Loading...
7.1. SR 01-16-1996ITEM 7.1. 'ity of vet TO: FROM: DATE: SUBJECT: MEMORANDUM Mayor and City Council Steven B. Ach, City Planner~ January 16, 1996 Request for Final Plat Approval, Weatherwood Subdivision, Case P 95-1 Issue Jeff Mastley and Randy Lindquist are requesting final plat approval to subdivide approximately 80 acres into 21 single family residential lots. Location The property is generally described as the area lying east of Zebulon Street (County Road 72) and directly south of Fairhaven Hills subdivision. Zoning/Land Use Rla (Single Family Residential) / LR (Low Density Residential) Attachments Location Map · Final Plat · Resolution 95- Background This plat was presented to the City Council on December 18, 1995, for consideration. Based on unresolved drainage issues, the final plat was deferred to tonight's meeting allowing the developers to assemble the appropriate information. The City Engineer is reviewing drainage information submitted by the developer's engineer. The information from the developers was not available for distribution. The City Engineer is expected to be ready to update the Council at Tuesday's meeting. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 Weatherwood Subdivision Final Plat December 18, 1995 Page 2 Recommendation It is recommended the City Council approve Resolution 95- , granting final plat approval with the conditions outlined in the resolution: A developer's agreement be prepared outlining the terms and conditions for plat approval and installation of improvements. All comments outlined in the City Engineer's memo dated June 21, 1995, be addressed and incorporated as part of the final plat prior to recording. o A surface water management impact fee in the amount of $1,297.80 be paid to the City prior to releasing the final plat for recording. A park dedication fee in the amount of $10,500 be paid prior to releasing the final plat for recording. All of the proposed wetland mitigation areas occur outside of the easements which encumber the county ditch system. o A tree preservation plan be submitted with each building permit where homes are constructed in wooded areas. An NPDES Permit be obtained for the grading associated with the development prior to commencing any grading on site. o Proper erosion control be incorporated into the grading and road construction plan. Best Management Practices shall be utilized and reviewed and approved by the City Engineer. The developer reimburse the City for all of the costs associated with reviewing this plat prior to releasing the plat for recording. 10. Developer shall provide the City with a Letter of Credit in the amount required by the City to cover the costs of all street improvements. 11. Upon completing all of the improvements and having them accepted by the City, a warranty bond in the amount of 25% percent of the improvement costs shall be submitted to the City for a one-year period. s:council:p95-1xxx Weatherwood Subdivision Final Plat Page 3 December 18, 1995 12. As part of the road construction improvements, the developer shall be responsible for extending Troy Street north of 199th Avenue into the Fairhaven Hills plat. 13. Street lights be installed as part of the public improvements as required by the City. 14. All driveways within the plat be improved with either a bituminous or concrete surface from the edge of the street to 10 feet within the property line. 15. The developer shall pay a sealcoating fee in the amount determined by the City Engineer prior to releasing the final plat for recording. 16. A development plan illustrating type of home and finished floor elevations be approved by the City Engineer prior to issuance of a building permit. 17. A letter of credit be provided to the City prior to recording the plat to ensure the wetland mitigation work is completed. This letter of credit shall remain in effect for one (1) year following City acceptance of mitigation work. 18. Appropriate restrictive covenant documents be prepared for the Building and Zoning Administrator to review which can be recorded to protect the wetland mitigation areas. s:council:p95- lxxx LOCATION MAP ~m~R~ver * // ]; I/,~..] F~I '% RESOLUTION NO. 95 - CITY OF ELK RIVER A RESOLUTION GRANTING FINAL PLAT APPROVAL FOR: WEATHERWOOD CASE NO. P 95-1 WHEREAS, application has been made for final plat approval, pursuant to Section 1008.08 (1)(c) of the Elk River City Code of Ordinances, of the property legally described on attached Exhibit A and hereinafter referred to as "the Property"; and WHEREAS, the application for preliminary plat approval has been referred to the Planning Commission which has given its advice and recommendation to the City Council; and WHEREAS, a preliminary plat of the Property was approved by the City Council on December 18, 1995; and WHEREAS, the proposed final plat is consistent with the preliminary plat as approved by the City Council; and WHEREAS, the proposed final plat complies with each of the conditions set forth by the City Council in its approval of the preliminary plat of the Property; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ELK RIVER, as follows: It is hereby determined by the City Council for the City of Elk River as follows: The proposed subdivision is consistent with the Zoning Ordinance and conforms with all of its requirements. The proposed subdivision is consistent with all applicable general and specialized city, county, and regional plans including, but not limited to, the City's Comprehensive Development Plan. The physical characteristics of the site, including, but not limited to, topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and drainage are suitable for the type and density of development and uses contemplated. Do The proposed subdivision makes adequate provision for water supply, storm drainage, sewage transportation, erosion control and all other services, facilities and improvements otherwise required herein. The proposed subdivision will not cause substantial environmental damage. Fo The proposed subdivision will not conflict with easements of record or with easements established by judgment of a court. The proposed subdivision will not have an undue or adverse impact on the