RE: WASTEWATER TREATMENT PLANT BUILDING REPAINTING
Dear Council Members:
We have investigated the paint system proposed by Rainbow, Inc., the low bidder of the
above referenced project. The Tri-Sheen products the Contractor proposed with their
June 14th resubmittal, have similar ingredients as the Thoro products we specified. Both
products have similar characteristics and the same waterprooFmg capability. With
Tri-Sheen products, staining can be omitted.
avR ENGwEERING In discussion with the wastewater treatment plant superintendent, Mr. Darrell Mack, we
ENVIRONMENTAL feel that the Contractor's proposed paint system is acceptable. Although, the Contractor
MuNloPm made a legitimate mistake in their original bid, their resubmittal of $20,350 is still
PLANNING substantially lower than the second low bid, which was $27,231 without staining, and
LID WASTE $31,764 with staining. In comparison with the Contractor's original bid price, the
RuauRAl resubmittal is only $740 higher than the original bid price of $19,610 with staining.
SURVEYING
TRAEHC Instead of re-advertising the project, we recommend the City award the project to
TRANSPORTATIO" Rainbow, Inc., followed by issuance of a change order to accept the Contractor's
recommended paint system. Thank you very much for your attenfion to this matter. If you
ELECrRICAI/MECHANICAI have an uestions, lease feel free to call me at 644-4389.
ENGINEERING. Y 4 P
HVAC
POWER DISTRIBUTION S1nCCrely,
SCADA
svsrEMCONTRO~s MSA, CONSULTING ENGINEERS
.~
c~
B>ll Chang, P.E.
BC:pd
ce: Mr. Pat Klaers, Administrator, City of Elk River
oFElces IN: Mr. Darrell Mack, WWTP Superintendent, City of Elk River
MINNEAPOLIS
~RIORLAKE 256-2228.jun
BT. PAUL
WASECA
luw~st~+
June 15, 1995
File: 230.256-20
OL77NC 6NGINB~P~
Ms. Alice Hainecke
1326 Energy Pork Drire Administrative Assistant
SI. Paul, MN 55108 City of Elk River
612-644.4389 13065 Orono Parkway
1-800.888-2923 P.O. Box 490
Fax: 612.644-9446 Elk River, MN 55330
RE: BID WITHDRAWAL, WWTP BUILDING REPAINTING
ELK RIVER, MINNESOTA
Dear Ms. Hainecke:
On June 2, 1995, I sent a letter to Mr. Pat Klaers recommending the City award the
referenced project to Rainbow, Inc. This recommendation has been included in the agenda
for the June 19th Council meeting. Rainbow, Inc., however, has advised us in a letter
dated June 14, 1995 (attached) that they have misinterpreted the bidding documents and
CIVILENGINEERING underestimated the project cost. Due to the significant cost difference from their original
ENNRONMENTAL bid price, Rainbow, Inc., requested to withdraw their original bid. In addition, the
MUNICIPAL Contractor resubmitted a bid based on a different paint system which, aS they suggested,
PIANNING could accomplish the same purpose aS the paint system we specified. The revised bid price
D WASTE of their paint system is $20, 350 (compared to their original bid prices of $12,210 without
UO1~` staining and $19,610 with staining). The paint system suggested by the Contractor needs
SURVEYING to be evaluated and discussed with Mr. Darrell Mack. The City could retain the
TRAFFIC
Contractor's hid bond and re-advertise the project, or accept the Contractor's suggested
TRANSPORTATION
paint system by way of a change order.
ELECTRICAUMECHANICAL
ENGRJEER~NG: Please bring this issue to the attention of Mr. HIaers. If you have any questions, please feel
Hvnc free to call me.
PowER olsTRisunoN
scnoA Sincerely,
SYSTEM CONTROLS
MSA, CONSULTING ENGINEERS
Bill Chang, P.~
BCaw
Attachment
OFFICES IN:
MINNEAPOUB cc: Mr. Pat Klaers, Administrator, City of Ells Rive;
~ioe uKE Mr. Darrell Mack, W WTP Superintendent, City of Elk River
ST. PAUL
256-1506.jun
WASECA
RAINBOW
INC.
err e4uec orroxrurrnr uwcorsx
7324 -36th avenue north.
minneapolis, minnesota
55427
(612) 535-4041 .
