this reference, are hereby approved.
The City Administrator shall prepare and obtain the publication of an advertisement for
bids for the making of the improvement pursuant to the attached plans and
specifications. The advertisement shall be published once each week for three
consecutive weeks, shall specify the work to be done, and shall state that the bids will be
received by the City Administrator until 10:00 a.m. on Thursday, April 12, 2001, at which
time the bids will be publicly opened in the Council chambers of the City Hall by the City
Administrator and the Project Engineer and will then be tabulated for consideration by
the City Council at a meeting thereof at 6:00 o'clock p.m. on Monday, April 16, 2001, in
the City Council chambers at City Hall. No bids will be considered unless sealed and
filed with the City Administrator and accompanied by a cash deposit, cashier's check, bid
bond, or certified check payable to the City Administrator in the amount of 5% of the
amount of such bid.
Passed and adopted this 19th day of March, 2001.
ATTEST:
Stephanie A. Klinzing, Mayor
Sandra A. Peine, City Clerk
O:\PROJ\812420j\0030\RESOLUTIONS 3-13-01 .doc
RESOLUTION 01 -
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION ADOPTING FINAL ASSESSMENT ROLL
WHEREAS,
upon due notice properly made as required by law, the Elk River City Council has
met and heard and passed upon all objections to the proposed assessment for
the Downtown Sidewalk Replacement improvement and has determined the
amount to be assessed against each individual property as the Council deems
just;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota:
Final assessment roll, a copy of which is attached hereto and incorporated herein by this
reference, is hereby accepted and adopted and shall constitute the special assessment
against the lands therein named. Each such tract of land in the assessment roll is
hereby found to be benefited by the improvement in an amount not less than the amount
of the assessment levied against it.
Such assessment shall be payable in equal annual installments, including both principal
and interest, amortized in such amount annually as is required to pay the principal with
interest as 6.5% over a period of three or five years.
The owner of any property so assessed, may, at any time prior to certification to the
County Auditor of the assessment or the first installment thereof, pay to the City
Treasurer the whole of the assessment on such property, with interest accrued to the
date of payment; except that no interest shall be charged if the entire assessment is paid
within 30 days after the adoption of this Resolution. Prepayment may also be made
after the certification of the assessment or first installment thereof by paying to the City
Treasurer/Auditor the entire amount of the assessment remaining unpaid with interest.
In the case of a payment made before November 15, interest will be calculated through
December 31 of the next succeeding year.
The City Administrator shall transmit to the County Auditor a certified duplicate of the
attached assessment roll to be extended on the property tax lists of the County. Such
assessment shall be collected and paid over in the same manner as other municipal
taxes.
Passed and adopted this 19th day of March, 2001.
ATTEST:
Stephanie A. Klinzing, Mayor
Sandra A. Peine, City Clerk
O:\PROJ\812420j\0030\RESOLUTIONS 3-13-01 .doc