5.1. SR 03-12-1996ITEM 5.1.
'ity of
E
River
MEMORANDUM
TO:
FROM:
DATE:
SUBJECT:
Mayor and City Council
Steven B. Ach, City Planner~.~
March 12, 1996
Comprehensive Transportation Plan
and Transportation Element of
Comprehensive Plan
Issue
The City Council is asked to consider the Comprehensive Transportation
Plan and Transportation element of Comprehensive Plan..
Overview
The Planning Commission reviewed the Transportation Plan at a February
15, 1996, public hearing meeting. At that meeting, some letters and petitions
were distributed the Planning Commission regarding the Transportation
Plan. All of this information is included in the Council packet.
The City Engineer, Terry Maurer, will be present at Tuesday night's meeting
to present the plan and provide responses to some of the issues raised at the
Planning Commission public hearing.
Transportation Element
As part of the comprehensive plan, a Transportation element is included
summarizing the entire Transportation Plan. The Council deferred action on
this section of the Comprehensive Plan until the Transportation Plan was
adopted.
Recommendation
The City Council will be asked to consider adopting the Comprehensive
Transportation Plan as presented by the City Engineer or modified per the
City Council's request.
s :\council\tr~nsp or .doe
13065 Oron~)--Pai:k-~ay .-P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425
SPECIAL MEETING OF THE ELK RIVER PLANNING COMMISSION
HELD AT ELK RIVER CITY HALL
THURSDAY, FEBRUARY 15, 1996
Members Present:
Members Absent:
Staff Present:
Chair Dillon, Commissioners Anderson, Minton, Sullivan and
Thompson. Commissioner Kuester arrived at 9:00 p.m.
Commissioner Tacheny
Steven B. Ach, City Planner; Terry Maurer, City Engineer, Stephen
Rohlf, Building and Zoning Administrator, Debbie Kleckner,
Recording Secretary
Pursuant to due call and notice thereof, the Special Meeting of the Elk River
Planning Commission was called to order at 7 p.m. by Chair Dillon.
Presentation by Terry Maurer, City Engineer. The Transpodation Plan is a long
range plan, which will be incorporated into the Comprehensive Plan, to handle
future growth in the city. The purpose of the study is identity corridors which
should be preserved for future roadways. The City of Elk River is working with
Mn/Dot, Sherburne County, and surrounding county, cities and townships. The
City's is actively working on a corddor study with Mn/DOT for Trunk Highway 10
and Trunk Highway 169 through the City of Elk River. Issues under consideration
include: which intersections should be closed, where new intersections should be
opened, where accesses to the highway should be consolidated, and where
signalization is needed at intersections. Terry Humbert, District 3 Planning
Engineer, has expressed Mn/DOT's full support of the City's work on the
transportation plan. The City has been an active participant in Sherburne
County's transportation plan. Terry Maurer submitted a letter from Dave
Schwarting, Sherburne County Highway Engineer to be included in tt~e official
minutes of this meeting. In formulating the Transportation Plan, staff has given
their best efforts to balance the issues of residential property, larger agricultural
tracts, environmentally sensitive areas and city park land in trying to choose a
corridor. A two lane road is being proposed, with some widening at intersections
for possible turn lanes. One exception would be roadway "E" located in the
central part of the City, which is the realignment of County Road 13. This area is
expected to have fairly high traffic counts and may require additional lanes.
Terry explained that staff feels all of the roadway connections shown on the map,
with a few exceptions, belong on the County roadway system. Following
completion of the County's transportation plan, a long range plan will be
considered for the County and the City to look at building these roads, as
necessary, and then for the City to take back some of the County roads that are
currently existing and will no longer function as a County road. An example is
Meadowvale Road which in the future should be under the City's jurisdiction.
Terry Maurer reviewed the roads on Figure 6 in the draft transpodation plan.
Chair Dillon acknowledged the Planning Commission has been contact by the
following individuals: Dave Anderson, Tom Wiley, Dick Hinkle, and Claire Olson.
Chair Dillon asked that a letter was received by Barb Northway to be added to
the official minutes of this public headng.
Chair Dillon opened the public hearing at this time.
lion Niziolek, 12275 liush Circle, read a letter from himself and Mike Niziolek,
asking the Planning Commission to pay special attention to the park system in
their consideration of the transportation plan.
Denise Henricks, 11337 205th Avenue, felt that if the traffic lights on Highways 10
and 169 were timed as they are in Anoka,, there would not be a transportation
problem in Elk River.
Claire Olson, 10476 205th Avenue, stated he felt the recommendations of the
Steering Committee to meet jointly with other entities on this issue were not
followed. Mr. Olson referred to comments published in the Star News made by
Mayor Duitsman which proposed a 4-lane east-west roadway. Mr. Olson
expressed his objection to the proposed road connection which would bisect the
golf course and city park. He asked who would pay for the road and who would
benefit from it. He felt only developers, mining companies, truckers and outsiders
passing through Elk River would benefit.
