Loading...
6.2. SR 05-19-2008Item # 6_2. ver MEMORANDUM TO: Mayor and City Council FROM: Bill Maertz, Parks and Recreation Director DATE: May 19, 2008 SUBJECT: Orono Parkway Medians Staff presented four alternatives fox landscaping the Orono Parkway medians at the May 5, 2008 City Council meeting. Attached please find the action requested memorandum from that meeting. Staff will be present to answer any questions and~ox review the alternatives. REQUEST FOR ACTION To Item Number Ci Council 6.1 Agenda Section Meeting Date Prepared by Public Works May S, 2008 Bill Maextz, Parks and Recreation Director Item Description Reviewed by Orono Parkway Median Plans Loxi ohnson Ci Administrator Reviewed by Action Requested Staff is seeking direction on the landscaping plan fox Orono Parkway medians. Background/Discussion Council requested that staff develop alternatives fox improving the appearance of Orono Parkway. Features from these options can be added ox eliminated if so desired. Pour alternatives: 1. Leave the prairie plantings in place and install high quality interpretive signage to educate public about native plantings. 2. Landscape four of the median ends with formal plantings of trees and perennial flowers. This option leaves the native plantings in the medians while creating a formal look at the City Hall entry and east and west ends of the parkway. This includes an option to have a sandblasted boulder on the east and west ends. 3. Remove native plantings and replace with sod, irrigation and trees spaced every 40 feet. 4. Remove native plantings and replace with salt tolerant, low growing shrubs, wood mulch and trees space every 40 feet. Financial Impact Construction Cost Estimates 1. $6,000 2. $27,000 3. $92,000 4. $102,000 Maintenance Cost Estimates (existing plantings require one mowing in the spring, 8 hours) L No change 2. 40 hours per year weeding and irrigation repairs. 3. 200 man hours per year mowutg, irrigation repairs, herbicide application, eveed whipping. Fertilizer and herbicide - $3,500 Watcx $300 Irrigation supplies $400 4. 200 man-hours fist year watering C:\Doeuments and Settings\jrrdllec\Local Settings\Tempoxary intemet Files\OLK3L'\Medians Item G 1 (2).doc 200 man-hours per year weeding, mulching, tree trimming X300 herbicide $5,000 each year to top dress mulch Attachments • Concept Designs 1-4 Action iVto[ion by _ Second by Vote Follow Up C:ADocumenrs and Se[RngsAjmilles\Local Sertings\Temporery Income[ FilesVOLK3E\Med3ans I[em 6 1 (2).doc