Commercial & industrial Painting
June 14,.-1995
City of Elk River "
130.65 Orono Parkway
Elk River, MN 55330
CONSULTING ENGINEERS
`'ilk r 5 ,cam J
f
Attention: Darrell Mack
WWTP Superintendent
Re: Bid for Refurbishing of Throe Concrete Buildings
Mr. Mack;
Due to a misinterpretation of the bidding documents for the above
referenced project, Rainbow, Inc. respectfully needs to withdraw
our bid. I was not aware of the moisture problem that your
butldings have due to the existing paint.
I would like to resubmit a bid for the project that follows the bid
documents and hopefully, fits your budget for this work. Rainbow,
Inc. is a quality and service oriented company that has been
• operating for 3D+ years. We take pride in doing work that comes in
under budget and on time.
We would like you to consider our bid for this work and also keep
us in mind for your future expansion. Enclosed with this letter is
a new bid for the work and product data sheets for the proposed
system that would meet your specifications.
Thank you for your time and patience.
please feel free to call.
Sincerely;
RAI W, INC.
l
eve Sm h
Project Manager
enclosures:
cc: Bill Chang
MSA Engineers
If you have any questions,
•
4y
-,
vti w
l~tg y~
~ it
fy~fy,~„
R'`-~3
ruunaurr
INC.
AN6QUAL OPPUXTUNTrY FA/ALOS'Elr
7324.36th avenue north
minneapolis, minnesota
55427
. (612) 5354041
Commercial5lnduatrial Painting
Page No. 7
of a pages
N PHONE: ~ DATE:
Cit of Elk River
STREET: - - JOB NAME:
13065 Orono Parkwa
CIYY: STATE: STREET:
E
ATTENTION CITY: STATE
We hereby submit specifications and estimates for:
Step 1 - Sandblast concrete block as required to remove existing paint.
Step 2 - Remove existing caulking as specified and caulk with
"'~"' Acrylic Latex caulking.
Step 3 - Patch. severely spatted areas with Thorite 400 type product.
Step 4 - Coat masonry with Trisheen Concrete surfacer.
Step 5 - Top coat with Trisheen Acrylic.
~ote
These products have been applied extensively by Rainbow, Inc.
at projects such as The Mendota Bridge Renovation and The 4th
Street parking ramp in Minneapolis.
All material is guaranteed to be as specilied. All work to be completed in a workmanlike manner oaording to standard praetices. Am/ alterolion er
deviation from o6ove specil$alions involving esaro costs, will be executed only upon wrieen erden, end will become an es:tro cho over and above
the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to rry fire, bmade and o1h ecaswry inwrorrce.
Our workers ore lolly covered by Workmen's Compensation Insurance.
s
Authorired Signature
Steve Smith
NOTE: This proposal may he withdrawn 6y us it not attepted within l0 days.
Acceptance of Proposal
• the above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the
work as specified. Payment will be made az outlined above.
Dote Signature
r
~,
~.
•
GENERAL -
For all three (3) items, quoted quantity is
estimated, payment shag be made for actual
square footage completed as measured on the
' site with area of doors and windows deducted.
(Approximately 3900 SF of the walls are fluted
block and 3500 SF are smooth concrete block).
SCHEDULE 1.0 BUILDING REFURBISHING - W WiP
1 Provision of all labor, materials, and equipment
for completion of exterior Leaning, rehabilitation,
and recoafing of three (3) buildings at the
Munidpal Wastewater Treatment PIaM, as
spedfied coating shall be two (2) coats of
Thoroseal or equal. SF
2 Provision of all labor, materials, and equipment
for staining masonry surfaces to even color per
manufacturer's rewmmendation, if necessary.
(This item may be deleted if d is deemed
unnecessary) SF
3 Provision of all labor, materials, and equipment
for applying final dear coat sealer per
manufacturers recommendation. SF
SCHEDULE 1.0 BUILDING REFURBISHING - W WTP
TOTAL ITEMS 1 & 3
RESPECTFULLY SUBMf7TED:
~ ~~
SIGNATURE Steve Smith
Proiect Manager
TITLE
UCENSENUMBER
r (SEAL-IF BID IS BY A CORPORATK)N)
F:,:.
SBS.VYKa 4A
7400
7400
7a00
$2.75 320 150.00
N/A
N/A
$20,350.00
RATNR(lY TNC._
COMPANY
_ 7324 - loth Av nnP N_
ADDRESS
June 14. 199
DATE
(612)535-4041
TELEPHONE NUMBER
230.256-20
-BID SCHEDULE FOR: REFURBISHING OF THREE CONCRETE BUILDINGS -1MIYiP
• ..CITY OF ELK RNER, YWNESOTA
.:~
v
J
'}
U
Q
Z
w
rn
1. PRODUCT NAME
-'TRI-SHEEN ACRYLIC
2.' MANUFACTURER
TK PRODUCTS, DIVISION OF
SIERRA CORPORATION ~ .
