Loading...
6.7. SR 01-22-1996 January 16, 1996 CONSULTING ENGINEERS File: 230-151-31 TTEN 6.7. 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax: 612-644-9446 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 WASTEWATER TREATMENT FACILITY UPGRADE ELK RIVER, MINNESOTA Dear Mayor and Council Members: CIVIL ENGINEERING ENVIRONMENTAL MUNiCiFAL '~NNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS Bids for the Wastewater Treatment Facility Upgrade project were opened on December 14, 1995, and presented to the City Council at their January 15 CIP Workshop. For your information the bids are tabulated below. Gridor Constr., Inc. Madsen-Johnson Corp. Lametti & Sons, Inc. Rice Lake Contractor Bor-Son Construction Knutson Construction Adolfson & Peterson Lysne Construction, Inc. NewMech Companies, Inc. $3,292,900 $3,423,0O0 $3,479,670 $3,516,000 $3,518,000 $3,576,000 $3,792,200 $3,878,000 $4,924,400 There were a total of nine bids received for the project. The successful lowest bidder was Gridor Construction, Inc., whose bid was $3,292,900. Their bid was well below the estimate for the project as we discussed at the workshop. The competitiveness of the market was apparently reflected in both the number of bidders and the prices for this project. In 1994, Gridor Construction, Inc., completed the Interim Upgrade project for the Elk River wastewater treatment plant. This upgrade is the continuing effort of the Interim Upgrade for the expansion of the wastewater treatment plant from its current 1.04 million gallons per day capacity to 2.20 million gallons per day. OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA Based on Gridor's familiarity to the existing site conditions and the quality of work they performed on the Interim Upgrade project, we would recommend award of the contract to Gridor Construction, Inc. Attached is a draft resolution which accepts the bid and authorizes execution of a contract with Gridor Construction. An Equal Opportunity Employer Honorable Mayor and City Council January 16, 1996 Page Two If you have any questions, I will be in attendance at your January 22, 1996, City Council meeting. Sincerely, MSA, CONSULTING ENGINEERS TJM:pd Attachments 151-2703.dec RESOLUTION 96 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE WWTF UPGRADE OF 1996 WHEREAS, pursuant to City Council direction, competitive bids were solicited and received for the WWTF Upgrade as set forth in the bid tabulation attached hereto and incorporated herein by this reference; and, WHEREAS, the City Council has considered the amount of the bids and the responsibility of the bidders and determined that Gridor Construction, Inc., is the lowest responsible bidder; and, WHEREAS, the City Council has reviewed the revenue and expense projections of the Wastewater Treatment System fund and has determined that this project is financially feasible; and, WHEREAS, a Declaration of Official Intent (as required by Treasury Regulations, Section 1.150-2 under the Internal Revenue Code of 1986, as amended) stating that the City expects to sell bonds for this project was signed on October 23, 1995. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such contract with Gridor Construction, Inc., as is approved by the City Attorney for the completion of the WWTF Upgrade according to the approved plans and specifications. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with theft bids upon execution of the contract above specified. Passed and adopted by the City Council of the City of Elk River this 22nd day of January, 1996. Henry A. Dnitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk s:XdocumentXresolutiXwwtfup gd.doc