Loading...
6.2. SR 09-15-2008^+// Elk REQUEST FOR ACTION River To Item Number Ci Council 6.2. Agenda Section Meeting Date Prepared by Public Works Se tember 15, 2008 Lori ohnson, City Administrator Item Description Reviewed by Engineering Services for Exploring Wastewater Treatment Plant/Great River Energy Project Reviewed by Action Requested Consider authorizing engineering services to evaluate a possible Wastewater Treatment Plant/Great River Energy project. Background/Discussion The City has a unique situation with the Wastewater Treatment Plant (WWTP) being located next to a power generating plant. Both the City and Great River Energy (GRE) realize that there is potential in cooperating on a project to use the sewer treatment operation to participate in generating electricity. This idea has been discussed with GRE several times in the past; it appears that GRE is now in the initial stage of exploring a project that could include working with the WWTP. Attached is a memo from Public Works Director Terry Maurer that discusses the project in more detail. Obviously we axe very interested in working with GRE to explore this project because of the potential long term benefits to the City. In order to determine if the project is feasible, some engineering analysis needs to be done. Mr. Maurer has identified a scope of work he feels is necessary for the City to evaluate this project opportunity. He has requested a quote from BDM Engineers; the attached BDM quote states a maximum cost of $25,000 for this work. Financial Impact Up to $25,000 from the Waste Water Fund. This cost could potentially be recaptured in one year if a cooperative project is feasible. Attachments ^ Memo from Terry Maurer, Public Works Director ACtlon Motion by Second by Vote Follow Up S:\Council\Lori\2008\WWTP GRE Project Eng Services.doc MEMORANDUM TO: Lori Johnson, City Administrator FROM: Terry Maurer, Public Works Director DATE: September 10, 2008 SUBJECT: WWTP Proposal for working with GRE As you are aware, we have had several meetings with Great River Energy (GRE) over the last several weeks looking at potential synergies between GRE's operation and the city's Wastewater Treatment Plant (WWTP). GRE is anticipating the construction of a digester for processing municipal solid waste. This digester will use the same technology that is currently used at our Wastewater Treatment Plant. This will provide even more opportunities to look for synergies between the two operations. Our hope from the WWTP standpoint is to eventually get out of the sludge handling business. Currently, we store up to 700,000 gallons of sludge on site and twice a year, haul and spread it on the approximately 150 acres that the city owns near the YAC complex. If the city were able to get out of the sludge hauling and spreading business by finding a method to ship sludge or undigested waste to GRE for further processing, not only would it potentially save the city money in our WWTP operations, but would also free up the sludge land for other uses. In addition, looking for synergies has the potential of freeing space within our WWT'P which could potentially be used for increasing the capacity of the entire plant. After several meetings with representatives of GRE, myself, Gary Leirmore and Bill Chang, our wastewater engineer, I have asked Bill to prepare a proposal for working with GRE to further analyze the various options available. Bill has put together the attached proposal estimated at a maximum of $25,000 for working with GRE engineers, dealing Minnesota Pollution Control Agency relative to potential changes in our NPDES permit, and estimating costs to evaluate cost-effectiveness of the various options that may be available to the city. I would recommend that the city proceed with this study and continue to work closely with GRE to evaluate options available to eliminate sludge hauling and spreading in the future. Please let me know if you need any additional information to evaluate this recommendation. S:\PUBLIC WORKS\Sewer Division\09 10 08 memo Proposal GRE.doc Memorandum Date: September 9, 2008 To: Terry Maurer, P.E. .