Scoff Brobeck, 13822 211th Avenue, reviewed information regarding proposed
average daily traffic volumes found in the transportation study. Mr. Brobeck
challenged the need for the proposed road improvements and felt the study did
not support a need for an east/west corridor.
Chris Kreger, 11661 225th Avenue, expressed his support for the transportation
plan. He stated a plan is a place to begin and that the plan must be flexible to
meet the changing needs of the city.
Greg Harriet, 196th Avenue, asked how much the improvements will cost, who will
pay, who will benefit, how much they will benefit, and if the improvements are
not made, who suffers.
Michael Sulvey, 15810 228th Avenue, Big Lake Township, stated he felt the east-
west corridor clearly benefits one or more companies that run the gravel mining
in this area. He expressed concern for increased gravel truck traffic. He stated
the people he spoke with from Big Lake Township have not heard anything about
the proposed east-west corridor. He felt the mayor has a major conflict of interest
since he has a son working for the gravel mining company that would benefit
from the east-west roadway. Mr. Sulvey stated there is going to increased
demand for gravel mining in Elk River, since other gravel pits in the area have
been mined out. He felt the corridor is not needed or wanted.
Ted Kolberg, 19153 Zebulon Street, expressed concern for the safety of children
biking and preserving the old oak trees. He felt the road is not necessary and
that the numbers don't add up to support it.
Bill Zacarda, 13446 Ranch Road, read a letter from Mark Martin and asked that it
be entered into the official record of the Planning Commission meeting. Mr.
Zacarda stated he feels the east-west can'idor will indirectly affect the quality of
life of all the residents of Elk River. He felt the taxes will increase and there will be
more demand for services.
Dick Hinkle, 13432 N~eadowvale Road, expressed concern for the City taking over
county roads due to cost for taxpayers. He stressed the importance of
government and residents showing respect for each other, as well as for property.
He felt enforcement of speed limits would help control the problem with gravel
trucks. He suggested that there could be an agreement with the gravel
companies to only run empty gravel trucks on County Road 32, such as there was
for Proctor. Mr. Hinkle stated that in approximately 1~270, MnDOT did a study to
skirt Elk River which would have cut through the back of his property, where 193rd
is now, along the railroad tracks and into to Big Lake. Mn/DOT backed away
because of the costs and decided to stick to the present system. Mr. Hinkle also
explained that the previous owners of the Woodland Trails Park land sold the
property to the City below market value, with the understanding that it would be
used as a park. He felt the character of the property would be ruined if a road
were put through between the park and golf course. Also, he did not want to see
the pond at County Road 1 and 32 destroyed. Mr. Hinkle stressed that in striving
for utopia, people must show respect for each other and for the land. Mr. Hinkle
concluded by saying he was proud of Elk River, the school system, and most of all,
of its people.
Robin Turtle, 13324 Ranch Road, submitted a petition with 3~21 signatures in
opposition of the proposed east-west corridor.
Arne Engstrom, 20800 Meadowvale Road, read the letter from Dave Schwarting,
Sherburne County Highway Engineer, in its entirety. He asked the Planning
Commission to consider the affect of the east-west corddor on the quality of life in
Elk River.
There being no further comments from the public, Chair Dillon closed the public
heating (8:30 p.m.).
Terry Maurer provided the following responses to comments and questions raised
during the public hearing:
What are the costs for the proposed roads.8
Since the transportation study is for "future" roads, it is difficult to estimate costs at
this time. The roads may not be built for some time and costs could change
considerably.
Who pays?'
Costs will likely be borne jointly by the City of Elk River and Sherburne County.
Roads will be consolidated where possible and grants will be pursued.
Who benefits from the proposed roadway system?'
The entire community benefits, as well as people traveling through and shopping
in Elk River.
Who suffers if the roads are not built?
The people in Elk River will suffer the most, padicularly those living on the roads not
designed to handle additional traffic.
Letter from County Hi.qhway Engineer
In speaking with the County Highway Engineer, Dave Schwading, and City
Administrator, Pat Klaers, it was Terry's understanding that Sherburne County is
looking at a connection of County 32 with Highway 169. They do not see a need
for continuation of a roadway through Big Lake Township and connecting with
Highway 10 at this time. Mr. Schwading stated that he does not expect the
County transpodation study fo be completed until Fall of 1996. Terry explained
that when the County study is completed, the City will review their plan to
determine the consistency between the two plans. Terry noted that the County's
study will be much more in depth and also the data will be more recent, since
the County staded their study in 1995. Mr. Schwading indicated they had hoped
to have the study completed in draft form in July, but since a key person had left
the firm they were working with, it would likely now be in the fall before a draft
was available.
Fi.qures discussed by Mr. Scott Brobeck..
