5.2. SR 10-13-2008REQUEST FOR ACTION To Item Number Ma or and Ci Council 5.2. Agenda Section Meeting Date Prepared by Consent October 13, 2008 Phil Hals, Street Su erintendent Item Description Reviewed by Authorization to Complete Concrete Floor in Public Works Ter Maurer, Public Works Director Storage Building Reviewed by Tim Simon, Finance Director Action Requested Staff requests approval from City Council to authorize the expenditure of $20,000 for the installation of a concrete floor in the Public Works storage building by Majestic Masonry of Elk River. Background/Discussion The Public Works storage building now has a section of floor approximately 45 feet by 100 feet that is class 5 gravel. Staff will be on hand to address questions from the October 6 Council meeting and further discuss the quotes from the four different masonry contractors. Please see attached list. Financial Impact The 2008 budget contains $20,000 that was designated for the completion of the floor in this building. Attachments • Summary of quotes for concrete floor in Public Works building attached. ActlOn Morton by Second by Vote FOllow Up Summary of Quotes for Concrete Work in Storage Building Mai estic Masonry 6" Concrete Slab (approx 4,500 SF @ $3.50/SF) $15,750.00 Evaporation Drain $ 4,000.00 City to do the base grading $19,750.00 Bk Masonry 6" Concrete Slab (approx 7,920 SF) Labor $ 9,700.00 City supplied concrete $15,968.61 City to do base grading $25,668.61 TLS Custom Concrete 6" Concrete Slab (approx 7,920 SF) Labor $ 9,900.00 City supplied concrete $15,968.61 $25,868.61 Greenway Concrete 6" Concrete Slab (approx 7,920 SF) Labor $12,000.00 City supplied concrete $15,968.61 $27,968.61