Loading...
4.8. SR 01-13-2003TO: FROM.' DATE: SUBJECT: MEMORANDUM Mayor and City Council Gary Leirmoe, VWNTP Chief Operator January 13, 2003 Request by ~fVVTP to Purchase Jet Truck **Item 4.8.** The 2003 wastewater department budget includes funds for replacement of the jet truck and vacuum trailer. During the past year the department tested several different trucks. We have determined that the Vac-Con equipment best fits our needs and also offers competitive pricing. This equipment would be purchased through the state contract from ABM Equipment located in Hopkins. The price of the truck is $235,432.34, plus an additional $5,000 to set up the truck with nozzles, toolboxes, and a radio. The wastewater department has received a $10,000 safety grant to use toward the truck purchase. The total price of the truck and equipment would be $240,432, minus the $10,000 safety grant for a total of $230,432 funded by the city. Action Requested I am requesting authorization to purchase the new.let Vac Truck at a cost of $240,432 with $10,000 of safety grant funds and $230,432 funded by the city. 333 2ND STREET N.E. HOPKINS, MN 55343-8337 952-938-5451 FAX 952-938-0159 WATS 800-229-5451 www. abm-highway, com Custom Truck Equipment for the Utility, Construction, Municipal and Refuse Industries Quotation # 101602-639 October 16, 2002 Mr. Gary Leirmoe City of Elk River- 248 Railroad Drive ElkRiver, MN 55330 .... Dear Gary, In response to your request for pricing on a combination sewer cleaner, I am pleased to submit the following per Minnesota State Contract # 428489: 1.0 VAC-CON V209-1000 Tandem $ 94,500.00 2.2 11 cubic yard debris body. No Cost .~ Hydraulic rear door locks with ~abber. No Cost 2.6 Automatic debris body washout system. $ 1,050.00 2.61 Hydraulic Rear Door Opener $ 2,400.00 2.68 Hydraulic Pump Off System - 350 GPM $ 5,513.00 2.70 Gravity Drain system for pump off option $ 1,t63.00 3.12 Centrifugal separator. No Cost 3.4 Vacuum breaker system. No Cost 3.5 200" fan system. $ 6,500.00 3.7 Hydrostatic drive. $ 5,333.00 4.5 10' telescopic 8" boom system. S 8,000.00 4.62 4' x 8" aluminum pipe extension (2 at $156.00 each). $ 312.00 4.64 6' x 8" aluminum pipe extension (5 at $185.00 each). $ 925.00 4.692 3' x 8" clear'demo tube. $ 333.00 4.7 Additional pick-up tube clamps - 6 each. $ 120.00 5.1 60 GPM / 3000 PSI water system. $ 4,000.00 6.1 180 degree hose reel articulation. $ 8,000.00 6.4 Auto level wind guide $ 3,500.00 6.5 Footage counter. $ 320.00 6.6 Additional 100' hose at $ 2.62 per foot. $ 262.00 7.11 1,500 gallon water tanks. $ 5,500.00 7.21 Air purge system $ 500.00 7.4 Hand gun hose reel with 50' hose. $ 1,300.00 7.41 Variable flow $ 251.00 8.1 Behind cab storage box. $ 1,040.00 8.2 35" x 14" x 24" side mount tool box. $ 469.00 9.24 Strobe light front or rear $ 423.00 9.25 Arrow Board. $ 986.00 Br/'n~Fin~7 you the best names/n the business An~qUal Opportun/?y Employer Quotation # 101602-639 - 2 - October 16, 2002 9.27 Hand Held Spot Light $ 266.00 9.3 Boom work lights. $ 347.00 9.31 Rear work lights $ 347.00 9.34 Limb guard for work lights (4 each). $ 220.00 9.36 Electronic back-up alarm. $ 161.00 9.37 Low water alarm with horn and shut-off $ 188.00 9.50 Rear mounted_~3,v hooks. ~ $ 204.00 9.51 Grease zerk m~nifold for 10' boom. -- $ 217.00 9.52 Auxiliary en.g!ne remote oil drain. $ 151.00 9.58 Dual roller level guide. $ 104.00 13.3 2003 Sterling LT-7501 chassis. $63,000.00 PRICE $ 217,905.00 6.5% MN SALES TAX $ 14,763.83 TOTAL PRICE, FOB ELK RIVER, MN $ 232,068.83 Additional items not on State of Minnesota Contract: 1. Hose reel grease manifold ............................................................................ $ 311.00 2. Debris body grease manifold ....................................................................... $ 620.00 3. Lazy Susan pipe rack (5 piece) .................................................................... $1,756.00 4. Build brackets/boxes for aux. tools ............................................... $ 490.00 Subtotal $ 3,177.00 6.5% MN Sales Tax $ 206.51 TOTAL OPTIONS $ 3,383.51 GRAND TOTAL, INCLUDING OPTIONS $ 235,452.34 ABOVE PRICE INCLUDES FACTORY OPERATOR AND MECHANIC TRAINING Thank you for considering ABM Equipment & Supply, Inc. I hope the above information will allow you to place this business with us. Should you have any questions or need additional information, please do not hesitate to contact me. Sincerely, Bill Dietrich Sales Representative S~p Accepted by Customer,~ing City Council Approval: Signature X~~ Date: (~ t -- 168.00 CT 4-26.66 [35'-6 3/4"] 10 X 170 TELESCOPIC BOOM DRAWN DAlE RTB ] O- ~ 6-02 ~ WEIGIIf 3.03='1 LEi CITY OF ELK RIVER, MN V311LHAE/1500 1.500 GALLON WAVER SYS1'EM t.~x'r ^ssE.~ I I I I Arrowboard Arrowstick 702-0101 "Lazy Susan" pipe rack 7 · 4 or 5 pipe capacity · Ease of storage and removal -6'-0" TO 4 pipe model GROUND 5 pipe .model 702-0076 Rear l!~nge mounted work lights Frame'mounted back up lights Boom mounted work lights (2)--~ ~ M~ d body work lights Water pump area work light Level wind guide work Optional work lighting · Allows for greater visibility TWO PIPE IN TttlS LOCAIION MO08 OlqODZ3J3f 0~'f X 0I 168.00 CT -- 425.66 [55'-6 .5/4"] --[~N r'XT ASSEMBLY MC: -O.AWN DATE CITY OF ELK RTB 10- 16-02 RIVER, MN SCAt E WEIGHT o.o~=~ LB V311 LHAE/1 500 o~E~. co,,E 1500 GALLON WATER ErFEci~vE: wm SYSTEM 701B04 -£ONI 09 YARD Iwc-c~; 10 fit ]ELE BOOM 7tl-4655 170.00 STERLING LT7501 t68.00 CA 35'-8" DRAWN DATE MC: I NE)Q' ASSEMBLY ~-~,, ~o_~_o~ v~o~_~^~-/~oo V. ZlC-CDN SCALE WEIGHT 0.0,3=1 LB GREEN COVE SPRINGS, FLORIDA USA EFFECTIVE WlIH VAC-CON SERIAL NVMl~l~ii 701 B0265 In~ rO :-( ((dt :5[jl"l::'L I i ) f ' ~ '"t:[,E:I:'II 1'7- Eft: '~ .~L?,. I.;'.L,'Z,ff :.I,11 ' '-'?11 :I_F1FI IIIIII[')FF' Id I ''Ff'EF'III"~ (,E_~L) i. IIIIC-CBN