Terry stated he was not able to answer Mr. Brobeck's comments about the traffic
counts, as he did not have those files with him and would need to check on
them. Terry noted that the reason for the increase in counts for the County Road
12 would be due to the improved access to Highway 169. Terry explained there is
very little that can be done to improve the congestion on School Street and
Proctor, and that this will always be one of the busiest areas in the City. Major
reductions in traffic counts would be made in the Meadowvale area. The
significant increase of 7,000 to 17,000 tdps in the County Road 13 area will
naturally occur, since it would become a major route to get across Elk River. The
Main Street and Highway 169 area will continue to be a bottlene,ck traffic
problem, since it is a major commercial area.
2 Lane Road/4 Lane Road
Terry stated the only area in which right-of-way of 100 feet is proposed is in the
corridor into the Woodland Trails Park.
Terry explained Sherburne County is planning to upgrade County Road 1 from the
"Y" area at Proctor, up to the golf course.
Will the City be takin.q over County roads?
Terry felt he could not answer until the county study was completed. The City will
be working with the County to determine if some roads may go under county
jurisdiction, while others currently maintained by the County will go to the City.
What can be done to miti.qate the split between the qolf course and the city
park if a road ,qoes throu.qh?
Terry explained that if a road is put through, there is no way to get around the
fact that it will split the two areas. Design techniques would be considered to
minimize the impacts such as a culvert under the road or a pedestrian bridge
over it to connect the two areas. Also, a "parkway" road design will be looked
at to soften the affects of the road.
When will Seqment C likely be developed?
The construction of this roadway will be development driven. The eastern-most
section would likely not be built unless the property became available for sale.
_Proiected population of 40,000 in 20 years
Terry explained he felt this figure was unrealistic and that it would take
significantly longer than 20 years for Elk River to ever reach this level of
development.
Chair Dillon expressed his feeling that the comment regarding Highway 10 was
MnDOT's problem was ill-served and that the City needs to be concerned about
this roadway, as it affects all its residents.
Commissioner Sullivan emphasized that the Transpodation Plan is a "long range"
plan and that it is not the intent the proposed roadways will be built anytime in
the near future. She added that the Commissioners are sensitive to the concerns
of the citizens that may be affected by the roads.
COMMISSIONER SULLIVAN MOVED THE PLANNING COMMISSION RECOMMEND
APPROVAL OF THE TRANSPORTATION STUDY, EMPHASIZING THAT THE CITY BE
SENSITIVE TO THE WOODLAND TRAILS PARK AREA AND ITS USERS, WHENEVER A
ROAD IS CONSTRUCTED TO LINK COUNTY ROAD 32 WITH HIGHWAY 169.
COMMISSIONER THOMPSON SECONDED THE MOTION. THE MOTION CARRIED 5-0.
Steve Rohlf introduced Dana Anderson, the newly appointed Chair of the Park
and Recreation Commission. Dana explained the goal of the Commission is to
maintain and enhance the natural characteristics of the City of Elk River and to
improve the quality of life for the residents and surrounding area.
Dana Anderson reviewed the 4 major components of the Master Park Plan as
follows:
1)
2)
3)
4)
Inventory of existing park areas
Proposed parks
Trail system
Community recreation fields
Dana explained the greatest need at this time is for youth sports fields. He noted
that the Cass property recently acquired by the City is proposed to be used for
youth fields. Dana felt that the key is using the Master Park Plan as a working
plan. He stated that the plan needs to be flexible and will need changing and
updating as development comes.
Chair Dillon opened the public hearing.
Kathy Specht, 16330 Highway 10, asked who owned the property in the circles
shown on the map of proposed park land/recreational fields. Steve Rohlf stated
that the circle designates an area the Park and Recreation Commission sees a
need for a park or athletic fields. Steve also explained that the property would
not be available unless it were developed or bought by the City.
There being no fudher comments from the public, Chair Dillon closed the public
hearing.
Commissioner Kuester commented that she felt the Park Plan was very easy to
understand and user-friendly.
COMMISSIONER MINTON MOVED THE PLANNING COMMISSION RECOMMEND
APPROVAL OF THE MASTER PARK PLAN AS PRESENTED. COMMISSIONER SULLIVAN
SECONDED THE MOTION. THE MOTION CARRIED 5-0.
There being no further business, COMMISSIONER THOMPSON MOVED TO ADJOURN THE
MEETING. COMMISSIONER ANDERSON SECONDED THE MOTION. THE MOTION CARRIED 5-
0.
The meeting of the Elk River Planning Commission adjourned at 9:45 p.m.
Respectfully submitted,
Debbie Kleckner
Planning Secretary
S.~._TATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
P.O. Box 370
3725 12th Street North
St. Cloud, MN 56303
Office Telephone: (612) 255-4181
Fax: (612) 255-3257
March 5, 1996
Scott Brabec
13822 211th Ave. N.W.
