5.1. SR 03-11-1996'ity of
iver
ITEM 5.1.
FROM:
DATE:
SUBJECT:
MEMORANDUM
City Council
Stephen Rohlf, Building and
Zoning Administrator
March 4, 1996
Environmental Review Regarding
Hillside Crossing II (Menards)
ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW)
When the EAW was done for Hillside Estates, it included all lands
shown as shaded on the attached map. It did not include the Super
America site (this site was not in the control of the developer of
Hillside) and it did not include the first phase of Hillside Crossing
(preliminary plat was approved prior to the EAW). The cumulative
impacts of Super America and the first phase of Hillside Crossing
were, however, consider in the EAW under "Related Developments".
Attached, is a letter from Greg Downing of the Environmental Quality
Board confirming this interpretation.
The estimated commercial acreage in the EAW was 37 acres. The
project now includes 42 acres of commercial land (+5 acres). More land
than anticipated was zoned commercial.
The estimated square footage of commercial development in the EAW
was 206,800 sq. ft.. The project now includes an estimated 335,000 sq.
ft. (+129,000 sq. ft.).
COUNCIL OPTIONS
The increase in the project's acreage and commercial square footage
does not automatically require that the EAW be redone. As the
Responsible Governmental Unit (RGU) it is the Council's decision.
If the Council finds that the larger project size significantly
increases the potential for significant environmental impacts, you
should pass a motion requiring that the EAW be redone.
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425
Page 2
If the Council finds the larger project size does not significantly
increase the potential for significant environmental impacts, you
should pass a motion declaring the previous EAW adequate.
RECOMMENDATION
Staff feels no new issues would arise if the EAW were to be redone and
little would be gained. Staff is recommending that the EAW not be
required to be redone with the finding that all environmental issues
involved with the project were identified and addressed during the
original EAW process and a negative declaration regarding the need
for an Environmental Impact Statement would still result.
o
INDIRECT SOURCE PERMIT (ISP)
An ISP is a permit required by the Minnesota Pollution Control
Agency (MPCA) that considers air quality issues. The city as well as
the developer would be the permittees.
Because the Hillside project is located within 1/4 mile of a major
highway the thresholds for when an ISP is required are as follows:
When the number of parking stalls proposed within a phase of a
project makes the total number of parking stalls for that and all
previous phases total 1,000 or more stalls, an ISP is required.
· When any one phase of a project includes 500 or more parking
stalls, an ISP is required.
The ISP thresholds only consider commercial and industrial parking,
not residential. Further, the project being considered for an ISP is
Hillside Estates, as identified in the Hillside Estates EAW. Therefore,
Hillside Crossing's (the first phase) and Super America's parking
should not be considered when calculating the ISP thresholds.
However, if and when an ISP is required, the impacts of these projects
as well as previous and future phases on lands included in the Hillside
Estates EAW must be considered.
Menards' receiving and loading areas should not be considered when
calculating parking for the ISP threshold. Neither should space for
future parking until it is proposed to be built. Lastly, the future
s:\b&zksteverXhill-en2.doc
Page 3
commercial lots shown as outlots on the Hillside Crossing II plat
should not be considered when calculating the ISP threshold until they
are proposed to be buildable lots.
Staff and the developer met with a representative of MPCA to help us
understand these rules and show him the particulars of the project.
Attached is a letter from MPCA staff member Innocent Eyoh
summarizing that meeting.
ISP CONCLUSION
The number of parking stalls proposed on Lot 1, Block 1, Hillside
Crossing II (Menards) is 410 stalls. This is the total for this current
phase. To date, the total number of parking stalls from this phase and
all previous phase on lands included in the Hillside Estates EAW is
624, which includes Hillside Crossing South.
· In conclusion, an ISP is not required at this time.
NOTE: Elk Park center was required to do an ISP at the front end of
their project because the platted lots in their first phase exceeded 500
parking stalls in a single phase.
s:\b&zXstever\hill-en2.doc
Cheryl R. Becker
11452 197th Avenue
Elk River, MN. 55330
Planning Department
Elk River City Hall
PO Box 490
Elk River, MN. 55330
RE: P96-1 Project (Mennards)
Attention Debbie Kleckner, Steve Ach, and Council, members,
I would like all this information to go into the packet for
the council members for the March 11, 1996 meeting concerning the
P96-1 Project.
I was at the public hearing on Feb. 27th regarding this new
project and had to think about all that was happening. My back
property line is the same property line for the project. My home
sits off the south~side of 197th, half way along~the back property
line and only 30 f~et from the back property lind.
I own and operate my licensed daycare business out of my home
and have done so f~r 10 years. These are my concerns:
1. The state wilt ~equire me to put in a fenc~ Along my back
property line for the safety of the children.
2. Since a sidewalk along the "PARK" will be put in, I am concerned
with strangers walking along with access to ~y property and it
isn't safe with child abductions and children wandering off or
following people.
3. I need it quiet for nap times and I want the children to be
able to play in the back yard safely without the worry of them
disappearing.
4. The school bus'stops at the end of my driveway 5 different
times during the school day to pick up and drop off 5-6 children.
I am concerned with their safety with the increased traffic flow.
5. For myself and family I will no longer be able to have a
barbeque or sit on my deck with privacy and people can look in
and see what I have with easy access to the property therefore
I feel I am in jeapardy with burglaries, and crime, and vandalism.
