5.1. SR 05-12-2008REQUEST FOR ACTION
To Item Number
City Council 5.1.
Agenda Section Meeting Date Prepared by
Administration May, 12, 2008 Bill Maextz, Parks and Recreation
Director
Item Description Reviewed by
Consider Authorization of River Walk Project Loxi ohnson Ci Administrator
Reviewed by
Action Requested
Authorization of River Walk Project.
Background/Discussion
In 1995 the City formed a Riverfront Corridor Committee to study the feasibility of developing
recreational access to the Mississippi River in downtown Elk River. The plans that emerged from that
process included the downtown park, trails, and a scenic overlook on the east side of the Parrish Avenue
Bridge. With the completion of the park in 2007, staff has focused efforts on phase one of the link from
downtown to Babcock Memorial Paxk. Staff has applied fox and received a use permit from MNDOT fox
construction of the trail ut MNDOT right of way. Staff believes the construction of the overlook and trail
section strengthens the potential fox grant opportunities.
Attached please fmd the updated concept design fox the trail head and scenic overlook and cost estimates.
The Elk River Rotary Club has committed $60,000 towards this project with the understanding that the
City completes the project in summer 2008 and receives reimbursement from the Rotary club over the
next three years. The cost estimate is $77,335; however, given the current bidding environment there is a
possibility that the project cost may be less. Staff is proposing that this project be run through the
Development Fund. Rotary monies will cover the majority of the project with the balance being covered
by the Development Fund. There is precedent of using this fund for recreational resources that enhance
downtown, as it helped fund River's Edge Commons.
Financial Impact
Cost Estimate $77,335
Rotary Contribution $6Q,000
Balance to be paid for by Development Fund
Attachments
• Concept Design
• Budget Estimate
• Letter of Commitment from Rotary
• Stax News Article from 1995
C:ADocumencs and Settings\jmillex\l,ocal Settings\Tempo~ary Intemec FilesVOLK3E\Action Requested Rivec IX/alk.doc
Action Motion by Second by Vote
Follow Up
C:ADoa~ments and Settings\jailllttVIwxal Settings\Tempozary In~emet A'ilesAOLK3H\Action Requested 12ivee Walk.doc
a ~'° 4 ,~'.~ ~' t a
.. ~"~'s> ~w_ #,, ~ ,ate
«, ~ ~
Y3~ ~~`~~ {~ '.i
a'ti
Q'.
~~tt
~y
A '"
.
1
{~..}~ ,
.
'ah
i X
a
~""~ ~' ~,~ '
t
~ Jr ~ ~
~ ~~~
~~ 'S
~ r.
,
~~
F F t ~t ~
4
/
\ ~~
a./~ 1
s'
,. ~~
v
`~ 's ~ €
„~..
~
w =" ".'
~~&~ ~
`
~ .
;`
i ,. + ~
~.,
3N
~~
~~~ ~~'!
4 3~ ,s?;.
ry. &.
3
SCHEMATIC COST ESTIMATE
PROJECT:
MISSISSIPPI RIVER OVERLOOK
OWNER
CITY OF ELK RIVER
13065 Orono Parkway
Elk River, MN 55330
LA ESTIMATE
line ITEM ITEM DESCRIPTION EST
NUMBER OTV UNIT UNIT PRICE UNIT TOTAL
ALTERNATES
1 Mobilization 5% max 1.00 LS $ 3,500.00 LS $ 3.500.00
2 earthworks/ ratlin 1 LS $ 3,000.00 LS $ 3,000.00
3 Im ort ranular Fill 177 CY $ 28.00 CY $ 4,956.00
4 Im ort select to soil lantin beds onl 42 CV $ 28.00 CY $ 1,176.00
5 Erosion control silt fence 273 LF $ 3.00 $ 819.00
6 Erosion control blanket 150 SY $ 5.00 $ 750.00
7 Crosswalk Markin -white 300 SF $ 5.00 SF $ 1,500.00
ALT 8 Cross walk avers demo bituminous 500 SF $ 18.00 EA $ 9,000.00
ALT 9 Cross walk concrete 1ft ed er 100 LF $ 18.00 LF $ 1,800.00
10 Pedestrian Curb Ram with Truncated Dome S stem 4 EA $ 400.00 EA $ 1,600.00
11 new dro curb at crosswalk removal and install 4 EA $ 1,000.00 EA $ 4,000.00
12 Concrete avers and base -u er laze 360.00 SF $ 70.00 SF $ 3,600.00
13 Concrete avers antl base -lower laze 360.00 SF $ 70.00 SF $ 3,600.00
14 Bituminous trail and base 1600.00 SF $ 3.25 SF $ 5,200.00
ALT 15 alternate wnc aver trail reflects credi[for bituminous 1600.00 SF $ 6.00 $ 9,fi00.00
16 4" lain concrete for bench & waste ad and base 136.00 SF $ 10.00 SF $ 1,360.00
17 Stone bench b owner 7.00 EA $ 500.00 EA $ 3,500.00
18 Install Slone bench su lied b owner 7.00 EA $ 375.00 EA $ 2,625.00
19 metal railin 19.00 LF $ 140.00 LF $ 2,660.00
20 Stone columns, ft ,veneer, ca 2.00 EA $ 2,500.00 EA $ 5,000.00