11400-West 47th Street
Minnetonka, Mn. 55343
612-938-7223
~, 3: PRODUCT DESCRIPTION
TRI-SHEEN ACRYLIC is a 100%
o ~ acrylicbreathablemasonrycoating.
With the use of specially designed
~ acrylic polymers and advanced
adhesion monomers, TRI-SHEEN
° ACRYLIC offers the following ad-
vantages over standard multipur-
pose paint coatings:
-will not fade, chip crack or
peal.
-resistant to ultraviolet deg-
regation.
-will not support mildew
v growth.
p -stays cleaner longer, sheds
O dirt easily.
a -a breathable film resulting in
no internal entrapment of
' moisture vapors.
'~ -long term color retention.
.
~ -for use on exterior or interior
surfaces.
^ -brush, roll, or spray appli-
cation.
-custom colors available.
TRI-SHEEN ACRYLIC can be
used by itself or can be incorpo-
rated in the TRI-SHEEN Concrete
Surfacer or the TRICON System.
TRI-SHEEN ACRYLIC is designed
to be used on all cementations
surfaces as well as on properly
?~; prepared wood or metal.
;'% TRISHEEN ACRYLIC is an excel
~u.:
~~
~`;.':
~A_ .
~,
-
_,y :
TRI-SHEEN acRYUc
lent topcoat for use over TRI-
SHEEN Concrete Surtace or the
TRI-CON System. TRI-SHEEN
ACRYLIC can also be intermixed
with the TRI-CON System to aid in
color stability and further promote
adhesion.
With addition of the TRI-SHEEN
ACRYLIC over textured surfaces a
more uniform color will be
achieved. This type of system also
offers .the architect an endless
choice of accent colors for graphic
uses.
TRI-SHEEN ACRYLIC has been
formulated to maintain a complete-
ly breathable film when used in
conjunction with TRI-SHEEN Con-
crete Surfacer or the TRI-CON
System.
The proper breathability (or perm
factor) of a concrete coating is an
essential performance factor that
must be incorporated in the formu-
lation process thru the careful se-
lection of polymers and resins.
The ability of a coating to prop-
erly breath allows any trapped
moisture vapors to pass through
the film successfully, without loos-
ening or pealing any of the coating
from the substrate.
4. TECHNICAL DATA
TRI-SHEEN ACRYLIC'S poly-
mers have been tested in accor-
dance to:
Test
Met od Resu s
Water Vapor ASTM 9.75 grams/
Transmission E96 melec2Q4hr.
Fungus Federal no fungus
Resistance 1 41 6 2 71-1 ~ 21 days
Freeze Thaw ASTM 50 Cycles
Cyeles 0666.84 No Changes
Technical Data
TRI-SHEEN ACRYLIC conforms
to the following specifications:
FED SPEC. #TTP 19
MN DOT #3584
5. APPLICATION PROCEDURES
AND INSTRUCTIONS
Preparation:
Remove all loose and or crum-
bled laitance and dust from the
Surtace. Powerwashing advisable.
Grease, oil and any form release
agents should be removed with
TK-101 chemical Leaner or other
suitable cleaner. Do not leave pool-
ing or pockets of water on the sur-
face. If the surface needs repair,
TK Concrete Patch is recommend-
ed, allow to fully cure (48-72 hrs.).
If other patching materials are to
be used consult the manufactures
application instructions for cure and
recoat times.
Application:
TRI-SHEEN ACRYLIC may be
applied by spray, roller or brush
methods. Slight dampening of the
surface may be required if applied
during hot or windy conditions.
TRI-SHEEN ACRYLIC is pack-
aged ready to use, no thinning is
required. DO NOT THIN.
TRI-SHEEN ACRYLIC should be
applied only when ambient air tem-
perature has been 45 degrees F.
or above for a period of no shorter
than 48 hcurs prior to application.
Avoid application when the chance
of mist, rain or temperatures below
45 degrees F, could result within a
48 hour period.
TRI-SHEEN ACRYLIC should be
applied using approved application
methods on sound, clean properly
prepared surfaces. Contact
0
m
g
J
V~•
.:.
TK/SIERRA for additional techni-
cal assistance.
Coverage:
Coverage, will be greatly_.deter-
mined;, by .the substrate porosity,
application procedures and weather
conditions- The. square footages
listed below are for reference only.
A 50 square foot- test area should
be applied. for color and yield ap-
proval.
. .SURFACE .
Light weight or
', -. break-off blbck,
Smooth precast
..panels _
COVERAGE
700.150 SPFG
300-400 SFPG
over TRISHEEN 125-7755FPG
Concrete Surfacer
or• the TRI-0ON
Syskm type textures
Precautions:
'TRI-SHEEN ACRYLIC contains
acrylic resins and. a minimal
amount of ammonia. Excessive
prolonged inhalation may result in
headache, nausea and eye or lung
irritation.
First Aid:
Ingestion: Induce vomiting; call a
• physician immediatety. Eye Con-
tact: Do not rub, flush with clean
water for 15 minutes. Skin Contact:
.Remove by washing thoroughly
with soap and water. If eye or skin
irritation- continues, obtain medical
assistance.
6. AVAILABILITY
TRI-SHEEN ACRYLIC. is avail-
able in 1, 5 and 55 gallon contain-
ers. -TRI-SHEEN ACRYLIC is
available in standard coons or can
be ordered to match various colors
on a custom basis. Please submit
color standards for pricing. Con-
tact TK/SIERRA Office for the
nearest distributor.
7. LIMITED WARRANTY
TK Products, a division of The Siem
Corporation, wanants that its products con-
form to ,their kbel descriptions, are free
from manufacturing defects, and are gt for
the ordinary purposes for which such goods
are used. Inasmuch as the use of its prod-
ucts by others antl other factors affecting
product performance are beyond TK
Products' control, TK Products does not
guarantee the results to be obtained.
SHOULD ANY OF ITS PRODVCTS FAIL
TO GNE SATISFACTORY RESULTS, TK
PRODUCTS WILL REPLACE THE PROD-
UCTS OR, AT RS OPTION, REFUND THE
PURCHASE PRICE. THIS IS THE SOLE
AND E%CLUSNE REMEDY FOR ANY
FAILURE OF THE PRODUCTS OF TK
PRODUCTS TO PERFORM AS WAR-
RANTED AN DSHALL ALSO CONSTITUTE
LIOUIOATED DAMAGES IN CASE OF
LOSS. UNDER NO CIRCUMSTANCES
SMALL THE BUYER BE ENTITLED TO
ANY OTHER REMEDY OR DAMAGES.
REMEDIES FOR INCIDENTAL AND CON-
SEQUENTIAL DAMAGES ARE SPECIFI-
CALLY E%CLUDEO. TK Products does not
authorize any person to assume for d any
other gabgily in connection with the sale or
use of gs products unless speegkagy aultro-
rized by TK Produeb in writing: Seo alw
TK PRODUCTS DISCLAIMER sacl'an
bebw.
8. TECHNICAL SERVICES
The TK office offers assistance
with specifications, performance
test data, and field services.
9. FILING SYSTEMS
Information Handling Services; PO
BOX 1213; Englewood, CO 80150.
Information Marketing Services;
13271 Northend; Oak Park, MI
48237
TK DISCLAIMER:
Every e0orl has been made to ensure the
accuracy of the above informal'pn and to
avoid infringement of any patent or copy-
right. Tha Information is based on field
tests by government and private agencies,
as well as lab teals, and on technical daW
from raw materials manufacturers. The
person(s) specifying or requesting the use
of these products is responsible for assurklg
(heir suitability kr a specific use, as wag as
the proper appgcalion of the products.
Where there is any question as to the suil-
ability of a particular product, a small test
patch is recommended. See also LIMITED
WARRANTY (Section 7) above.
FOR INDUSTRIAL USE ONLY
•
•
TRI-SHEEN CONCRETE SURFACER.
~~~ FINE 1 MEDIUM
T~ PRODUCTS Technical Data
Division of Sierra Corporation
• 2: MANUFACTURER
TK PRODUCTS, DIVISION OF
SIERRA CORPORATION,
11400 West 47th Street,
Minnetonka, MN. 55343
612-938-7223
c
ti
~i
C J
1. PRODUCT NAME
TRI-SHEEN
CONCRETE SURFACER
FINE /MEDIUM
3. PRODUCT DESCRIPTION
TRI-SHEEN CONCRETE SUR-
FACER is a non-cementitious
protective texture coating designed
for all above grade vertical
surfaces. TRI-SHEEN CONCRETE
SURFACER can be used either for
exterior or interior applications on
the following substrates: poured or
precast concrete, block, brick,
stone or stucco. Any properly
prepared above grade vertical
cementitious type surface.
TRI-SHEEN CONCRETE
SURFACER is an excellent
alternative to multiple component
dry plaster mixed products. Being
a one-component ready mixed
texture coating, eliminates the
possibility of on site mixing and
measuring errors, resulting in an
uneven textured appearance and
possible film failure.
TRI-SHEEN CONCRETE
SURFACER is blended using high
performance 100% acrylic copoty-
mers and advanced adhesion
monomers, The grade of texture is
achieved using various sizes of
siliceous volcanic rock, silicas, and
siliceous powders. All of which are
suspended in an aquas dispersion.
With the use of advanced
technology, TRI-SHEEN
CONCRETE SURFACER offers
the following advantages:
- A one package ready to use
product.
- Will not chip, crack, or peel.
-Long term color retention
throughout the film.
- Helps control efflorescence
or salt leaching.
- Will not support mildew
growth.
- High resistance to road or
deicing salts.
- A breathable film eliminating
trapped moisture vapors.
- Ability to be applied over a
variety of silanes or siloxanes
such as TKS90 or TK-290.
TRI-SHEEN CONCRETE
SURFACER'S pigmentation is
carried throughout the film
thickness resulting in uniform color
should surface damage occur.
When enhanced protection or
accent colors Bra desired, a top-
coat of Tri-Sheen Acrylic may be
applied. While still maintaining a
breathable film, this two coat
system enhances not only the
performance characteristics but
also offers the architect an end-
less choice of colors.
4. TECHNICAL DATA
TRI-SHEEN CONCRETE
SURFACER is anon-cementitious
100% acrylic coating.. A one
package ready to use coating that
needs no addition of bonding
agents or dry plaster mix products.
Offered in a wide variety of
standard colors or can be made to
match custom color speaficafions.
TRI-SHEEN CONCRETE
SURFACER conforms to the
following speaftcations:
Fed. Spec. TTP #19
MN DOT #3584
TRI-SHEEN CONCRETE SUR-
FACER has been tested in Bo-
cordance with the following:
TEST METHOD RESULTS
Water Vapor ASTM 14.7+ gams/
Trencmisslon E9860 meter/
24 hour
Freeze Thaw ASTM 50 Plus Cycles
C866-84 Passed
Fungus Federal Afler 21 Days
Resktance 141,6271-1 No Fungal
Support
Dry Time Normal 1-4 Hours
Humidity
Conditianc
Topcoat TRI-SHEEN 24Haure
ACRYLIC
Coverage:
Coverage will be greatly
determined by the porosity of the'
substrete, weather ,condifions at
time of application, method 'of
application, etc. The' following
chart is to be consulted only as an
approximate guideline. TRI-
SHEEN CONCRETE SURFACER
will yield the, following S,F:P:G:.on:
SurFace Covereee
L'ghlwelght or 4050 SFPG
Breakotl bock -
Normal Preast " 5060 SFPG
Panels
Stine, Brick or 80 Plw SFPG
Steel Troweled Concrete -
iii
•
73
x
C
C
c
n
-a
tr.
:?a. '
A test .patch of 50 SF should be
applied duplicating application
procedure using the.equipment to
be used, etc.. to' determine the '
~xact square footage per gallon.
5. APPLICATION PROCEDURES
AND INSTRUCTIONS
AreparaL"on:
Remove all loose .and/or
crumbled laitance and dust from
.the surface.. Power washing is
advisable, however if the surface to
~be coated ig highly contaminated
and. cannot be.cleaned sufficiently
with power washing; sandblasting
will' become necessary. Grease,
ail, and .any form release agents
should be removed with TK-101
chemical cleaner or other suitable
cleaner. Do not apply over any
pooling or puddling water. Apply
only to fully cured concrete. Any
patching or repairs should also be
fully cured (see manufacturers'
instructions).
TRI-SHEEN CONCRETE
SURFACER should only be ap-
plied to structurally sound, proper-
ly prepared surfaces, for technical
assistance contact your nearest
TK/SIERRA distributor.
Application:
TRI-SHEEN CONCRETE
SURFACER may be applied by
spray; brush or roller. A slight
dampening of the surface may be
required if hot or windy conditions
persist. It is important that a wet
edge or open film be maintained.
This practice will eliminate uneven
application and allow the film to
property coalesce. When appying
by roller a one inch nap cover is
suggested. With a fully saturated
roller, apply in one direction only,
either vertical or horizontal. Work
new material back into previous
areas. and out again achieving a
uniform rate of application Never .
start or ;stop in the middle of a
plain, work from edge to edge,
back rolling if necessary. DO NOT
EXCEED THE MAXIMUM OF 100
SFPG.
r 1
f._J
When applying by spray,.. a
hopper type texture gun may be
used. On larger scale jobs anon-
pulsating positive displacement
pump with a minimum 1" material
line should be used. Tip size will
be determined by the output of the
chosen pump.