Elk River, MN 55330
RE: Elk River Comprehensive Transportation Plan
Dear Mr. Brabec:
Thank you for driving up to St. Cloud to meet with me regarding the Elk River
Comprehensive Transportation Plan. This letter will serve as a summary of what I
believe to have been some of the key points of our discussion. In some parts of the
letter I may have added information subsequent to our conversation to help clarify my
thoughts.
One question I had provided feedback on was the ability of the traffic assignment
model used by the city to show trip reduction on routes para/lel to the proposed
east-west corridor. My understanding of the traffic forecasting model used for the
Elk River study is that it was an "Ail or Nothing" assignment model. An "All or
Nothing" model will assign trips to the route which has the shortest trip time,
regardless of th.e, fact that the number of trips assigned to the route may eventually'
exceed the route s capacity and ultimately make it a less desirable route. An alternate
method would be to do a UCapacity Restrained" assignment model. A "Capacity
Restrained" process is an iterative process which would adjust the travel speeds on
route segments as they become congested. This process has the effect of diverting
trips off of heavily used routes and on to lesser used routes. Since the model used in
the study is an "All or Nothing" model, the trips being diverted to new or lesser used
routes may be understated since an "All or Nothing" model focuSses on where trips
want to go rather than their desire to avoid congestion. To get an understanding of
how these lesser used elements of the transportation system might work, the parallel
routes also have to be considered with regard to how much congestion they are
2
experiencing and the likelihood that trips would divert from these routes due to the
congestion. Thus, the trip assignment numbers shown in the Elk River model must
be considered with a more global view of how the transportation system in Elk River
is projected to work.
Another issue which we discussed was the role of Mn/DOT in providing
improvements to TH 169 and TH 10. Mn/DOT is aware of projected capacity
deficiencies on TH 169. Although our own projections don't show a capacity
deficiency on TH 10 within a 20-year time frame, a rapid rate of development along
TH I 0 could trigger capacity deficiencies. Although we recognize these potential
needs for capacity improvements, it is difficult for us to predict when these
improvements would be made due to uncertain funding and other needs within our
District. In the short term, we are developing plans to interconnect the signals on TH
· 10 and interconnect the signals on TH 169 to obtain better timing of the signals with
regard to traffic flow on the trunk highways. Mn/DOT is also working with Elk
River to develop plans for where future access to trunk highways should be so that
we can maximize the efficiency of the trunk highway for the through traveler while at
the same time proViding reasonable access for the land adjacent to the trunk highway
system. Keeping traffic flowing freely on TH 10 and TH 169 will help ensure that
the trips wishing to pass through Elk River will use the trunk highway system to the
greatest extent possible.
In summary I would like to reiterate the following points:
Mn/DOT supports communities developing transportation plans and
developing a system of minor arterial and collector routes to carry
local traffic. Such a development helps the trunk highway system by
reducing the demands of local access to the trunk highways. It also
results in a better quality of life for the communities residents who
have a more convenient system on which to make their intra-city
trips.
Mn/DOT understands and accepts that. capacity improvements may
be needed at some point in time on TH 169 or TH 10. Mn/DOT does
not view the east-west corridor as a replacement for improvements to
TH 10 or TH 169.
The determination of a local transportation corridor is the responsibility
of the local community. Mn/DOT has no jurisdiction over such a
decision. A local corridor decision should reflect the communities vision
and values and should increase the quality of life for the community, based
upon its vision and values.
Scott, I hope this letter will serve to clarify Mn/DoT,s role in the determination of
the east-west corridor. /f you have any addi~onal questions, please feel free to call
me at (612) 654-5520.
Sincerely,
Terrenee il./-/umbert, P.E.
Planning Engineer
3
C.'
$. Povich - Baxter ·
D. Schwarting/D. Cote - Sherburne County Highway Department
S. Ach/T. Mauer - Elk River
February 15, 199~
TO:
Tom Dillon, Chair
Elk River Planning Commission
Fax: 441.1596
FR: Barb Northway
592 Dodge Ave
Elk River, MN 55330
612/241.1789
RE: WOODLAND TRAILS PARK.
Dear Mr Dillon:.
I was recently made aware that the Planning Commission would be reviewing plans
for a possible roadway through the W
hope to address the Pp--,...~ .... Oodland Trails Park It ,-..,-, ,-- -
'~"'"~ ~-;omm~ssion at tonic~ ' . . ~ou~u. nave Peen my
oht s meet,rig, but work has ca/led
me out of the state. Please allow me to share my concerns for those plans with you
and the other Planning Commission members in this letter.
Elk River should be very Proud of it's development of the Woodland Trails p
and every year I have used the ark ·
the beautiful roil/n · P. , I have noticed tre . ark. Each
, r..~,-~u parking lot, f~//$ Park has no equal ° '"~ aoOUnd
I am a frequent visitor of parks throughout the state of Minnesota, including the
: Hennepin Country Park system. Woodland Trails has such character and drawing
_. power, I know many people who choose it over mos. t other Parks in the area. '
The placement of a roadway in the park would be devastating to the park and it's
users. It would disrupt the flow of the trails, Provide a substantial safety issue (how
do people .safely cross a road while using a trai/) and Would destroy a beautiful
WOoded green space.
