Loading...
5.1. SR 06-02-2008REQUEST FOR ACTION To Item Number Cih~ Council 5.7. Agenda Section Meeting Date Prepared by Public Works June 2, 2008 Terry IV4aurer, Pub&c Works Director Item Description Reviewed by Trott Brook Parkway Traffic Cahming Lori ohnson, Cita.ldministratox Reviewed by Action Requested Staff seeks direction concerning implementation of traffic calming on Trott Brook Parkway. BackgroundlDiscussion Late h 2007, the Cia- Council received a petition from the'1'xott Brook Patens neighborhood asking for speed abatement measures to be implemented on Trott Brook Parl~va5-. ° t die e~pril 14, 2008 City Council workshop, we presented several different options fox proposed traffic calving implementation. ?mot that point in time, the City Council directed us to come back with more speciFic information and cost regarding striping of "Trott Brook Parkway and possible installation of driver feedback speed lrnit signs. The City Council also gave direction for staff to prepare a draft traffic calving policy. ~7ork on that policy is continuing and that document will be preserved at a liter date. Trott Brook Parl~vay is a slightly wider roadway than typical, being 38 feet wide, to accommodate heavier traffic movements to and from CS1~H 12 and~or CSAH 13. The striping proposal would place a centerline skip stripe along Trott Brook Parkway. Also, the edge Ines evould have a sold white stnpe delncadng the navel lanes and idcntifynrg the shoulder uea. Trott Brook Parkway is approximately 1-1 voles long from CSAH 13 to CS1yH 12. To place these three stripes along the total length of the roadway would cost approximately $2,000. It is important to note drat once the roadway is sniped, it will need to be re-striped on a periodic basis. 'Typically, we get approximately three years ont of a sriphg before it has to be redone. The driver feedback speed llvit signs are approximately $10,000 each installed. If we proceed with the l2stallation of these signs, it would be out proposal that the city would purchase them directly from 3M and hire a contractor to install the signs permanently at each end of Trott Brook Parkway. Financial Impact To install two driver feedback speed litmit signs and vo totally snipe Trott Brook Parkway would cost approximately $22,000. Staff s recommendation is to use Street Improvement Resei~e Ponds for an~~ or all of the traffic calming improvements discussed in this memo. Attachments -None 'Lnxf Bonk Padwap'C~affic C;iliniog ~ucc 2, 2005 Pagc 2 QCt1OIl A1Otion b~ Second by ~'o re Follow Up b-APULRLIC CVO] 1 S ~Erniocum P6]YtOL~ fx~fFc Calm~c;~VO6 U2 03 ¢ mcno.duc