TRI-SHEEN CONCRETE
SURFACER is packaged ready to
use. Stir well or agitate before
using. Any thinning to be done,
should not exceed one pint of clear
potable water per gallon. Thinning
should .only be considered to
facilitate ease of application due to
various types of equipment or
weather conditions. Never thin for
the purpose of extending the
material.
TRI-SHEEN CONCRETE
SURFACER should be applied only
when the ambient air temperature
has been 45 F. or above for a
period of no shorter than 48 hours
prior to application. Avoid
application when the chance of
mist, rain or temperatures below 45
F. could result sooner than 48
hours after application. DO NOT
apply TRI-SHEEN CONCRETE
SURFACER to frost filled block or
any frozen surfaces.
6. AVAILABILITY AND
PACKAGING
TRI-SHEEN CONCRETE
SURFACER is available in two
grades of texture: Fine or Medium.
Both are packaged ready to use in
5 or 55 gallon containers.
Custom colors are available
upon request. Please submit color
standards for pricing. Contact
TK/SIERRA for the nearest
distributor.
7. LIMITED WARRANTY
TK Products, a dNision of The Sierra
Corporation, wamnts that its ~ products
conform to their label descriptions, are free
from manuhcturing detects, and are fit ror
the ordinary purposes forwhich such goods
are used. Inasmuch as the use of'Us
products by others and other /actors
affecting product perfomranee are beyond '
TK Products' eonfrol, TK Products does not
guarantee dra resuxs to be - obtalnsd. ~.
SHOULD ANY OF (TS PRODUCTS FAIL'
TO GNE SATISFACTORY RESULTS,~TK'"
PRODUCTS WILL REPLACE THE
PRODUCTS OR, AT fTS OPTK)N,
REFUND THE PURCHASE PRK:E: THIS -
IS THE SOLE AND EXCLUSNE REMEDY
FOR ANY FAILURE OF THE PRODUCTS
OF TK PRODUCTS TO PERFORM AS
WARRANTED AND SHALL ALSO:.
CONSTITUTE LIQUIDATED DAMAGES IN
CASE OF LOSS. UNDER NO
CIRCUMSTANCES SHALL THE BUYER
BE ENTRLED TO ANY OTHER REMEDY
OR DAMAGES. REMEDIES FOR
INCIDENTAL AND CONSEQUENTIAL
DAMAGES ARE SPECIFICALLY
EXCLUDED. TK Products does not
authorize any person to assume for U any
other liability In connection with the sate or
use of its products unless speclfkalty
authorized by TK Products in writing. See
also TK PRODUCTS DISCLAIMER section
below.
8. TECHNICAL SERVICES
The TK office offers assistance
with specifications, pertormance
test data, field services.
•
9. FILING SYSTEMS •
Information Handling Services, PO
BOX 1213; Englewood, CO 80150
Information Marketing Services,
13271 Northend, Oak Park, MI
48237
TK DISCLAIMER:
Every eNort has been made to ensure the
accuracy of the above Information and to
avoid infringement of arty ~ patent ~o(.
copyright The information re based on field
test bygovemmentand pdvate agenefea,as
weU as Wb tests, and on techninl data from
row materials manufacturers. The person(s)
specifying or requesting the use of These
products is responsible for assudng Ihek
suitabilUy~for a specific use, as well as the
proper application of the producfs.~ Where
there~fs any questbn as to the suUabiity of
a partkular product; a small lest patch' is.
recommended.. See also 'LIMITED
WARRANTY (Section 7) above.
FOR INDUSTRIAL USE ONLY
•
4185
I
i
~ ~ i
~ItiS1ET16E ESCI6EEkS
Tune 2, 1995
1326 Errergy Park Drive File: 230-256-20
sr. Puul, MN ssLL>s
612.64d~4389
1-80E~888~2923 Mr. Pat Klaers
Fax:612~d44~9446 City Administrator
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330
RE: WASTEWATER TREATMENT PLANT BUILDING REPAINTING
Dear Mr. Klaers:
We have been working with the wastewater treatment facility operator to improve the
CIVIL ENGINEERING exterior coatings on the buildings at the treatment facility. The coatings were applied to
ENVIRONMENTAL three buildings during the 1978 plant expansion and, over the years, the coatings have
MuwaPU deteriorated to a point that is threatening the integrity of the masonry structures. In order
PLANNING to protect the structures from further deterioration, it is necessary to clean and recoat
ID WASTE
~ surfaces in the near future.
