9. SR 04-25-1995ITEM NO. 9
•
ever
TO:
FROM:
DATE:
MEMORANDUM
Mayor and City Council
Patrick D. Klaers, City Administrator
April 20, 1995Q~
SUBJECT: Mn/DOT Tour
For the past eight years or so, Brainerd Mn/DOT officials have visited the
City of Elk River to see how our planning efforts are working out and how
their money is being spent on various projects. The City Engineer, Terry
Maurer, has contacted Brainerd for possible tour and meeting dates and
should have some information to provide the Council on Tuesday evening.
•
s:council:mndotaur
13065 Orono Parkway • P.O. Box 490 • Elk River, MN SS330 • (612) 441-7420 • Fax: (612) 441-7425
ITEIM~ L
TABLE 1 EAST T.H. 10 PRIMARY STUDY AREA
CITY OF ELK RIVER
MSA CONSULTING ENGINEERS
APRIL 1995
No. Zoning
Desi nation Gross Area
acres Restricted Soil
Acrea a Net Assessable
Acrea a Net Developable
Acrea e Projected Population
E uivalent
1 Sin le Famil Residential R1a 731 141 590 443 3,112
2 Sin le Famil Residential R1c 181 33 148 111 781
3 Sin le Famil Residential R1d 82 5 77 58 372
4 Two Famil Residential R2b 7 1 6 5 64
5 Townhouse/Multiple Famil Residential R3 7 0 7 5 91
6 Hi hwa Commercial C3 237 15 222 167 1,670
7 Li ht Industrial 11 303 26 277 208 2,080
8 Planned Unit Development PUD 50 24 26 20 200
9 Solid Waste Facili SWF 57 0 0 57 570
Total 1,655 245 1,353 1,072 8,939
TABLE 2 STEERING COMMITTEE PROPOSED AREA
CITY OF ELK RIVER
MSA CONSULTING ENGINEERS
APRIL 1995
No. Zoning
Desi nation Gross Area
acres Restricted Soil
Acrea a Net Assessable
Acrea a Net Developable
Acrea a Projected Population
Equivalent
1 Sin le Famil Residential R1a 216 7 209 157 1,102'.
2 Sin IeFamil Residential R1c 45 4 41 31 216'
3 Sin le Famil Residential R1d 82 5 77 58 372
4 Townhouse/Multi le Famil Residential R3 7 0 7 5 91
5 Hi hwa Commercial C3 237 15 222 167 1,670
6 Li ht Industrial 11 303 26 277 208 2,080
7 Planned Unit Develo ment PUD 35 18 17 13 200
8 Solid Waste Facili SWF 57 0 0 57 570
Total 982 75 850 695 6,302 '.
TABLE 3 ESTIMATED ASSESSMENT RATE FOR POSSIBLE URBAN SERVICE AREA
CITY OF ELK RIVER
MSA CONSULTING ENGINEERS
APRIL 1995
Estimated Estimated Total Construction Net Assessable Estimated
Area Sewer Construction Watermain Construction Cost Acreage Assessment Rate
Cost ($) Cost $ $ $/acre)
East T.H. 10 Primary Study Area 3,834,000 3,537,000 7,371,000 1,353 5,447.89'
Steering Committee Proposed Area 2,703,000 2,843,000 5,546,000 850 6,524.71
s
• • • ,
TABLE 4 DISTRIBUTION OF GREEN ACREAGE
CITY OF ELK RIVER
MSA CONSULTING ENGINEERS
APRIL 1995
Area Net Assessable Green Percent of Net Assessable 'i
Acreage Acreage Acreage as Green
Acreage
East T.H. 10 Primary Study Area 1,353 949 70.13
Steering Committee Proposed Area 850 468 55.04