/ u/~e you to be Protec~/ve o!our//m/te~f.~reen areas. My educatidn in recreation
reminds me that parks provide humankind with immeasurable benefits, certainly not
the least of which includes the opportunity to renew and escape from our stresS-filled
lives.
Thank you for this opportunity to address you.
Sincerely,
E~arb N/c~thw~
P.O. BOX ~8 · ELK RIVER, MN SS330
February 15, 1996
Pat Klaers, City Adm/nistrator
City Of Elk River
13065 Orono Parkway
P O Box 490
Elk River,/YIN 55330
RE: Transportation Plan. East/West Corridor
Pat:
On behalf of the Sherbume County Board of Commissioners, I am wr/t/ng to clar/f7 our position
concerning the above. I explained to the County Board at our
recommendation for addressing about the above corridor.'
concerns meeting on February 13th, 1996 my
In my op/nion, them is extensive 'usc[fi · '
safest possible roadwa .I. cauon to preserve ex/sd ·
area of the City ofE/k Y~ ~,o.? ~g~.aUon to move peoole and s-.-.-'n~-R:i.'ght'°,f'Way to al/ow for the
z nm is mam/y due to the ot ' a out of the west centr
number of accesses to major roads such as T.H. 10 and T.H.
be provided to service this develooing area. Unless add~t~ enual for development and the 1/m/te~
provided major traffic proble ~' ' 'onal local an ·
serious im~,~,., ..... :-, . ~ will develop on ex/st/ roadw _~ c.o. II.e:ctor corridors are .
· '""'-' ,-,~ ~ments aajacent to these c ~,~,~g _a_~s tha~ w~ll clemand eve
o ...... o. Connoting Count,, Ro--' °"- ~.mo?.
road to T.H. 169 is being considered in our Transportation Plan. Additional connections must be
developed to T.H. I0 due to the traffic already on County Road 44. v ,,u az w~m a z-lane
The data we have gathered to date does not support
from T.H. 10 (Big Lake Township) the justification for designation of a direct route
feasibility of this type of COnnection to T.H. 169. We will continue to include the study of the
County Transportation Plan. as more dam is ana/yzed during the Course of the Sherbume
The data collection phase of the'Sherburne County Transportation Plan should be completed by
March of this year. There have been set backs due to key personnel leaving the consulting firm
facilitating the $herbume County Transportation p/an, OSM, Inc We arecia
in this effort and look forward to developing the tools we need th~'ou h ~ pte your cooperation
possible decisions with the Citizens of °~- ~ ,-. - - g ' lan to make the best
work closely together in this planning effort.
aneraurne ~-ounty. It is essential that the City & County
Sinc-'erelyI
Dave Schwarting
County Engineer
* PHONE(612)441.1722 , FAX(612)441.2264
ELK RIVER TRANSPORTATION PLAN
In the process of looking at the transportation plan for the City of Elk River,
like the planning commission to pay special attention to the non-developed I would
Elk River.
areas of
We presently are developing one of the finest natural city park systems in the state
of Minnesota!! Thank you for the hard work in accomplishing this goal.
along with many other residents, that any transportation plan which would I feel,
this park system would be very disappointing, impact
In addition to the city park system, many other non-developed pieces of property in
Elk River should be looked at with preservation in mind. It would be sad if these
potential open spaces in the forms of natural areas and farms were bisected by roads.
I would like to end with this thought:
We only know the world we experience.
The youth only know the world they experience.
Human experiences are molded by the environment in which they live.
To conclude I would like to leave you with the words of Henry David Thoreau,
"In wilderness is the preservation of the world."
./~t~~ly yours,
Ron Niziolek
Mike Niziolek
,F
ol
%
Citizens Review of the
Nov. 21~ 1995 MSA
.Transportation study
The Transportation study projected:
1. Average Daily Traffic Volumes (ADT) on roads when the city
is fully developed.
2. Where road "deficiencies" might occur in the future as a fully
developed city.
3. Provided ways to eliminate the "deficiencies":
A. Improvements to roadways with "deficiencies".
B. Adding new roadways.
Critical fi_gums in study are;
· Fig. #3 "Ultimate Development Volumes-No Network
improvements". -
· Fig. #5 "System Deficiencies".
· Fig. #6 "Road Additions".
· Fig. #7 "Ultimate Volumes With Network Additions".
See Map with Fig. #3, #5, and #7 all together.
Pg. 1
. .~chool Street
· Deficiency Location: From Proctor Avenue-East to Jackson Ave.
