Consider Public Safety Facility Change Orders
Item 4.3.
The following change orders have been requested on the public safety building. Most of thc
items are minor construction changes. The large items include additional storm sewer pipe,
the addition of a water softener system, and thc deletion of infra-red heating in thc fire
station bays.
Bid Package
Contractor Number
Dryden Excavating
Kelleher Construction
Daka Corporation
Daka Corporation
Western Steel
George F. Cook Construction
Northern Air Corporation
Sentra Sota Sheet Metal
Sentra Sota Sheet Metal
Collins Electrical
Total
Previously Approved
Total Change Orders to Date
11
12
14
4O
43
43
45
Change Order
Number
5 1
8 1
11 1
2
1
2
Change Order
Amount
10,650.00
280.00
1,922.00
115.00
2,188.00
4,498.00
14,997.00
(10,641.00)
178.00
954.00
25,141.00
5,902.00
31,043.00
Attached is a budget summary for the public safety project that includes these change orders.
The project is still well under budget with these change orders.
Action Requested