I would have not purchased no~ built here if I knew this commercial
developement was coming in. It will decrease my value and oppor-
tunities to sell when that time comes. As a homeowner, I was here
first and all these changes in zoning occured after. I am asking
the developers and council to work with me and feel for me and help
me in this situation.
Here is what I am asking:
1. I would like to see a larger buffer of trees left so myself
and neighbors do not have to look at backs of buildings, dumpsters,
parking lots and parked cars. Do not cut away the trees along the
property lines of the project. We as residential home-owners were
here first and hate to see beautifUl hardwoods torn down.
2. I would like an 8-9 foot privacy fence put up along my back
property line for consideration of my privacy that is being taken
away, for the property value itself, and for my daycare business
that is being infringe~ upon and for safety and crime. I am asking
that this expense to not come out of my pocket.
3. I do not want to,be charged any assessments on a sidewalk or
any others that would develope f~m this project.
I am a single mom with 3 children and maintaining the home, raising
my children and running my business on my own. I do not have the
resources of funds available to put up this privacy fence or pay
assessments. THIS PROJECT WOULD CAUSE ME SEVERE HARDSHIP FINANCIALLY
AND EMOTIONALLY WITH WORRY FOR THE CHILDREN IF I HAD TO PUT UP THIS
FENCE OR PAY ANY ASSESSMENTS. This would be impossible to afford
as the property owner and could force me out.
I a~ not against this project but I do feel they owe me for the
changes of my family, property, property value,privacy and for my
business which is my only source of income. I see they are working
with the other homeowners affected by this so I am asking for help
also.
I plan on being at the March 11 meeting but I run a very busy
schedule with my 3 children and my daycare hours.
Sincerely and very concerned and
worried,
"
'71.
t'
May 24, 1994
Mr. Stephen Rohlf
Building and Zoning Administrator
City of Elk River
P.O. Box 490
Elk River, MN 55330
RE: Hillside Estates
Dear Mr. Rohlf:
This letter is in response to yours of May 16 regarding
interpretation of the EQB rules relative to the Hillside Estates
project.
As I understand the situation, the developer originally owned a
parcel for 73 residential lots and 13 acres of commercial
development, and received preliminary plat approval on the whole
parcel and final plat approval on part of the residential
portion. Then, the proposer obtained an option on adjoining
land, which has not yet received any plat approvals. At an
earlier date, the proposer built 61 lots in an adjoining
development, CherryHill Bluffs. Finally, the proposer wishes to
trade part of the 13 acres of the commercial land that received
preliminary plat approval to another developer and to add one
acre of the newly optioned land to the remaining commercial land.
The questions being asked are what is subject to an EAW, and how
should other lands be treated in question number 30 of the EAW?
I believe that the lands subject to the EAW is only the newly
optioned land, minus the one acre added to the existing
commercial plat. That is, the following parcels should not be
subject to the EAW: the 61 lots of CherryHill Bluffs; the 73 lots
in Hillside Estates; the commercial land in Hillside Estates,
including the traded off portion and the added one acre. In
responding to question 30, development on these adjoining lands
should be mentioned and any cumulative impacts addressed in part
d.
I hope this response adequately addresses your questions.
Sincerely,
Gregg Downing ~/
Environmental Review Coordinator
('.~ [llvIgOSM[Nlll llgAtlIY go,bo 658 CEDAll SIS[ET. SI. PLOT, MN 55155 612 296-2603 FAX 612 29G-3Dg8 STAFF PillOVID[ll BY E171 PLANNING
,Minnesota Pollution Control Agency
January 29, 1996
Mr. Richard C. Foster
Riverside Companies
19230 Evans Street, Northwest
Elk River, Minnesota 55330
Mr. Stephen Rolf
Building & Zoning Administrator
City of Elk River
P.O. Box 490
Elk River, Minnesota 55330
Dear Messrs. Foster and Rolfi
I am writing to clarify the discussions we had during our January 17, 1996, meeting regarding
the proposed Hillside Estates project in the city of Elk River. Based on our discussions and the
review of the Environmental Assessment Worksheet (EAW) prepared for the project, the staff of the
Minnesota Pollution Control Agency has concluded that the project as proposed, does not meet the
threshold requirements for an Indirect Source Permit (ISP).
The staff wishes to note, however, that when the total number of parking spaces for the
proposed project reaches 1,000 or more spaces, an ISP will be required. At that time, all
previously constructed parking spaces for the commercial property considered in the EAW must be
included when estimating the parking threshold for an ISP requirements. The loading stall area for
Menards Store should not be used when estimating the parking requirements.
The Hillside Crossings which was approved prior to the preparation of the EAW need not
be included when calculating the ISP requirements. Please call me at (612) 296-7739, if you have
any questions.
Senior Air Quality Specialist
Air Quality Division
IEE:lmg
cc: J. David Thornton/Barbara Jackson, Air Quality Division
Susanne P:,Spitzer/Mary Hoffman, Air Quality Division
520 Lafayette Rd.; St. Paul, MN 55155-4194; (612) 296-6300; Regional Offices: Duluth · Brainerd · Detroit Lakes · Marshall · Rochester
Equal Opportunity Employer · Printed on Recycled Paper