· Traffic Projections: (Based on ADT or Average Daily Traffic)
.School Street from Proctor and Jackson Ave.:
Ultimate volumes with no road improvements:
Ultimate volumes with road additions:
Net traffic reduction of 1.3%!!!
22,600
22,300
School Street from Jackson Ave. and T.H 169:
Ultimate volumes with no road improvements:
Ultimate volumes with road additions:
Net traffic increase of 16%!!!!!
15,200
17,600
Pg.2
Deficiency Location: North from T.H. 10, through the intersection of
School Street and n~rthwest along County Road 1.
· Traffic Proiections:
Proctor Ave. North of T.H. 10
Ultimate volumes with no road improvements:
Ultimate volumes with road additions:
Net traffic reduction of 9%
Proctor Ave. North of School Street
Ultimate volumes with no road improvements:
Ultimate volumes with road additions:
Net traffic increase of 4%!!!!
38,700
35,500
28,300
29,500
CR 1 North of Proctor to Industrial Park
Ultimate volumes with no road improvements:
Ultimate volumes with road improvements:
Net traffic reduction of 9%.
Pg.3
19,000
17,400
,Upland Avenue and Meadowvale Road
· Deficiency Location: From Upland Avenue north from T.H. 10 to
Meadowvale road to Rail Road Tracks.
· Traffic Projections:
Ultimate volumes with no road improvements:
16,400
Ultimate volumes with road additions:
Net Traffic reduction of 49%
11,000
· What improvements can be made to Upland Ave. to improve traffic
flow??:
Ref. March 1993 study pg. 30 for suggested improvements to
Upland Ave. and Meadowvale road to rail road tracks which include:
-Roadway widening and channelization, particularly on the
approach to T.H. 10, and reduction of access points.
-Introduction of cul-de-sacs along the east-west portion of
Meadowvale Road.
Pg. 4
i Co. RD~ la ~rom' Main Street to Tler Street:
Deficiency Location: From Main Street and 169 up CR 13 to Tyler
Street.
· Traffic Projections.
b{ain Street East of 169.
Ultimate volumes with no road improvements:
Ultimate volumes with road additions:
Net traffic increase of 26%.,:!!:!
CR13 North from Main Street
26,500
33,400
Ultimate volumes with no road improvements:
Ultimate volumes with road additions:
Net traffic reduction of 97%
17,700
9,000
Pg.5
· Traffic Projections:
Ultimate volumes with no road improvements:
Ultimate volumes with road additions:
o VI!
Net traffic increase of 177 'A...!!.!!
10,100
28,000
IS THIS NOW A DEFICIENT ROAD?????????
Pg. 6
.CR 33 East of 169 to Anoka CR22
· ..Deficiency Location: NONE
Traffic Projections'
Ultimate volume with
road additions:
1,300
· Are we going to spend millions of dollars for road improvements
on CR 33 when future traffic volumes don't support it??
· ~A~r.e w.e. goin.g to..dest.roy the "quality of life" for people along CR
Jo just to make ~t eas~er to et from Anoka Court 22 to 16997??
g ty .._
Pg. 7
SUMMARY:
1. The Nov.,~l, 1995 MSA transportation study does not support the
need for the East-West Corridor" by-pass (Propc~sed road additions
"A","B",and "C".)
Deficiencies Summary
By adding the proposed routes in fig.//6 in Nov. 21, 1995 study:
* School Street (from Jackson to 169) traffic increased 16%.
* Proctor Ave. North of School Street traffic increased 4%.
* Main Street East of 169 traffic .increased 26%.
2. Traffic vo. lumes .increased. by 177% on CR 12 by .adding proposed
roads. Is th~s road now deficmnt for futUre traffic volumes????
3. How reliable is the data to support roads "D", "E", and "F"??????
4. Highways 10 and 169 are State roads .... This is Mn. D.O.T's
responsibility.
5. Mn. D.O.T wants external-external traffic to stay on major arterials,
not be routed into the country .....
Pg. 8
11063 205th Avenue, N.W.
Elk River, MN 55330
February12,1996
Planning and Zoning Committee
City of Elk River
Elk River, Minnesota 55330
Ladies and Gentlemen:
After attending Steering Committee, Planning and Zoning, and City Council meetings on
many different issues, the one that. had the most citizen input is coming down to the wire
--the East-West Road. During these meetings, I did not hear one citizen of this city
say we need or want this East-West Road. After listening to many different citizens
give their reasons why they do not feel we need or want this East-West Road, I hope you
as decision makers who represent these citizens have listened to what they have said and
will make the right choice.
jlm
GP:261239 vi
Sincerely,
Mark W. Martin
A Citizen of Elk River
We are the citizens who are directly impacted by the "East-West
corridor" route. We don't need we don't want it.
We are the citizens who are directly impacted by the "East-West
corridor~ route. We don't need
We are the citizens who are directly impacted by the "East-West
corridor" route. We don't need it we don't want it..