21 Stone seawall 0.00 LF $ 400.00 LF $
22 Trees 12.00 EA $ 350.00 EA $ 4,200.00
23 shrubs 90.00 EA $ 35.00 EA $ 3,150.00
24 erennials 50.00 EA $ 15.00 $ 750.00
25 Prairie seedin /mulch/establishment i~ SF $ 0.20 SF $ 3,200.00
26 Bench 2.00 EA $ 1,500.00 EA $ 3,000.00
27 Waste rece tacle 1.00 EA $ 1,300.00 EA $ 1,300.00
AL7 28 Post street li ht and ft 2.00 EA $ 5,000.00 EA $ 10,000.00
AL7 29 Electrical Service anel atlds 1.00 EA $ 1,000.00 EA $ 1,000.00
SUBTOTALS
design, admin fees 12%
Contingency of 8
$ sa,aas.DO $ 31.aoD.0o
$ 7.733.52
$ 5,155.68
TOTAL
$ 77,335.20
CITY OF ELK RIVER ~ RIVERS EDGE COMMONS schematic cost 4!23/2008 pg 1 of 1
Elk River Rotary Club
Service above sen-
ha profits most who serves best
May 7, 2008
Mayor & City Council
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
Dear Mayor and City Council:
Thursdays, 12:05
P.O. Box B
Elk River, Minnesota 55330
The Elk River Rotary Club's community service projects over the years has included the
Lion's Park Bandshell, renovation of Handke Stadium, and financing awalk-in freezer
for CAER Food Shelf.
As its next "signature" community improvement proj ect the Elk River Rotazy Club
wishes to partner with the City in initiating the long-awaited riverwalk trail along the
Mississippi River between downtown and Babcock Park. The Board of Directors
recently approved a financial commitment of $60,000 toward constructing the first phase
of the riverwalk project in 2008 -the "Bridge Park" concept as presented by Park &
Recreation Director Bill Maertz.
We anticipate that this financial commitment would be provided in the form of
reimbursement to the City up to a 3-yeaz period, or earlier depending on revenues
generated from the Rotary's Taste of Elk River annual fundraiser, commencing with
approximately $20,000 anticipated revenues in 2008.
We look forward to this opportunity to partner with the City on this improvement project
and to building a Mississippi River trail as a recreational asset for the community.
Respectfully,
Elk River Rotary Club Boazd of Directors
Catherine Mehelich, Club President 2007-2008
Lynn Caswell, Past President
Bob Maxwell, President-Elect
Bob Elveru, Committee Chair/President-Elect Nominee
Dr. Bill Meyer, Treasurer
Marilyn VanPatten-Chuba, Secretary
Jim Boyle, Director at Large
Linda Mielke, Director at Large
diver Star News! Wednesday, July 26, 1995
-~ s;
' `-~ • ~ " ~~~n~.' -Plans for river#ront pathway.
along.the Miss~ss~pps Rivet
First National Bank
Dare's km 'i ~ '~`~ Ma/nStreet
funeral -
Servlce Future Connection to
dd ~ ® Babcock Park and the
~ o~ ~ 0 Kelley Farm "
Pavilion Amphitheater F7rstBank Nadeau's
® ~
- ~ ® F~
r, ~ ~`.
T3v
, ... Q ~.
.. y
0 ro
~---~-
Riverwalk
~~.-- -- AbGardan,s
• Bicycle paN
- Pedestdan walk
RNerwatk
ti t~ -
Riverfiront Pathway Preliminary Cost Estimate
Tree, Bituminous and Utility Removal, Erosion Conuoi ......................:.... $17,160
Grading and Utilities (includes $208,500 to relocate overhead lines- ................. $ 241,700
Concrete, Brick, Bituminous, Rip•Rap, etc ...:................................. $190,004 •
Fish Llghis(281lghts, bases and ornamental poles) ............................... $ 92,400
Trees,Shrubs,Flowers,Sofl,Sod ............:..................................$ 48,213
Retaining Walls, Stairs, Dock, Bandstand, Pavilion ................................$188,470
River Testlng S1aUO0, Fountain, Lero Sculpture, Benches, Bike Racks, Signs, etc..... $ 51,800
15 %contingency ................................................... . ...... $124,471 I -Path W8y '
Total ......:..................................•.............
••••••••••••••$954,284 Continuedfrompage2
putting a sculpture of Lero on
~ p the island, at the cost estimat-
•Three paths would run west
~ werf rout ~t~~~ ~O~ ~~ CC1St '~~~~ 284 ed in the $4,000 range.
along the river between the
i ~ plaza and Dare's Funeral
y Joni Astrup
ssoc;ate editor
A pathway along the Missis-
ippi Itiver in downtown Elk
.lust -complete with a foun-
iin, bandstand and other
menities -would cost an esti-
iated $954,284.
