Loading...
7.3. SR 04-03-1995Item 7.3. ver MEMORANDUM TO: Mayor & City Council FROM: Pat Klaers, City Add;ni rator DATE: April 3, 1995 r~[D~~/ SUBJECT: Transportation Plan At the last joint meeting between the School Board and the City Council, discussion took place regarding transportation routes through the City. Since that time the City has been working on its long range transportation plan and the concept of an east/west corridor has generated a lot of recent newspaper print and public participation at the Comprehensive Plan Committee meetings. City Engineer Terry Maurer will be in attendance at this joint meeting and will be prepared to review some of the east/west corridor options that are • currently being evaluated. The corridor plan also includes a bridge over the Elk River somewhere near our western city limits. This bridge is needed to ensure adequate access for emergency vehicles to the part of the City and the County that lies directly north of the Elk River along our western boundary. In addition to a review of our long range transportation plan, the City Engineer should also be able to provide some update on the status of the requested improvements to County Road 1. At this time, it looks like the County is prepared to move forward with an improvement project for County Road 1, but we are still not certain as to the exact scope of this project or the timing of the project. However, in general, we feel that it is going to be an urban design of some type and is going to be constructed somewhere near the end of 1995 and in 1996. 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425