We are the citizens who are against the "East-West corridor" route.
don't need it, we don't want it.
We
We are the citizens who are directly impacted by the "East-West
corridor" route. We don't need it we don't t it.
. :' ' '"--T'.:'"
_)
We are the citizens who are against the "East-West corridor" route. We
don't need it, we don't want it.
..~ We are the.citizens who are against " · ' "--
~ don't need it, we don't want it. the East-West corridor~ route. We
We are the' citizens WhO are 'directly impacted by the proposed "East-
West corridor" route, We don't need we don't w t it.
--.~ We are the citizens who are against the "East-West corridor" route. We
' ........... don't need it,. we don'twant it.
...:..~,~,c/~' -r~-'z~-~-~~>'r/:-~-
..... . _ ~., . '
'
~,~- . ,
l
We are the citizens who are directly impacted by the "East-West
corrid.__..~or" route. We don't need it, we don't want it.
"" ':' ~.':.A ~J
, ' ............... . '"':';: .::.:::::>.:.::..':T:~.:.'%::.'/'LI;lCl,r~,$S -::'"."~.h;. ', ~-..;.~-:i~:.L.-~: ~:'.. ~
"-~--,-. ~?'..- .,-_..~. · I /':%~ ~ ~ ,'./-/~-.-,. -
._ .' .... - .... ' ~-'-'~'-..,,,,~_,~ . ~l.-,'c// / ~,-~..
:z 7c
..... We are the citizens who are against the "East-West corridor" route. We
~- .............. don;t need it, we don't want it.
We are the citizens who are directly impacted by the "East-West
corridor" route. We don't need
we are the citizens who are against the "East-West corridor" route. We
") don't need.il -we don't want it ....................
We are the citizens who are directly impacted by the "East-West
corridor" route. We don't need we don't want it.
/!
We are the citizens who are directly impacted by the "East-West
corridor" route. We don't need we don't want it.
We are the citizens who are against the "East-West corridor" route. We
don't need it, wedon't want it.
We are the citizens who are against the "East-West corridor" route. We
don't need it, we don't want it.
0
we .~re the citizens who are directly impacted by the "East-West. .'
.... corridor" route We don't
We are the citizens who are against the "East-West corridor" route. We
don't need it, we don't want it.
We are the citizens who are directly impacted by the "East-West
corridor" route. We don't need don'
We are the citizens who are againSt tfi:~'i, East. West corridor;' route, we
'-') ........... don't need it,.we don't want it.
We .are the citizens who are directly impacted by the UE - ~..-.
corndor" route, ~'e don't We don't want it. · :"~'~'~' ''~' '':'~ ~ ·
We are the citizens who are against the "East-West corridor" route. We
don't need it, we don't want it. .......
We are the citizens who are directly impacted by the "East-West
.co ro~ We don't need we don't want it.
VIII. TRANSPORTATION PLAN
A. INTRODUCTION
It is assumed that automotive transportation will continue as the predominant mover of people
and goods in the future. For this reason, the transportation plan focuses on ground
transportation and network of streets and highways.
The primary concerns of the City are: 1) to ensure proper east-west and north-south arterial
corridors that tie in effectively with the existing transportation infrastructure, and 2) the orderly
development of the infrastructure to ensure economic efficiency of construction and
maintenance.
B. GOALS AND POLICIES
The following is a summary of the City's goals and objectives as they relate to transportation:
GOAL: Provide and maintain adequate and efficient levels of public services within the
communih/.
POLICIES:
· Upgrade all primary local streets to hard-surface, all-weather roads.
· Require that developers provide roads to City qualifications before the City assumes
ownership and maintenance.
Establish a transportation system through jurisdictional cooperation to achieve an
efficient long range plan.
GOAL: Support a regional transportation system which offers convenient and adequate
service within and through the area.
POLICIES:
· Provide for off-street parking within the commercial area to reduce vehicle
congestion.
· Implement an intersection and traffic control program through the use of signage
and signals.
Encourage a high level of efficiency, productivity, and quality of service in modes of
transportation between Elk River, surrounding communities and the metropolitan
areas.
· Pravide frontage roads to reduce access points along major thoroughfares.
· Provide collectors and local streets as appropriate to provide links to the existing
system.
· Recognize the needs of the central business district by offering flexible parking and
other traffic design standards.
3. GOAL: Explore the possible need and alignment for an east-west corridor.
POLICIES:
Establish a joint committee with representation from the City of Elk River, Sherburne
County, Big Lake Township, Anoka County, Wright County, City of Otsego and Mn/DOT
and citizen representation and Park and Recreation Commission involvement in
exploring the need for an east-west route.
In selecting any potential corridor, the following criteria has been suggested by the
Comprehensive Plan Steering Committee;
aa
Be sensitive to existing residential developments, environmental areas, wetlands,
existing public parks, and open space.
bo
A route should assist in alleviating anticipated traffic problems from roads that
are identified as being deficient in the transportation system.