That's the number unveiled
t a meeting Thursday night
y landscape architects from
loisinglon "Koegler Group
nc., the Minneapolis-based
~mpany hired by the city to
csign the pathway. -
Architects also showed
ketches of how the pathway
could look. The project
eludes some whimsical fea-
ures such as fish-shaped
ghts - a take-off on the fact
Irat the Mississippi between
Ilk River and Clearwater is a
remicr smaltmouth bass Gs~.
~ Etti; River
City Beat
ery - as well as a "nuts `n
bolt fountain" to commemo-
rate the hardware store that
burned in downtown Elk River
several years ago.
Michael Schroeder, a land-
scape architect with Hois-
ington Koegler, said the path-
way was designed with respect
for the historical and natural
value of the area, but "in a way
that is light-hearted and
whimsical and makes people
want to come back and makes
people actually talk about this
so it becomes an attraction."
Elk River Mayor Hank
Duitsman, one of about 20 peo-
ple at the meeting, said the
pr gjgct Fon, ~e~Q•ine a realrty
., ..,
"It's a community project," he' :The; estimate does not, how- architects. the lighting manufacturer's Service. A path for pedestrians,
said. "It can be done. It may ever,~include land acquisition A .terraced amphitheater representative what it would likely gravel surfaced, would
have to be done in stages." •.•;: or design fees would occupy the center part of take to be able to get light to hug the shoreline. Higher up
How the project would ' ba' 'While: the cost is an issue, the plaza and provide seating actually rnme out of the fish - tale bank would be separate,
funded has not yet been deter- most of the meeting dealt yvith . for a bandstand and dancing through the gills, through the side-by-side paths for biking-
mined. Former Mayor Jim the design of the pathway. area at the bottom of the hill. mouth and even putting in rollerblading and for pedestri-
Tralle, who Is chairing the Among the highlights: The bandstand, which would .some kind of red eyes. It's actu- ens, with overlooks along the
Riverfront Corridor ' Coro-
• • The former hole in the be a replica of the one that ally .very inexpensive to do river. The biking path would be
mittee overseeing the project, ground at Jackson Avenue and once stood in the town square that," Schroeder said. at least 8 feet wide while the
suggested getting the commu- Ma1n Strest, where the hard- at Jackson and Main carries a
- • An open pavilion costing an pedestrian one would be 8 feet
il
i
l
d
S
i
i 000
i
t
$28 estimated $22
000 would be
W
y
nvo
ve
.
erv
ce organ
- warq store once stood, would pr
ce
ag.
, , wide.. The two would be sepa-
zations, Scouts, school chil- be turned into a grassy plaza • The alley that now runs built at the bottom of King rated by a narrow bed for One of the fish lights.
dren and others could ell help with brick accents. The "nuts along the Sunshine Depot Avenue, just west of the First plants.
make it happen, ho said:•, `n bolts fountain," costing an would be closed and land- National Bank of Elk River. It .The side-by-side paths
Grants are another funding estimated . $25,000, would be scaped to becrome part of the would overlook an island in the would merge into one path east United Power Association au.:
option. :.!' built at the top of the hill near Plaza. Mississippi River, where a man of the plaza.. The path would then on to the Oliver Kellc~
Schroeder said the cosEof the Main Street. • A dock would extend into named Abner Lero once had a continue under the Mississippi Farm alon east Hi hwa 10.
pathway was estimated on the "One of the ideas we're bounc- tale Mississippi River at the garden: The Abner Lero River bridge. On the east side • The gravel path at tl~.
conservative aide and ineludss ing. around, it could be old bottom of the plaza, casting an Garden would be recreated on of the bridge, the path would river's -edge would continue
a $125,000 contingency. It also hardware artifacts within this estimated $38,000. the island and could be viewed curve up to the Main Street- ; east
merging into the mac,.
includes $208,500 for relocaL- fountain- play water off of •The path•and plaza would from the Abner Lero Pavilion. parrish Avenue inter3ection. _ ,
path just west of the brid};e
ing overhead power lines along them, run water over them in be illuminated by 28 ornamen- Architects also suggested (Eventually, city officials ; On the west
it would end in :,
the river, which may not be different ;Ways," said Paul tai fish lights costing an esti- would like to see the path run;; ,
grassy .area along the rivci
necessar
. y +a`~Tg9Ff~ , ,:..
..
~
P~yI~$, 0 ~ , of the pathway mated $2 960 each. "We asked
.__ .-_
' Pathwa continued to a e 12
i P g
Yf
...
,~~~.
7
a '
to Babcock Park. apross
from
~
and Dares Funeral Service
,..%. '....:. a.•.r,wa,• ... ~e,:i,~~ l
k~
l~i.1
,. r'; "~k ,.,cn,:~e..~.,. .,k~ h
i •
~
.
. 'i ,CIF *3°+.t (. r, l;!„ __
.-. ....~.-- .. _..