5.2. SR 04-01-1996'ity of ITEM 5.2. MEMORANDUM TO: FROM: DATE: SUBJECT: Mayor and City Council 0 Cliff Skogstad, Building Official March 28, 1996 Re-roofing the Elk River Library As per your request from the March 18, 1996, council meeting, requesting me to pursue bids for either repairing or re-roofing the Elk River Library, I have found from my inspection on March 26, 1996, that the older roof on the library will need a new roof system. From these findings, I contacted Mr. Fred King from Inspec Inc., requesting their services for this project. Inspec Inc. was also used on the Elk River Fire Department re-roofing project. I found their services to be very valuable in the bidding process and construction specifications of the re-roofing project for the Fire Station. Attached to this memo, is Inspec's proposal for services requested. Under "Proposed Fee's" you will see that the first two items are site verification and construction documents. This would cover all signed engineered drawings for the design of the new roof system and assisting us in the bidding process. The proposed cost for these two items is approximately $4,000. The remainder of Inspec's proposal is for construction observation, testing of the new roof, and reimbursable items. These prices are undetermined at this time until after the bidding process is complete, being the proposal is a percentage of the bid price. Previously, when we used Inspec's services for the Fire Station this amount totaled $840. If in the process of testing the old system we feel their may be a possibility of asbestos, there will have to be an additional asbestos test. The price for this test is not included in the proposal. And again, this test was done on the Fire Department project for approximately $165. The total price of all the fees and testing for this project should not exceed $5,000. Recommendation Therefore, at this time I am requesting approval to use Inspec Inc. in the library re-roofing project as outlined in their proposal. If you have any questions, feel free to contact me at the City offices, or if you wish I can attend Monday's meeting. s:Xb&z\cliffXcc3-28.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 4,I SPEC, INC. 5801 Duluth Street Minneapolis, MN 55422 Ph. 6 t 2-546-3434 Fax 6 t 2-546-8669 555 West Layton Ave. Suite 420 Milwaukee, WI 53207 Ph. 414-744-6962 Fax 414-744-6981 Engineering & Architectural services for root~, pa vements, exterior walls, and outdoor sports ~cilities. March 27, 1997 Mr. Clifford Skogstad City of Elk River P.O. Box 490 13065 Orono Parkway Elk River, Minnesota 55330 Re: Proposal for Engineering Services for Reroofmg of Elk River Public Library Roof Area is approximately 6000 square feet. Dear Mr. Skogstad: As requested, we are pleased to provide this proposal to furnish engineering services for the development of construction documents and to provide construction observation and quality control testing for the City of Elk River. SCOPE OF SERVICES Site Verification Roof-related details will be verified in the field using exploratory test openings to allow for dimensioning and sketching of the actual existing conditions. Along with dimensioning the building, this information will be used to provide a basis for the development of the reroofmg design. Construction Documents Drawings and a project manual will be prepared for this project..If, during the desig_n phase, it is determined there is a reasonable potential that one or more new roof systems could offer performance and/or cost advantages, but would add significant load to the existing structure, we would recommend a structural evaluation be conducted. This sumctural evaluation would determine the total load capacity of the existing structure based on the original building drawings. The fee for the structural evaluation would be determined upon review of the original building drawings. The potential exists for asbestos-containing roofmg materials to exist on this project. Should this be discovered during the field verification work, an asbestos consultant would be required to properly address this concern and we suggest these costs be paid directly by the City of Elk River. City of Elk River March 27, 1996 Page Two Based on the background information, viable roof system alternatives will be determined and presented to you for a final decision regarding the reroof'mg design. This decision will then be fully developed into construction documents for this project. Once the construction documents have been developed, we will assist you in issuing the project for bid. We will consult with you concerning the more qualified contractors to notify regarding the availability of this project to bid and will then contact those contractors. A pre-bid conference would be held one to two weeks prior to the bid opening to discuss the scope of work with the contractors at the project site. We will attend the bid opening and provide bid tabulation forms. Once bids are received, we will assist you in the evaluation of the bids and provide a letter of recommendation, if requested. Construction Observation This service would include the review of contractor submittals, a pre-construction conference with all parties, periodic construction observation during reroof'mg, verification of pay requests, and a final walkover of the roof. Our on-site observer not only would act as your representative regarding the technical aspects of the project, but would also act as a liaison between you and the contractor with regard to coordination issues that affect the building owner, such as access and staging areas, shutting down air intakes, and resolving other unforeseen problems that may develop. Testin~ Testing of the roof materials and the completed roof system will be conducted. The types of tests will depend on the type of roof system specified. Our on-site observers have the capability to conduct many of the roofing tests on site, providing prompt test results to the contractor, avoiding "after-the-fact" conflicts. Those tests that cannot be conducted on site will be conducted in our in-house laboratory. PROPOSED FEES Site Verification Construction Documents Structural Evaluation Construction Observation Testing Reimbursables $1,000 $3,000 To be determined Not to exceed 2 % of the construction cost Not to exceed 1% of the construction cost x 1.10 City of Elk River March 27, 1996 Page Three Reimbursables would include such items as the advertisemem for bids and asbestos consultant, if needed. We appreciate your continued interest in our services. We request that you review this proposal and, if satisfactory, sign and return, or prepare a purchase order as our authorization to proceed. Very truly yours, INSPEC, INC. FK/jh Accepted By: By: Title: D ate: City of Elk River