Loading...
3.7. SR 08-18-2008REQUEST FOR ACTION To Item Number Ci Council 3.7. Agenda Section Meeting Date Prepared by Consent Au ust 18, 2008 Ter Maurer, Public Works Director Item Description Reviewed by Approval of a Supplemental Agreement for Watermain Bryan Adams, ERMU General Installation on Sherburne County Road 40 (Cleveland Avenue) Mana er Project Reviewed by Lori ohnson, Ci Adminstrator Action Requested Approval of an increase in price for the watermain installation on the County Road 40 project, due to increased material costs. Background/Discussion The original bid for the watermain installation on this project was $90 per lineal foot. Due to continued consolidation of unsuitable soils under the road, the watermain in the area of the surcharge has not been able to be installed as of yet. Due to increased material cost over the last year, the contractor is requesting an additional $8.83 per lineal foot. Bryan Adams, General Manager of the Elk River Municipal Utilities, has reviewed this request and verified that the cost is reasonable. He recommends approval of this requested increase in watermain installation costs. Financial Impact The City is paying for the installation of this watermain in an agreement reached with the Elk River Municipal Utilities. The City's method of recovering this cost in the future would be assessments to developable property in this general area. The increase of $8.83 per lineal foot is estimated to have a total increased cost of $11,258.25. Attachments • Supplemental Agreement No. 3 (City is only responsible fox water main costs) Action Motion by Second by Vote Follow Up S:\EngineexImprovPxoj\2008 Improvement Projects\Co Rd 40 Watermain cc memo.doc STATE AID FOR LOCAL TRANSPORTATION SUPPLEMENTAL AGREEMENT June 2008 Page 1 of 3 County of Sherburne Supplemental Agreement No. #3 FEDERAL PROJECT NO. STATE AID PROJECT NO. LOCAL PROJECT NO. CONTRACT NO. SP 71-596-04 CP 71-640-02 CONTRACTOR NAME ADDRESS CITY STATE ZIP Dresel Contracting 24044 July Avenue Chisago City MN 55013 LOCATION OF WORK: TOTAL SUPPLEMENTAL AGREEMENT AMOUNT CR 40 from CSAH 12 to CSAH 13 (City of Elk River) $336,381.59 This Contract is between the Local Government Entity and Contractor as follows: Whereas: This contract provides, among other things, for the Grading, Aggregate Base, Concrete Curb & Gutter, Storm Sewer, Bike Path, and Bituminous Surfacing on County Highway (CH) 40 between County State Aid highway (CSAH) 12 to CSAH 13; and Whereas: The contract documents required the contractor to place a surcharge on a portion of the road to consolidate the poor soils; and Whereas: The poor soils did not reach consolidation during the 2007 construction season as indicated in the contract documents and will need to be in-place through the 2008 construction season to continue the consolidation of poor soils; and Whereas: The continuation of the surcharge requires the contractor to perform the remaining work beyond the 2007 contract completion date as stated in the contract documents; and Whereas: The contractor has requested an adjustment to the unit prices for the remaining work which includes, removing surcharge material, directional drilling of water main, furnish and install class 5 aggregate base, and pave the remaining portion of the road; and Whereas: The contractor placed additional select granular borrow on the surcharge during the month of June, 2008 to continue the consolidation of poor soils; and Whereas: The contractor has requested additional payment for the placement of select granular material on the surcharge after receiving payment at contract unit bid price in pay request #12; and Whereas: The contractor requests a mobilization payment for the placement of select granular borrow and for finishing all remaining work. NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: 1) The contractor has agreed to perform all the remaining work in accordance with the Plans and Specifications of the original contract and all work shall meet the requirements of the MN/DOT specifications. 2) The contractor agrees to perform the remaining work at the adjusted unit prices as shown in this supplemental agreement. The unit price for each item shall include all materials, .labor and equipment necessary to complete the work. 3) The contractor will not make claim of any kind whatsoever for any other expenses which he may have incurred or which he hereafter incurs, in performing the work and furnishing the materials required by this agreement STATE AID FOR LOCAL TRANSPORTATION June 2008 SUPPLEMENTAL AGREEMENT Page 2 of 3 Estimated Costs for Remainina Items Original Contract Unit Prices *Fund Cat. Item No. Description Unit Unit Price uanti Amount Local 2105.501 Com. Exc. CY $2.50 6,800 $17,000.00 Local 2211.501 Class 5 Agg. Base Ton $8.65 3,460 $29,929.00 Local 2357.502 Bit. Mat. For Tack Gal $2.75 390 $ 1,072.50 Local 2360.501 SP 12.5 Wear (3,B) Ton $44.00 1,070 $47,080.00 Local 2360.501 SP 12.5 Wear (3,C) Ton $53.50 1,070 $57,245.00 Local 2504.603 16" WM Dir. Drilled LF $90.00 1,275 $114,750.00 $267,076.50 Estimated Costs for Remainina Items Adjusted Unit Prices *Fund Cat. Item No. Description Unit Unit Price Quantity Amount Local Note 1 2021.501 Mobilization LS $7,000 1 $ 7,000.00 Local 2105.501 Com. Exc. CY $6.20 6,800 $42,160.00 Local Note 2 2105.522 Select Gran. Borrow CY $9.75 1,192.91 $11,630.87 Local Note 3 2105.522 Select Gran. Borrow CY $7.40 1,192.91 ($ 8,827.53) Local 2211.501 Class 5 Agg. Base Ton $10.50 3,460 $36,330.00 Local 2357.502 Bit. Mat. For Tack Gal $3.00 390 $ 1,170.00 Local 2360.501 SP 12.5 Wear (3,B) Ton $53.00 1,070 $56,710.00 Local 2360.501 SP 12.5 Wear (3,C) Ton $60.00 1,070 $64,200.00 Local 2504.603 16" WM Dir. Drilled LF $98.83 1,275 $126,008.25 $336,381.59 Estimated Increased Amount $69,305.09 Note 1: Added for remaining work. Note 2: Contractor requests additional payment of $2.35 per CY for an adjusted unit price of $9.75 per CY. Note 3: Payment to select granular borrow was made in Pay Request #12 at a unit price of $7.40 per CY for a total amount of $8,827.53. r STATE AID FOR LOCAL TRANSPORTATION June 2008 SUPPLEMENTAL AGREEMENT Page s of s Approved by Sherburne Approved by County Contractor. ~ / Engineer: f Print Name: ~i-I•pl~lL7J1 F. ~ Print Name: ~~Sit ,/~e S ~ Date: g Z. ~ Phone: Z ~{>~ Date: 8 r2 t9g Phone: G~/'~~-~'y~~ Approved by City Elk River: Print Name: Print Name: Date: Phone: Date: Phone: Original to Project Engineer; Copy to Contractor Once contract has been fully executed, forward a copy to DSAE for funding review: The State of Minnesota is not a participant in this contract; signing by the District State Aid Engineer is for FUNDING PURPOSES ONLY. Reviewed for compliance with State and Federal Aid Rules/Policy. Eligibility does not guarantee funds will be available. This project is eligible for:. _ Federal Funding _ State Aid Funding -Local funds District State Aid En ineer: Date: