Loading...
5.4. SR 11-03-2008REQUEST FOR ACTION 1'o Item Number City Council 5.4. Agenda Section Meeting Date Prepared by Administration November 3, 2008 Bill Maertz, Parks and Recreation Director Item Description Reviewed by Request Authorization for Installation of New Fireplace Insert Lori ohnson, Ci Administrator at Library Reviewed by Action Requested Request authorization for installation of new fireplace insert at library. Background/Discussion The original fireplace insert at the library was electric because a gas line was not planned due the geothermal heat source of the building. Feedback form the public has been that the electric fireplace is disappointing. Staff researched other electric products and concluded that none of them will provide the desired effect. The Library Board requested staff to investigate a gas alternative. At the October 28, 2008 Library Board meeting, the Board voted to recommend to City Council that a new fireplace be installed. Attached please find prelirninary shop drawings and images for a gas fireplace insert for the library. Installation includes the following: ^ Shop Drawings and Permits ^ Stainless tapered burner with heat treated rocks ^ Replace old glass with tempered high heat glass ^ Power vent and chimney ^ Ram Cap Financial Impact Cost for fireplace and installation $13,526 CenterPoint Energy gas line installation $3,526 Installation of interior gas supply line $1,000 Total project cost $17,811 This project can be funded using the library fund reserves. Attachments ^ Fireplace Quote ^ Preliminary drawings ^ Fireplace burner image C:ADocuments and Settings\jmiller\Loca1 Settings\Temposary Internet Files\OLK3E\L.ibxary Fireplace Request Memo.doc QGtlotl Motion by Second by Vote Follow Up C:ADocuments and Settings\jmillex\Local Settings\Temporaxy Intcmet Files\OLK3E\I,ibsary Pixeplace Request Memo.doc 88/20/2008 08:44 6124458760 VIERECK SALES PAGE 82 Af-XS~. amain Ave. S~ Prior Lake, M1~I Sg372 phone:9~2-X40-620 fay: 9~2-440-Sb27 ~ales{a/~g~o4firepla~ces.coua Aug~~t 2a, 2oos Jennifer Anderson-Tuttle KKE Architects 300 First Avenue Noz~th. Minneapolis, MN 55401 b12-339-4200 ext.4~6{0) b12-342-92b7 (fax) Jobsite address; ]Elk River Lzbrary 13020 Orono Parkway c~stozner Proposal Viereck Fireplace Sales will install one (1) stainless tapered burger with heat treated rocks Into the existing f z~place. Qld glass will be remaved and replaced with new tai, temp, kzl cheat glass. A power vent and chimney will be installed froze the cezzter of the existing fireplace. 'i'bis will require approximately 30 feet of class f3 10 inch pipe with elbows and a rain cap to cover the power vent, ELEC'I`,1ZYCIT~' ~~ OAS LINE 't~ILI, BE SUPPLIED ~~` O RS. Paul Viereck will hook up gas luxe to the fireplace, burner and valve assembly. Viereck Fireplace Sales will supply valve and pilot assembly with secured wall switch ignition for ease of operation. Purner and assen-ibly will be xrzanufaetuxed a.nd tested for proper flal-rre height and 13TU~ range priox to installation. Tot.~il amount for pro}ect: $ I3, 285.00 Oct 14 08 11:21 a VferecK rirepiace ~aie °~~Y~"~"`-' "" I OP V iEW STE EL B~CIC vJ~r u5 U~e~~c,~c. ~i~EpLac.E s x~,~s, tree. r o~ou VI:L I`t VU I I.G ICl VICI Cli 1~ rll C~.llciCiC JC11C S iDE V~E~I uvc.~r~rvwG i N•~' su,~~~ Ut~RECK F~r~EPl,ftC~ SF1LE5, ING Io~~g V LiL 1`T VV I I.G IQ ~~ yy~ 4 7 ~. /~yy ~ 1~~ 4*1 ~ }v'~i W ~ Q (~ V T ~~....(( V`1 1 v Icl coon I u c~lai.c .talc N•~ -1 + ... F ~ ~ rn a~ p ~ ~ ~• /` `~'` Mt ~ '~~'~ ". ~ FM W V m Q ~- ~: m ~ ~ ja R r ~ ~ t^o ~, ~ ~1 an