5. HRSR 06-26-2006item # 5.
ver
MEMORANDUM
TO: Housing and Redevelopment Authority ~ ~j
FROM: Heidi Steinmetz, Assistant Director of Economic Development ~-''I
DATE: June 26, 2006
SUBJECT: Downtown North of Highway 10 Redevelopment Plan Update
Attachments
• Work Plan Adopted by HRA in November 2005
• Sub-Planning Area 4 Financial Modeling Template, May 10, 2006
• Preliminary Gap Analysis, Ehlers & Associates, June 16, 2006
Purpose of Memorandum
The purpose of this memorandum is to accomplish the following:
• Discuss with the HRA how redevelopment financial modeling works and how it can
be used in the redevelopment land use planning process
• Gather the HRA's input regarding the physical boundaries of the financial modeling
template's sample land use concepts
Project Purpose and Background
Purpose of Redevelopment Plan
The purpose of the Downtown North of Highway 10 Redevelopment Plan is as follows:
• State Statute 469.028 requires a redevelopment plan to be completed, and approved
by the Council, prior to commencing redevelopment actions.
• A formal plan creates a consensus (City boards and commissions and citizens) for
future actions.
• The plan will serve as a redevelopment guiding document for staff and other City
boards and commissions.
Downtown North of Highway 10 Redevelopment Plan Update
June 2G, 2006 HRA Meeting
Page 2 of 3
Project Background
Below is a summary of the HRA's redevelopment planning activities for the area:
• Project purpose was defined and the attached work plan was developed
• Several previously prepared analyses, plans and other documents were collected
including the Interregional Trunk Highway (TH) 10 Corridor Management Plan, a
Market Analysis, a Historical Significance Analysis, a Building Condition Analysis,
the Elk Rive Comprehensive Plan, the Elk River Transportation Plan Update
• HRA developed a Strengths, Weaknesses, Opportunities and Threats (SWOT)
analysis for the area
• Policy goals and strategies were drafted as part of the redevelopment plan
• The attached financial modeling template was developed to begin testing the
financial feasibility of sample land uses in Sub-Planning Area 4.
Financial Modeling
What is financial modeling?
Financial modeling is a method to test the financial feasibility of sample land use concepts.
This is a starting point for testing the financial feasibility of a redevelopment project. A
financial modeling template is meant to test the first in a series of land use concepts for
redevelopment.
What is the purpose of financial modeling?
Financial modeling assists city planners to develop land use concepts based on the financial
feasibility of a project. Land use concepts are meant to be refined as financial modeling
concepts are refined.
How will financial modeling be used for this project?
Financial modeling will be used to help determine the following:
Cost estimates for a redevelopment concept
Estimated Tax Increment Financing (TIF) for redevelopment
Estimate of the financial gap between costs and TIF
Preliminary Redevelopment Gap Analysis
Summary
The attached preliminary gap analysis indicates the different ranges of financial gaps that
would need to be filled, whether it be through TIF, grants, low-interest loans, etc., in order
to make the sample land use concepts feasible in Sub-Planning Area 4. For instance, the
financial gap for the current Downtown Revitalization Project was filled by the usage of Tax
Increment Financing TIF, reducing the sale price of the land and deferral of SAC and WAC.
Redevelopment is a complex and expensive process in which property is most often
purchased at above market value prices even though the buildings will be removed.
S:\Downtown North of Hwy 10\Memos\2006\G-2G-OG.doc
Downtown North of Highway 10 Redevelopment Plan Update
June 2G, 2006 HRA Meeting
Page 3 of 3
The gap analysis reflects the following land/assembly costs:
• Land acquisition
• Demolition
• Relocation expenses
• Soft costs
Gas analysis assumptions and disclaimer:
The amount of TIF estimated to be generated in the analysis assumes that the developer
would receive 90% over 25 yrs. and also assumes that the area meets statutory TIF
substandard tests. The analysis does not include the incorporation of parks, amenities,
infrastructure, or market feasibility.
What does the preliminary ag p analysis mean?
The analysis indicates that there are significant financial gaps to be considered as the HRA
moves forward in its redevelopment planning process. Options for reducing the gap
include:
• Availability of other financial resources
• Changing the land use concept or densities to push for higher values
• Consider options for reducing land assembly costs
Action Requested
Staff identified certain properties to be included in the financial modeling template's sample
land use concepts and assumed which properties may be best suited as part of a preliminary
redevelopment concept. Staff requests the HRA's input on the preliminary areas identified
in the concepts and whether any properties should be added or deleted from the preliminary
concept.
Next Steps
Based on feedback from the HRA at this meeting, staff will present the following
information next month:
• A refined financial modeling concept for Area 4.