reasonable development of neighboring land. Final plat approval is hereby granted for the Property, subject to the conditions set forth in attached Exhibit B. o The officers of the City are hereby authorized, once the conditions set forth in Exhibit B are met and complied with, to sign the final plat for the Property and to issue a certified copy of this Resolution giving final approval of the plat. The owner of the Property is authorized to record the final plat as required by law and shall file proof of said recording with the City. No building permits will be issued for the Property until the final plat is recorded. ° This final plat approval shall expire two years from the date of this resolution if the final plat is not recorded within that time. The foregoing resolution was introduced by Council Member and duly seconded by Council Member The following voted in favor of the Resolution. The following voted against the Resolution: The following were absent: Page 2 WHEREUPON the resolution is adopted. Passed and adopted this__ day of ,1995 Henry Duitsman, Mayor CERTIFICATE STATE OF MINNESOTA COUNTY OF SHERBURNE CITY OF ELK RIVER I, the undersigned, being the duly qualified and acting Clerk of the City of Elk River, Minnesota, hereby certify that the above resolution is a true and correct copy of the resolution as adopted by the City Council of the City of Elk River on ,1995. WITNESS my hand officially as such Clerk and the corporate seal of the City this __ day of ,1995. Sandra Thackeray, City Clerk STATE OF MINNESOTA SS. COUNTY OF SHERBURNE The foregoing instrument was acknowledged before me this __ , 1995, by Henry Duitsman, Mayor, City of Minnesota. Elk day of River, Notary Public Page 3 STATE OF MINNESOTA SS. COUNTY OF SHERBURNE The foregoing instrument was acknowledged before me this __ day of , 1995, by Sandra Thackeray, City Clerk, City of Elk River, Minnesota. Notary Public THIS INSTRUMENT WAS DRAFTED BY: LARKIN, HOFFMAN, DALY & LINDGREN, Ltd. 1500 Norwest Financial Center 7900 Xerxes Avenue South Bloomington, MN 55431 Page 4 EXHIBIT A That part of the Southwest Quarter of the Southwest Quarter of Section 19, Township 33, Range 26, Sherburne County, Minnesota, that lies west of the West line of the East 330.00 feet thereof; and that lies north of the North line of the South 400.00 feet thereof, Excepting therefrom the North 350.00 feet of the South 750.00 feet of the West 320.00 feet of said Southwest Quarter of the Southwest Quarter. Also exception therefrom the West 20.00 feet of the East 350.00 feet of the North 350.00 feet of the South 750.00 feet of said Southwest Quarter. Subject to that part taken for County Road No. 72, also known as Zebulon Street N.W., together with: The South 825.00 feet of the Southeast Quarter of the Southwest Quarter. The East 330.00 feet of the South 660.00 feet of the Southwest Quarter of the Southwest Quarter. The South 200.00 feet of that part of the Southwest Quarter of the Southwest Quarter lying West of the East 330.00 feet thereof. Section 19, Township 33, Range 26, Sherburne County, Minnesota. Also the South 200.00 feet, lying North of the South 200.00 feet of that part of the Southwest Quarter of the Southwest Quarter lying West of the East 330.00 feet thereof, in Section 19, Township 33, Range 26, Sherburne County, Minnesota. The Southeast Quarter of the Southwest Quarter, except the South 825.00 feet thereof, Section 19, Township 33, Range 26. The East 330.00 feet of the Southwest Quarter of the Southwest Quarter, except the South 660.00 feet of said East 330.00 feet. Section 19, Township 33, Range 26. Page 5 EXHIBIT B A developer's agreement be prepared outlining the terms and conditions for plat approval and installation of improvements. All comments outlined in the City Engineer's memo dated June 21, 1995, be addressed and incorporated as part of the final plat prior to recording. A surface water management impact fee in the amount of $1,297.80 be paid to the City prior to releasing the final plat for recording. A park dedication fee in the amount of $10,500 be paid prior to releasing the final plat for recording. All of the proposed wetland mitigation areas occur outside of the easements which encumber the county ditch system. A tree preservation plan be submitted with each building permit where homes are constructed in wooded areas. An NPDES Permit be obtained for the grading associated with the development prior to commencing any grading on site. Proper erosion control be incorporated into the grading and road construction plan. Best Management Practices shall be utilized and reviewed and approved by the City Engineer. The developer reimburse the City for all of the costs associated with reviewing this plat prior to releasing the plat for recording. 10. Developer shall provide the City with a Letter of Credit in the amount required by the City to cover the costs of all street improvements. 11. Upon completing all of the improvements and having them accepted by the City, a warranty bond in the amount of 25% percent of the improvement costs shall be submitted to the City for a one-year period. 12. As part of the road construction improvements, the developer shall be responsible for extending Troy Street north of 199th Avenue into the Fairhaven Hills plat. 13. Street lights be installed as required by Anoka Electric or Elk River Utilities. 14. All driveways within the plat be improved with either a bituminous or concrete surface from the edge of the street to 10 feet within the property line. 15. The developer shall pay a sealcoating fee in the amount determined by the City Engineer prior to releasing the final plat for recording. Page 6 16. 17. 18. A development plan illustrating type of home and finished floor elevations be approved by the City Engineer prior to issuance of a building permit. A letter of credit be provided to the City prior to recording the plat to ensure the wetland mitigation work is completed. This letter of credit shall remain in effect for one (1) year following City acceptance of the mitigation work. Appropriate restrictive covenant documents be prepared by the Building and Zoning Administrator and recorded to protect the wetland mitigation areas. Page 7