uauRAl
suRVErING We sent out "request for quotations" to six painting contractors, and have received three
TRAFFIC quotes as of the deadline, May 31, 1995. Their quotes are summarized as follows.
iRANSPGRTAiION
Price without Price with
EIECTRICAt/MECHANICAL
S a'n'nv*
~(lntl'a(`YnrC p,''„.„^
ENGINEERING "'~"~'~`~6
HVAC
POWER DISTRBUnON Rainbow, Inc. $12,210 $19,610
Y.ADA Universal Applicators, Inc. $27,231 $31,764
SYSTEMCGNTROLS Paragon Contractors, Inc. $40,700 $48,100
Note : *Color staining will be applied if necessary, depending on the results
of sandblasting.
Rainbow, Inc., is the low bidder. We have had some previous experience with this
contractor on a water tower refurbishing project. The work they performed was
satisfactory. Based on our experience and the quotes received, we recommend the City
awazd the project to Rainbow, Inc., at the next Council meeting. The specifications require
oFFlces w: completion of the work within 90 days following the notice-to-proceed.
MINNEAPOLIS
~RIOR LAKE
ST. PAUL
WASECA
Mr. Pat Klaers
June 2, 1995
Page Two
Thank you very much for your attention on this matter. If you have any questions, please
feel free to contact me.
Sincerely,
MSA, CONSUL%TIN~G ENGINEERS
~~~~~" `
Chan P.E.
g> ~~~~~
BC:tw
Attachments
cc: Mr. Darrell Mack, WWTP Superintendent, City of Elk River
Ms. Lori R. Johnson, Financial Director, City of Elk River
256-0201.jun
u
•
08/01/98 1D:DB $441T4Y6
'.
'.
GEf1ERAt:
For ad three (3) keme, Worad g0arrtlty is
eat6naled, peymer0 stg0 bn mWe for amral
squars footle oattple4sd as mawraed en the
else with area'of doors and eMrrdewa daduoted.
(MP~rimataly 3800 SF of the walls era fllMd
dock and 3500 SF arc smooth oenaeh derdc).
CITY/fiL6 RIVRR +++ ]IAIIUt STSWART f~0D1/ODD
Poet-It° hrend tax trarrsmkrd memo 7671 wr~e...
SCHEDULE 1.0 BUO.DING REFUR61SlONG YYMYTP ~ r
1 Pmvblon of aA labor, materials, ~ agelpment
for oompkfbn of exhrlOr d~rdn0, IvtabllAation,
' .and reooatirg of three 13) DWWinps atthe
Muhldpal Wastewater rroatrnerd Plam, s
speol0ed coatlnp she8 he !wo C1) Coate of
Thorosa~ w equal SF 7400 ~ .25 /Srr ~a _ ~sn 00
-- -
r 2 P-avlebn of aD labor. materials, sow equipment
I 'for atalnirp masonry aurlwcas to even mlor per
manufacturer's reconvrbrrda0on, k necessary.
(This kem may tq dalatW kk b deemed
umaoessayy SF 7400 _ *I.60/SF
3 Provision of aU gtnr, materials, arM aqulpn>ent
for applying fmai dear rbat sealer par
menutatlumfareeommendatloa SF 7400 E_4n/SF
_s2_g6o.oo
SCHEDULE 1.0 BUILDING RERURBISFkNG • W Wtp
rOTAL ITEMS 13 9
•512,210.00
RESPEC7FULLYSfIBlYA7yFp:
SIfiN~4TURE
P Pl er
T771E
LICENSE NUMBER
(SEAL-IF BID IS SYA CC!RPORA71 )
C 1
~~/Y)/~I _/~ ]l o
ATTEST
• 230256SS.WIG4
Rainbox Ittc.
COMPANY
7324 - 36th Avenu®~ North `
AD0RE8S
Nlnaea.AOlis lIii 55427
DATE
X612?535-4041 _
TELEPHONE NUtABER
4A ~~~
a1D SCHF.DUI.E FOR: REFlJRBIg-pR0 OR 7i$~EE 1:014CRCTE p~py~ . YYYYTP
CITY Of Et.tC RNER, MINNElOTA
OB/Ol/Ob 10:40 $44174Y6 CITY/ELII RIVBR +»+ NAIER ST13ffART fdj002/009'+
~~
For a0 thlae (3) tlenrF gwoed 4usa64' k
ast(matad, pbment stltl bs made for aeWat
b M /IlMalaed ell The
aMe wflh aroa d dons and w{edewa dedudad.
