Loading...
4.9. SR 06-26-1995 ITEM 4.9. 1SULTINGEN6lNEERS 7une22, 1995 - File: 230-277-20 1326 Energy Park Drive St. Paul, MN 551 OB 612-644-4389 Mr. Pat Klaers 1-800-688-2923 City Administrator Fax: 612-644-9446 City of Elk River 13065 Orono Parkway P.O. Box 490 F1k River, MN 55330 RE: TRUNK HIGHWAY 10/70PLIN STREET INTERSECTION IMPROVEMENTS Dear Mr. Klaers: As you recall from our spring tour with MnDOT, they indicated that they would have funding available in fiscal year 1996 (starting July 1, 1995) for the improvement of the awL ENC~NEERING intersection of TH 10 and Joplin Street. This includes signalization of the intersection and ENwRONMENrAL the connection of the frontage road through the Guardian Angels and the Hartman property n+uNiaRAL on the north side. The portion of Joplin south of this intersection is included in the "`^""'NO Bazbarossa project by change order. There will also be some minor modification to the ~uownsTE highway turn lanes. RUCNRAL suevEnN~ Since the spring tour with MnDOT, we have been working with the District Traffic TRAEFic Engineer to fum up a cost estimate and a splitting of these costs between the City and the TRnNSroRTAno" State. At this point in time, we believe that the total project cost will be approximately ELECTRicnun+EaANicu $200,000 with approximately $110,000 to $115,000 funded by MnDOT. The remaining ENGINEERING: $85,000 to $90,000 would be a City expense. These estimates aze based on percentage of aunt participation; therefore, the actual cost split would be determined on actual bid quantities RowER oisTRisuTioN used once construction is complete. SCADA svsTEn+coNTROLS The process this project should go through would be to undertake the preparation of plans and specifications yet this year and be prepazed to bid the project late in the fall of 1995. This will give us an opportunity to pre-order signal equipment or have the City purchase it and have it available once construction begins in the spring of 1996. By having funding available in fiscal year 1996, we are obligated to have a contract awarded by June 30, 1996. This schedule would give us ample opportunity to meet those expectations and to have an operating signal at that intersection during the summer of 1996. I have attached a draft resolution for the City Council's consideration which authorizes work to begin on the preparation of plans and specifications for these improvements. OFFICES IN: MINNEAPOLIS ~IOR LAKE ST. PAUL WASECA Mr. Pat Klaers June 22, 1995 • Page Two If you have any questions regazding this issue, I will be in attendance at your June 26, 1995, City Council meeting. Since this is the last Council meeting prior to the 4th of July, I will also be prepared to provide a verbal update on the status of road construction in the Western Area. Sincerely, MSA, CONSULTING ENGINEERS -~~i~~ Terry J. Maurer, P.E. TJM:tw 277-2229.jun • • RESOLUTION 95 - • A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ORDERING THE IMPROVEMENT AND PREPARATION OF PLANS AND SPECIFICATIONS IN THE MATTER OF THE TH 10/JOPLIN INTERSECTION IMPROVEMENT OF 1995 WHEREAS, the City has determined the intersection of TH 10 and Joplin Avenue should be the main easterly entrance to the western area of the City; and WHEREAS, the traffic projections indicate the intersection will require signalization, and WHEREAS, MnDOT has programmed cooperative agreement funds for this improvement project in FY 1996; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ells River, Minnesota: 1. The TH 10/Joplin Intersection improvement is hereby ordered. • 2. MSA, Consulting Engineers is hereby designated as Project Engineer for this improvement. The Project Engineer is directed to prepaze plans and specifications for the making of the improvement and the solicitation of competitive bids. Passed and adopted this 26th day of June, 1995. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk • 2301265-2221.jun June 26, 1995 TO: Terry Maurer City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: Construction of Elk Hills Drive and Dodge Avenue Dear Terry: This memo will confirm our discussions of earlier today as follows: 1) As I stated in our meeting, we do not agree with the latest design of the intersection whereby Elk Hills Drive, a residential street, is aligned into the main commercial intersection. Our desire would be to see either Elk Hills . Drive offset onto Dodge Street or to have Elk Hills Drive terminated by way of a cul-de-sac. 2) If the intersection is to be constructed pursuant to the latest plans, we would prefer that of the three configurations which you shared with me today, the plan which shows Dodge Avenue in the middle location as to east and west would be as appropriate as any. 3) Should this intersection be constructed, our position will be as follows: A) No properties south of Elk Hills Drive will be assessed. B) We will ask for no monetary compensation for any necessary roadway easements, provided the disturbed areas and back- . slopes are sodded. C) A monetary arrangement will need to be reached with Mr. David Decker who is the sole owner of the property on which the existing sign will need to be relocated. I will personally handle these negotiations for Mr. Decker. Please feel free to contact me for any further reasons. Respectfully, R.E.P. Ltd. of Elk River i ~~ (~ J Gary L.ISantwire