~-~ BDM CONSULTIIVG ENGINEERS AND SURVEYORS, PLC 60 Plato Boulevard East; Suite 140 St. Paul, MN 55107 763-786-4570, Fax 763-786-4574 From: Bill Chang, P.E. RE: Feasibility Study on WWTP Biosolids Incineration at Great River Energy A. The City's Needs for Long Term Biosolids Disposal The City of Elk River Wastewater Treatment Plant (WWTP) generates approximately 900,000 gallons a year (or 0.3 dry tons a day) of biosolids (sewage sludge} from its wastewater treatment operation. The biosolids were treated at the existing anaerobic digesters for pathogen reduction and land applied to the City owned farmland in liquid form. In the past, the City pays approximately $25,000 a year to retain a contractor for liquid biosolids hauling and land application. So far this year, the City has already paid $16,000 to haul 400,000 gallons of biosolids as a result of the digester mixing problems. The total biosolids hauling this year is expected to cost the City $35,000. In addition, the City budgeted $50,000 this year for natural gas used at the WWTP, mostly to heat the anaerobic digesters. With the rising fuel prices, these operating costs may continue to increase. B. Potential Opportunities at Great River Enemy Incinerate Sewage Sludge at Great River Energy Great River Energy (GRE} operates an incinerator adjacent to the City's WWTP. Each day, the incinerator consumes 1500 tons of municipal waste to generate 35 to 42 megawatts of .electricity. The amount of sewage biosolids from the WWTP is insignificant as compared to the mass of municipal waste burned at the incinerators. On May 29, 2008, we met with GRE representatives and Gary Leirmoe to discuss the concept of incinerating municipal sewage biosolids. GRE was interested in incinerating the sewage biosolids as a service to the City. GRE would be interested in working with the city to advance this proposal. 2. Anaerobic Digestion of Municipal Solid Waste at GRE GRE is currently exploring an innovative anaerobic digestion process which has successfully been used by several European countries to convert municipal solid wastes into fuel. This technology requires dilution water in the digestion process. GRE would like to evaluate the feasibility of using the raw sewage sludge from the City's wastewater treatment plant, which is mostly water, as the dilution water. If this innovative technology is feasible, the City may eliminate the need for sludge disposal and the need for sludge treatment at its plant. 9/9/08 C. Feasibility Study Proposal Memorandum The concepts of sludge incineration or digestion at GRE appear to open an opportunity which could potentially benefit the City of Elk River and GRE in both short and long term. To our best knowledge, the City of Elk River is perhaps the only City in Minnesota where its municipal WWTP sits right next to such an incinerator. To further evaluate these two concepts, several environmental permitting .issues, operational issues and fmancing issues must be addressed. GRE's current incineration permit only allows the plant to burn municipal wastes. Adding municipal biosolids may require modifications to the permit. The construction of anaerobic digesters at GRE may require a new permit. It could also affect the City's WWTP permit. The injection point of the liquid biosolids needs to be evaluated to minimise the exposure of GRE's operators to the liquid biosolids and to diffuse the liquid inside the incinerators evenly. The costs of pumping facility at the WWTP and piping from the WWTP to GRE incinerator or digesters must be evaluated. It is our recommendation that the City of Elk River authorizes a feasibility study on the WWTP Biosolids Incineration or Digestion at Great River Energy. The recommended scope of the study includes: 1. Projection of WWTP biosolids for the next 20 years. 2. Identify pending improvement needs for biosolids handling at the WWTP if the City continues its land application for its WWTP biosolids. 3. Review applicable regulations and permit requirements with the MPCA for incinerating sewage sludge or digesting sewage sludge at GRE. _ 4. Provide information to GRE for their evaluation of the anaerobic digestion of municipal solid waste using sewage sludge. Evaluate the pumping facility at the WWTP, the options of piping routes from the WWTP to GRE and the injection points at the incinerators or digesters. 6. Evaluate the level of biosolids treatment required at the WWTP prior to incineration or digestion at GRE. 7. Provide cost analysis on the options of biosolids incineration or digestion at GRE and the option of land application. 8. Discuss the funding options. 9. Develop an implementation plan and a project schedule. The estimated engineering fee for the feasibility study is $25,000. Upon authorization, we could complete the study in 3-4 months. 2