(AppamlYnsteltr 990D SF olths wage ale fidad
Nodt and 3600 SF one smooth aulaab 61otlc).
ac~4eoul.~~.e null.an4oleErimelsrilt4a-tmlvlP
ProvWOn ~a6 for. matwWs,,.ena aqupmera
for oompb6on of aidarier deeAlnp. l
and reeaa6lp oftluee (3) ladldblgs st uls
OAtulirJpal tNsleara4r Treatrl»m ~ ee
*P~6ed ooa6rg ahr0 be bw (Y) oaals of
TLoroaeN or a4~ SF
740D 3.204 73,713.00
2 Provblon of W labor. msteriak, and egldprnenl
for etaininp mmasy alsfam b evee mlar per
nnradadurera ramrtrnetdation, Mnaamry.
(1TIa barn may be delebd if 6 k dawned
anY) SF
61
25
74tm .
.
3 Prov(elon of i6 labor. mderiNe, wd wIWP~I
for apptyUp flrol dear ooet neater per
mellufsotuneYa mmrnmelda6en. SF 7400 .4754 3,SI8.00 •
bCHEDULE 1A BUILU84G hEFWtBISHtM6 -1MYy7p
T01'AL FiF.IMB 1 b 3 27,731.00
WFSPECTR
ILLYS BIM -
r
I
~ \'
SIOt4A tat J. Jfihnstaa 1:7efvRrw~Y a~7i.
COMPAP7Y -nMrai T
t~eident
P
e t~ a~n
1171E _ .-' _ ^ .
~ v.
~ ,r..~t T~ta~
I~ 55925
°-~'°~~~ lfay 31, 1995
lJCEAS~AUM$tER'= ,..
+ ; `; i. RATE
_
..~ ~.
f ~' ~ra~~~'
~~
.. .`.. ~ 612-464--1060
'•.~'i.,'•. ~'i TELEPIIONENUMSER'
ATTE'ST.,
.
2302666S.WIU u mn sec e.
sioac:neou~Fpe: ~oFTt~ruR.oNas.YWViP
ctrrvf 1fL!(te1VER, tTw
s
oa/ol/ea 10:41
'54417426 CITY/EL6 RIVER +++ 1[AIER STEWART
GENERAL
For au tteae Cj) a~db ~
astknated, payment aha0 bs made for acaN
poem SoataOS oompNtad u mesaured on Me
eke with else of doaa erW tNndavre deducted.
(Approximatey'OW SF of the vreae are OutW
blorJk and 3a00 SF are amoofh oonaate black).
SCHEDU461A BUILDING REPURti13HING-WWTP
1 Provialon of as labor, materiak, and puiprrwkt
for oompktbn of sxtedar ciesNng, rehaWlkatlokt
and racoadrkp of Odas (3) bufRkipe attire
Municpal lMaf4nvater TreetrneM Nhnt as
spec0ed rna0ng ehe0 W two (2) wW of
Thorosaal or pual. 3F
Z Provblon of as labor. mahrlals, and pulpnekd
for sWnMp mseenry aurlsaee to even aobr per
rtranufadkaeta rcmmmeMatbn, re r+oceaaary.
(Ilrz Ifem prey 6e deleted U k b deemed
unneco~ary) SF
3 Provision of aA Wbot, materials, and pulpment
for appyinp final clear coat SNler par
manWeelkuers rocommendetion. SF
SCHEDULE 1,0 BUILDING REFUR81$HIN6 - W WTP
TOTAL ITEMS 1 l4 3
RLrSPECTFULLYSUDMR~TEfp:
TURN
19R.IESl~~1`
LICENSE NUMBER
(SEAL-IF BID IS SYA CORPORATION}
ATTEST
0000/OOJ
7400 ~ 5.°m ~ 3"x,000 °a
7400 X I.pe g00.oo
7400 . 5 tJ ~^ -T~ 0 0 c O
.P 40~ 700_ °o
A QA-Ub,~ ~r~s
COMPANY sf-r+C.
6ZZy PrNE- ST
ADDRIESS
DA~(31~as
we
(012- 227- !"1 t'7
TELEPHONE HUMBER
~3oas6-2n
61D 8CHL'AULE FOR: REFUIlBIEFfD16 ~ 111REE CONCRYciE BULLRINGS - W WTP
. CITY OF llJ(RNFJt, MINNESOTA