Loading...
5.0. SR 04-30-2001 Item 5.0 Street/Park Department Discussion Agenda o PERSONNEL a. Maintenance I Worker in Lieu of Laborer b. Office Service Worker c. Mechanic Hire in January 2002 d. Summer Worker's Update ROADSIDE MOWER a. Changes from Mower Attachment to Tractor with Mower b. Receive Bids MECHANIC AREA a. Meet City Needs for 10+ Years b. Use Extra Space Now to Service ERMU Vehicles c. Sprinkler System Requires 6" Water Main from Proctor Road BREAK ROOM MOVE AND EXPANSION a. Present Break Room is Maxed Out b. Larger Break Room can be used for Meetings or Training c. Office Furniture for Reception Area AREA MASTER PLAN Discussion of Staff Concepts Cold Storage Building for 2002 Salt/Sand Storage Building for 2002 MEMORANDUM Item 5.0 TO: FROM: DATE: SUBJECT: Mayor and City Council Phil Hals, Street/Park Superintendent April 30, 2001 Street/Park Discussion PERSONNEL The Street/Park Department has a vacant position for a Laborer that was identified in the 2001 budget. I would ask for City Council approval to hire a Maintenance I Worker instead of a Laborer. In the short term a part time "summer" worker could fill the Laborer position. Our needs for a Maintenance I Worker will be increased because of an anticipated 12 week maternity leave for one of our employees. Hiring a Maintenance I person now would fill the need for a summer worker immediately while allowing us to have another trained operator ready for an additional snowplow route this coming fall. Last November, when we did the interviews for the Maintenance I position, we had a person who finished a very strong second place. If the Council would permit me to hire for the Maintenance I position instead of the Laborer position, I would ask permission to offer the job to the previously interviewed second place candidate. The wage I would recommend is Pay Grade 8, Level A or $12.44 per hour. The funds for this position have been budgeted at a Laborer rate but the later hire date should more than compensate for some of the higher recommended wage. OFFICE ASSISTANT I A position for one part time Office Assistant I was provided for in the 2001 budget. I would request City Council approval to advertise for this position. I plan to have two part time office workers job share because of the increased workload. MECHANIC Our shop move and expansion would take the better part of the summer, so I would propose that we use present employees to fill the need for the third mechanic on a temporary basis until early winter, then advertise and select the third mechanic to be hired on January 1, 2002. .PART TIME SUMMER WORKERS Case Hayward from the Ice Arena would transfer to the Street/Park Department from May to October with a primary duty assignment of mowing turf grass. · Darwin Schuur would return for two or three days per week for six months and be assigned to mow turf grass. · Sara Hopko, a college student who has worked for the Street/Park Department for the past three years, would return to maintain the athletic fields and flowerbeds. · Jeremy Pipenhagen worked last summer as a Street/Park part time summer worker and would like to return for the summer as a Park Laborer/Mower Operator. · Paul Kohler has worked the past few years as a Park Mower Operator (athletic field maintenance) and would like to return for 20-25 hours per week. · For a complete summer crew we would need two more summer youth. ROADSIDE MO WER On January 8, 2001, the City Council approved the purchase of a 20' 6" Diamond Boom Roadside Mower for the price of $44,730, including sales tax. As the Council will recall, this was an attachment with a separate engine drive, for our front-end loader. Recently, Doyle Equipment offered to sell us a two-year-old tractor with 1200 hours and a new 20' 6" boom mower for $47,000. Including sales tax, the total comes to $50,055 or $55.00 over the dollar limit to purchase by quotations. In my opinion, the city would be better served to purchase the mower and tractor for the additional $5,325. If the Council agrees with this recommendation, I would ask permission to go out for bids, hoping that by the time we receive the bids the State Legislature would eliminate the sales tax on municipalities. Funds would come from Council Contingency. MECHANICAL SHOP MO VE Our present mechanic's area consists of two shop bays approximately 20 feet wide and 55 feet long. Each has an overhead door and one has an in-ground, automotive size, 2-port hoist. For an efficient shop, each mechanic needs two bays. One for the quick fix (or in an out repair) and one for the long term repair, where a machine may be disassembled for several days waiting for parts to be delivered. Street/Park Department staff is recommending a relocation of our mechanic's shop to the western end of our building. By cutting in four new doors, moving our existing hoist, adding another hoist, and making the other listed modifications, we can have six functioning mechanic's bays. This mechanic's shop should handle city needs including the municipal utilities for at least the next ten years. $70,000 for this improvement can be drawn from the Street Reserve Fund and $10,000 from the 2001 General Fund. MECHANICAL SHOP MO VE Dig out/move/install used hoist **Purchase/install new hoist Lighting Air line plumbing/booster tank Electrical needs Plumbing - Add 1 1/2" water to west end Office/parts room improvements Air Exchange Concrete & Bituminous Add 4 Shop Doors Oil Supply Reels - 5 ea. Subtotal Contingency Fund - Additional 10% Total ** Hoist is funded in 2001 General Fund Budget $5,000 10,000 3,000 1,500 3,000 3,000 1,500 5,000 5,000 25,000 10,000 $72,000 8,000 $80,000 BREAK ROOM Our present break room is about 12' x 24" and is maxed out with our 14 full rime employees. We have a mezzanine area above the offices in the east end of our shop that has been used for storage. Staff recommendation is to convert this 24'x50' area into a break room with a kitchen sink, air conditioning, and equipment so it could also function as a training room. Along with the break room improvements, I would further like to request a workstation and files for the Street Department Office Assistant. That equipment will cost about $3,000. Funding for this improvement could be drawn from the Street Reserve Fund. BREAK ROOM Upper & Lower Cupboards 10-15' 1,000 4 Windows Cut in Wall 1,600 Flooring 1" Leveling/Commercial Floor Tiles 1,500 Metal Staircase 1,000 Metal Walk Doors 1,200 Metal Stud Wall Framing 2,000 Sheetrock Install/Taping/Sanding 2,000 Additional Electrical 1,500 Plumbing - Set Sink/Faucet/Drain 9,000 - Furnace/Air Conditioning Upgraded 16,000 Painting 200 5 or 6 - 8' Folding Tables 500 24-32 Chairs 500 Overhead Screen 150 Bookcase 150 Subtotal $38,300 Contingency Fund - Additional 10% 3,700 Total $42,000 Office Furniture for Office Mssistant I (desk &files) $3,000 NEXT YEAR - 2002 The Public Works Area Master Plan includes a 14,000 square foot cold storage building, a new winter salt/sand storage building, relocating some electrical feeder lines, refencing the yard area and expanding the yard into the area now used for Oak I~noll Ball field III. We are in the process of constructing two baseball fields at YAC that will replace the Oak IYmoll field. We are also considering options for the brush and compost drop-off site. The volume of material that is dropped off has far exceeded our wildest projections so we need to make improvements that will help reduce the time and equipment that we now commit to recycling. Some of these ideas are shown on our Public Works Area Master Plan. ACTION REQUESTED · Permission to hire the Maintenance I person from last fall's interview process. · Permission to advertise for a part time Office Assistant I. · Permission to re-hire two former part time employees, hire two former part time summer workers, and hire two new additional part time summer workers. · Permission to accept bids for a roadside mower and tractor. · Permission to spend up to $80,000 for shop improvements. · Permission to spend up to $42,000 for break room improvements. · Permission to spend up to $3,000 for office furniture for the Public Works Office Assistant. I I