Loading...
5.4. SR 04-03-1995of Item 5.4. River MEMORANDUM TO: Mayor & City Council FROM: William Rubin, Economic Developmeny~l Coordinator 44 ~~'' DATE: April 3, 1995 SUBJECT: Financing Alternatives - Custom Motors, 13913 Highway 10 Introduction At its meeting on Apri13, 1995, the Elk River City Council will continue to discuss financing alternatives related to the successful relocation of Custom Motors from its current site at 13913 Highway 10 to another site within the community. Resolution of this issue is sought so as to provide Custom Motors with definitive direction on the type and the depth of public participation related to the company's relocation in Elk River. Background The owners of Custom Motors indicate that they control a parcel of land that is located in both Elk River and Ramsey. Although Custom Motors has the ability to extend the purchase agreement or option to purchase, the site's owner desires resolution to this matter. That is, other parties may be interested in acquiring this parcel should Custom Motors fail to exercise the option. In addition, the owner of the site indicates that these extensions are costing it money by virtue of carrying costs, taxes, and the like. Another issue is that of Custom Motors' owners successfully obtaining long- term permanent financing for its expansionlrelocation. A representative from the financial sector indicated at the March 20 meeting that it will be difficult to obtain permanent financing in light of the fact that Custom Motors deals with substances that may pollute or contaminate the site. Should the City/EDA participate in supplemental financing, the same concerns would apply. For example, in an EDA mortgage, one will find specific language dealing with mortgagor warranties and covenants addressing hazardous substances, hazardous waste, toxic substances, pollutants, or contaminants • affecting the mortgaged premises. The basis for this point is that any public 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 financing tool should not be immune from the same concerns that a conventional lender may have. Given that, the City/EDA should not be expected to assume any more risk than traditional lenders would assume. Unless adequate long-term financing can be arranged, the City/EDA should be under no extraordinary obligation to assume the successful relocation of Custom Motors to another site in the community. Certainly the City and its EDA should be partners in the expansion, relocation, or consolidation of commercial and industrial operations within the community. However, with the scarcity of public funds, the City can not and should not be expected to issue a blank check to ensure that a business is retained within the corporate limits. If a private sector lender steps forward with permanent fmancing, the City/EDA will likely consider supplemental financing through its micro loan fund. As with any request for assistance, the applicant will undergo a credit analysis. This will help determine the applicant's ability to repay any and all public funds. • ~ILISII,I'I{G 6;.11~111;EIiS 1326 Energy Park Drive SI. Paul, AlN 55108 611-6444389 1 800 886 2923 Pox. 612-6449446 CIVIL ENGIN([0.1NG ENVIRONMMiAI MUNICIPAL PLANNING SOLID wA51E ~iRVCNRAI SURVEYING rRAPPIc IRANSPORiAlION EEfCTRICAUMECNANICAI EN ~INFfRING 11YAC POW ER DISiR18UiIGN SCZDA SYSIFM COMROIS OFFICES IN: MINNEAPOl15 ~RIOR LAKE ST. PAUL WASECA ITEM 5.5. March 29, 1995 File: 230-246-10 Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Pazkway P.O. Box 490 Elk River, MN 55330 RE: FIFTH STREET/DODGE/ELK HILLS STREET IMPROVEMENTS Deaz Mr. Klaers: As you are awaze, at the last City Council meeting, the City Council by consensus authorized us to begin work on the plans and specifications for this project. However, they did not make a decision relative to the alignment of the Elk Hills Drive intersection. At that same meeting, Mr. Gary Satwire made comments regarding a compromise intersection alternative. He suggested that the City consider the curved alternative but place a stop sign for northbound Dodge Avenue traffic. We have taken a preliminary look at Mr. Satwire's suggestions and offer the following pros and cons relative to this type of intersection layout. PROS • A stop sign will help keep the intersection open for all vehicles coming from TH 169 and School Street. ^ Dodge Street grid Dodge Avenue aze pushed further to the east, providing slightly more stacking than the curved option discussed previously. ^ Theeastbound-to-northbound left turn is a free movement, improving the level of service (LOS) for left turning vehicles from LOS D. ^ Eastbound vehicles fmm either School Street or TH 169 have more area to perform lane changes. ^ Pedestrian crossing distance is shorter. CONS ^ The LOS for all northbound vehicles on Dodge Avenue is reduced, which will result in increased delay. • PIacing two stop signs at a T-intersection creates a potential safety problem since it is harder for drivers to establish who has the right-of-way through the intersection. ^ Weaving of traffic will occur as vehicles from TH 169 and School Street tLavel northbound to Dodge Street and Elk Hills Drive. Z9 - d 1r117d 1S tySW 9^z = S S r1H1 56-19g-21li W Mr. Pat 1{laers March 29, 1995 • Page Two ^ The intersection contains a curve. ^ Elk Hills Drive is offset from the intersection. ^ This option has less stacking than the 4-way intersection discussed previously. Currently, we are working with Mr. Satwire to further define the alignment of the road on the property. We will. be able to present more detailed information at the public hearing regarding the new alternative. As was discussed at the last City Council meeting, the most appropriate schedule for proceeding with this project would be to receive the petition that Mr. Satwire has indicated he will be submitting to the City. At that time, the City Council could pass a resolution ordering a public hearing on this project. We would suggest that the public hearing not only include those proposed to be assessed for the improvements, but all property owners that may be affected by the improvements. This would essentially be the same mailing list that was used for the informational meeting held several weeks ago. At the public hearing, it would be appropriate for an in-depth discussion of the various intersection alternatives and, at that point in time, we would look for the City Council to make a decision on the chosen alternative for the Elk Hills Drive/Dodge Avenue intersection. The close of the public hearing would be the appropriate time for the City Council to consider a resolution authorizing preparation of the plans and specifications and ordering of the project. Given the consensus direction from the City Council to begin work on the plans and specifications at the time of the public hearing, they may be 759'0-809'0 complete with the remaining work being the addition of the chosen intersection alternative. We would not recommend that the City Council make any firm decision on the intersection layout prior to the public hearing; however, we will be available at the April 3rd City Council meeting to discuss any questions the City Council may have. Sincerely, MSA, CONSUL? T~IN~G ENGINEERS Terry J. Maurer, P.E. TJM:tw Attachment 246-2901.mer t £9 - d 1fltJd 1S tJS W S ^a i L flH1 ss-9E-aew