Existing roadways and right of way shall be used as much as possible to
minimize costs for right-of-way acquisition.
d. The selected route should fit into the County's transportation plan.
C. CURRENT STATUS
Although no interstate freeways pass through the City, there is access to Interstate 94
appraximately seven miles south via State Highway 101. Portions of U.S. Highway 101 are
currently a two lane; however, Highway 101 is scheduled for upgrade to a four lane. U.S.
Highways 10 and 169 converge at Elk River and intersect with Highway 101 in a south central
location of the City. Highways 10 and 169 serve as major arterials serving the City in an east-west
and nodh-south alignment. (See Figure 8-A for a description of route classifications.)
The existing County Highway system provides access to the Central Business District and other
activity centers. County Roads 1, 12, 13, 21, 32, and 33 are considered minor aderials while
others are considered collectors.
Figure 8-A displays the existing transportation system. The existing network is often perceived as
awkward and insufficient with respect to traffic movement across the City. The primary concern
is with the lack of east-west corridors and a lack of strategic north-south corridors. Furthermore,
as development continues along Highways 169 and 10, additional traffic will create
unacceptable levels; necessitating various road improvements.
D. LONG RANGE PLAN
The draft Transportation Plan calls for an integrated network of major and minor arterials,
collectors and local streets to serve the City. The City recognizes a need for an east-west
corridor to better serve projected traffic volumes. Since the major and minor arterials are
currently in place, the transportation plan focuses on necessary collector links to tie the existing
system together. Other considerations of the transportation plan include local streets, a parking
system, frontage roads, public transportation, and park and ride facilities.
1. Collector Links
The transportation plan considers the addition of collector links (see Figure 8-B for corresponding
lettersl:
C.
D.
E.
F.
G.
H.
I.
221st Avenue between County Road 32 (Meadowvale Road) and County Road 1 (Elk
Lake Road
221st Avenue between U.S. Highway 169 and County Road 21 (Brook Road)
205th Avenue between County Road 33 and County Road 13 (Twin Lakes Road)
201st Avenue between County Road 1 (Elk Lake Road) and U.S. Highway 169
193rd Avenue between U.S. Highway 169 and County Road 13 (Tyler Street).
Zebulon Street between U.S. Highway 10 and County Road 35.
Frontage road between Zebulon alignment and Joplin St.
Fillmore Street between 175th Avenue and 165th Avenue
Connection parallel to the east side of Highway 169 between 197th Avenue and 193rd
Avenue.
2. Local Streets
The local street system is deployed within the grid of collectors and arteries. The intent of this
plan is to ensure a complete and interconnected street system. All plats will display the location
of streets that connect with existing or proposed streets adjacent to the subject property.
3. Parkway System Trails
The City desires to provide an interconnected parkway system including a trail system for non-
motorized transportation. Portions of the trail system will be incorporated into the existing and
proposed corridor system comprised of off-street surfaces.
4. Frontage Roads
The plan calls for frontage roads and limited access along U.S. Highways 10 and 169. The
purpose of this transportation plan element is to enhance traffic safety along the City's ma]or
thoroughfares.
5. PubliC Transport
Although public transit is not provided by the City or other transit companies, there is a
perceived need for such services. The City encourages private transit companies to provide
necessary intra- and inter- urban services. Connections are necessary to major local and
metropolitan activity centers for shopping, employment, transpodation. Specifically, there is a
perceived need for services to airports. As the population of the community ages, local transit
needs to community facilities and other services will become an issue.
6. Park and Ride Facilities
The City recognizes the need for park and ride facilities due to a substantial resident population
commuting to a workplace in the Twin Cities metropolitan area. The impending population
growth will require the development of additional facilities strategically located within the City.
E. NECESSARY ACTIONS
1. Designate proposed roadways on the City's transportation plan.
2. Coordinate efforts with Sherburne County and Minnesota Department of Transportation.
3. Establish budget for acquisition and improvement of collector streets.
4. Include corridors in the City's capital improvement program and modify the municipal
aid system in accordance with transportation system.
5. Require appropriate land dedications or improvements as surrounding properties are
developed.
6. Amend subdivision regulations to require urban street design.
7. Complete Minnesota Department of Transpodation corridor study for U.S. Highways 169
and 10.
8. Adopt a long range Transpodation Plan consistent with goals and policies of the
Comprehensive Plan.
J
--+
U
, +-+-
FIGURE 8-A
ROADWAY
CLASSIFICATION
City o~
Elk ~i~iver
Ned Nov 15 08:40:23 ~g95
l_
! ! ! l! l! !!! !! ! !!!!!!!! l! Ill l~
FIGURE 8-B
PROPOSED
COLLECTOR LINKS
,i ..... Propo~d Tran~oort~tion I..i~, ~ 1~
City o~~
[ I
1%
lllll
I Ii I