Loading...
INFORMATION #1 04-08-1996ONSULTING ENG[NEER~ 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax'. 612-64~-9~6 CIVIL ENGINEERING; ENVIRONMENTAL MUNICIPAL PLANNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS INFORMATiGN March 29, 1996 File: 230~116-30 WESTWOOD AREA IMPROVEMENTS SANITARY SEWER HOOKUP Dear Westwood Area Residents: As you are aware, when the utility improvements were completed in your neighborhood, the City Council extended the time frame for hookup to the sanitary sewer system from two years to four years. The end of that four year period will be October 1, 1996. This leaves only one construction season left for the hookup to the City utility. If you have not made arrangements to have your property connected to the sanitary sewer system, please make arrangements to have this accomplished before October 1, 1996. Any questions regarding the hookup can be answered by City Hall staff. At the time of the improvements in your area, there was no requirement to hook up to the water system. However, it is highly recommended that you consider connecting both sanitary sewer and water at the same time. In fact, the Municipal Utilities have since had an ordinance put in place making it mandatory to connect to the water system in the same time frame as the sewer system. Of course, with your area being grandfathered in, this does not apply to you. Sincerely, MSA, CONSULTING ENGINEERS Terry J. Maurer, P.E. City Engineer TJM: tw 116-2907. mar OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA An Equal Opportunity Employer