• Land use concept based on financial modeling and past studies
• Financial modeling concept for Area 3
Upon review and acceptance of the above, it is anticipated that a preliminary land use
concept will be ready for review by stakeholders (Neighborhood (Business & Residential),
Planning Commission, Heritage Preservation Commission, Park & Recreation Commission,
Economic Development Authority and City Council) this fall.
S:\Downtown North of Hwy 10\Memos\2006\6-2G-OG.doc
fiver
Downtown North of Hwy 10 Redevelopment Plan
Work Plan Outline
Adopted by HRA in November 2005
I. Refine Purpose & Primary Goal
A. Discussion: "Are we attempting to extend the downtown area and reestablish a second
downtown area or is it appropriate to view the area as something else?"
B. Review property inventory including property valuations
C. Check-in with City Council for agreement on purpose and primary goal, and
authorization to proceed with work plan
II. Refine Policy Goals & Strategies
A. Land Use
B. Design & Regulatory Issues
C. Economic Development
D. Property Acquisition
E. Rehabilitation
F. Transit/Traffic Consideration
III. Modify the Generalized Land Use Concept
IV. Test Desired Land Uses for Economic Feasibility
V. Modify Land Use Plan and Review with Stakeholders
A. Neighborhood (Business & Residential)
B. Planning Commission
C. Heritage Preservation Commission
D. Park & Recreation Commission
E. Economic Development Authority
F. City Council
VI. Develop Phasing Schedule & Priorities
VII. Finalize Land Use Plan
VIII. Adopt Redevelopment Plan and Authorize Implementation
S:\Downtown North of Hwy 10\Goals Sc Strategies\Work Plan.doc
•
r ~ ~ °tg
` ~, 3t
;~ i
Y
~_
c~~,~g
°!
~~
Yfz ~..... _ ...~
"~"
9
z,
P y°
~ ~ ~
~` .
~~
y
-~,
"~ ,
•
~.~"
,:
~ "~
,`;`~
•
A W N+ O C W O
3<<< o ~ ~ ~., ~~a
> o
(D N fD
O O O O A m
o O
of
N
o .y~
171
0~ A A co o A C H
~~~~ - _ - z
'm sss <' m
~ d d d ~ - (n
O W
O W - fD
e+. A A A m A Z
d 'O 'fl 'fl A • O O N • "~
mmm S
a - °.
~ 0 0 0 ,
=
~o~~
O
o
0
0
o
~~?
3 F
ma
w ? 0 c
`
aocfD
~
mg~ci
W tll N 7 ~ ~ ~ JO j
V b ~ 4 ~ ~ A ~
y O) •
d ~~
N
°
~° O O D7
~ ~
3
o
o
c C °c
> >, to
'. a
~
~,
w
c
"~' j pWj J O
J ~ ~
coo ~ N
r'
JW N S t ,'_
A [ ~S O N
O N
III, r-II: r~lli t
W ~ O ~ J
A _
~ -I
N N fs
~ m
~ !.. N (NT
~ O t0 E N
A rn m
•
d y y ~ d ~~
~
y N N N
a o m a o m a o a
m
W
• N p
....
O
N
Sp
N
m
o
YI 01
N
G
~ 0 to
c m ~
~ O O
~ m f 00
~ O
c~ C7 W
O
~ O Vl
~
~
~ ~ m
~ n m ~
~ 'n m ~ c
~
~ 'n m
o o
'~ °1 -
o O D ~ '~ p1 v ° D ~ '~ °' v o D ~ °i -
o O D
~~ ~ u~i
~ A `° m ~~
~. W m m m~
O N `° m n m
~ ~
L1 ~ d
m o a
N ~~
d
t~ ~ ~ N y
m c 'o
~
N N O
d
D ,~ G7 ~ y
w _. v
N_
N D~
A d
'm ~ G7 N y
m o v
N » J
d
[~ ~
O N
W ~ N
d
Oo O 0 IG IG
N ~ YI
~ N
~
.. ,y O O N O ~ N
' N
Fp
O p O U O O N
~ N
~ N
d
N O G (O (O
S
.. D o c
J C' c o S
~ ~~ c c o S
~
p N' c N~
(/)
~ ~
• ~ ~ T .-. . 7 1 p
~ N ~ m o0 . ~ 1
•i N ~ T ~ f/1 7 ~ ~
• ~ V T
m m m m
~ n ~ n ~ n ~ ~
.O N V N a N "O N
`~ UI N "' ` "' N
~
i ;i k
. 3
f
? a~. N ~ W ~ ~ ~ ~ `
W K A 4 w +y 3 ~ f
~ A k~
:. `
W " ; f ~ ? ~ ~' ~ k~' .~!" W ~ ~
~ ~~ rt ni ,.* r?I ? '
I . '. NO .