5.2. SR 04-29-1996CONSULTINGENGINEERS 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax: 612-644-9446 ITEM 5.2. April 24, 1996 File: 230-307-10 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: NAPLES STREET / 186TH AVENUE AREA INFORMATIONAL MEETING Dear Council Members: CIVIL ENGINEERING: ENVIRONMENTAL MUNICIPAL PLANNING ~OLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRiCAL/MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA As you are aware, Pat Klaers and I held an informational meeting with the property owners in the Naples Street/186th Avenue area on Thursday, April 18, 1996, regarding the possible extension of City utilities and permanent streets to that area. There were 14 properties that were sent notice of the hearing. Nine property owners were in attendance. Attached is the sign-up sheet from the meeting. You will note eight names on the list, but the Bickmans have two parcels. Mr. Hartman, who owns the parcel at the corner of Naples and the frontage road called prior to the meeting and indicated he had a conflict but was in favor of getting more information. That leaves four property owners (Sally John, James Waite, Gerald Waite, and Vernon and Victoria Lofgren) who were not in attendance and did not call previous to the meeting. Attached is the hand-out that was distributed at the meeting. We went through and explained the various costs associated with the extension of sewer, water, and permanent streets. We discussed one method of assessments that is outlined in the hand-out. After the presentation, the meeting was opened to questions. A summary of the questions that were asked is as follows: There is an existing 24-foot wide easement for roadway purposes through this area. We are not sure if the road is centered in the easement or not. A question was asked as to how the additional right-of-way would be acquired. The answer was that the 60-foot right-of-way in total would be centered on a line that would represent the centerline of the existing 24-foot wide easement. The question was asked what would happen if the majority were in favor and were willing to give right-of-way for the project to proceed but there were a few minor holdouts--would the City Council consider condenmation and proceed with the project? The answer was that we were not sure. The City Council has proceeded very cautiously in the past in using their eminent domain powers. 230/30%2212. apr An Equal Opportunity Employer Honorable Mayor and City Council April 24, 1996 Page Two A question was asked about what were the requirements for a hookup to the sewer and water. It was indicated that the City ordinance requires hookup within four years, but that existing wells could still be used for outside irrigation purposes if they are properly segregated from the City water system. There were a number of questions about how units were arrived at, and what was the minimum lot size to create a buildable lot. It was indicated that the zoning of the area is Rlc, which requires 80 feet of frontage and 10,000 square feet. Mr. Rahn indicated that he had previously dedicated to the City a 66-foot right-of- way which we had shown as still his property. We indicated at the meeting that this would be checked further and if that were the case, he would be given a lesser assessment. A question was asked about how the 60-foot right-of-way and new road would affect some major mature trees. We indicated that if a feasibility study was ordered, we would do the survey work necessary to have these answers at the public hearing. We indicated that the question which we needed to come to some consensus on was whether or not the property owners would like to proceed on to the next step, which is a feasibility study to get more information regarding potential of sewer, water, and streets in the area. Each property owner in attendance gave an indication of their feelings. These are summarized below. Goenner Bickman Olson Knutson Guck Hartman John Chicoine Waite Lofgren Rahn Waite Swanson Not too interested in more information. In favor of proceeding to the next phase. Not sure of position. In favor of going further. In favor of going forward. Not in attendance but phoned prior to the meeting to indicate he is in favor of proceeding. Not in attendance at meeting. In favor of receiving more information. Not in attendance at the meeting. Not in attendance at the meeting. Not in favor of sewer and water. Not in attendance at the meeting. Not in favor of City utilities. 230/307-2212. apr Honorable Mayor and City Council April 24, 1996 Page Three Based on this response, we indicated to those in attendance that we would provide a summary of the meeting to the City Council and a recommendation from staff to proceed with the feasibility study for extending sewer, water, and permanent streets into this area. A draft resolution is attached which would authorize the feasibility study. If you have any questions regarding this, I will be in attendance at your April 29, 1996, City Council meeting. Sincerely, MSA, CONSULTING ENGINEERS TJM:tw 230/307-2212. apr RESOLUTION 96 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION OF THE CITY OF ELK RIVER ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE MATTER OF THE NAPLES STREET/186TH AVENUE IMPROVEMENT OF 1996 WHEREAS WHEREAS the City has determined that it should consider improving certain property by extending City utilities and permanent streets (the improvement); and Council must first secure a preliminary feasibility study in order to consider making the improvement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: This matter shall be referred to MSA, Consulting Engineers, who is requested to provide to the City Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this 29th day of April, 1996. ATTEST: Henry A. Duitsman, Mayor Sandra A. Thackeray, City Clerk 230/307-2212.apr NAPLES STREET / 186th AVENUE AREA STREET AND UTILITY INFORMATIONAL MEETING THURSDAY, APRIL 18, 1996 6:30 - 8:00 p.m. Pat Klaers, City Administrator Terry Maurer, City Engineer 230/000-1708.apr HOUSE R/'W L~NE CURB & GUTTER DRIVEWAY ~ROFOSED WATERMAtN I --~CPOSED S AN t TAR"," ER3OCEX NAPLES ST./186TH AVE. TYPICAL LOT City Elk ~'iver' PROPOSr_.L. RIGHT OF WAY TO BE AQUIRED 30' J 30' EASEMENT FOR ROADWAY PURPOSES GIVEN TO OF ELK RIVER iN 1961 = 12' I 12' ,~96!8 CONCRETE CURB & GUTTER 2331 TYPE 31B BITUMINOUS BASE COURSE CLASS,.., '~ AGGREGATE BASE TYPICAL STREET SECTION NAPLES ST./186TH AVE. TYPICAL STREET SECTION City of~ Elk iver OTItER (NON-ASSESSMENT) COSTS SEWER AVAILABILITY CHARGE (SAC): SAC costs are the "buy-in to the sanitary sewer system. They pay for the capital cost of the wastewater treatment plant and ongoing maintenance. The current cost is $1,300, payable at the time of hook- up. WATER AVAILABILITY CHARGE (WAC): WAC costs are the "buy-in" to the water system. They pay for the capital cost of wells, elevated storage, and water treatment facilities, along with their ongoing maintenance. The current cost is $1,000, payable at the time of hook-up. HOME OWNER COSTS: The home owner is obligated for the sewer and water connect from the property line to the home. In addition, City ordinance requires the old septic tank to be filled in when it is abandoned. These costs are difficult to estimate and will likely vary from property to property. 230/0(X)-1708.apr ~N~[LTINGBGINEEi~ PROJECT FINANCING · Zoning: Rlc (Single Family Residential) Lot Requirements: 80' Frontage 10,000 Squre Feet 14 Parcels Assessed for 26 Units · Project Financing: Total Project Cost Assessments - 26 Units @ $12,500 $525,000 325,000 City Cost $200,000 230/000-1708. apr RIVER 0 120 ! ,,,~ ,,, 186th AVENUE ?~- 131-1400 ~5-131-14,55 75-131-141,5 75-131-1101 75-151-14-20 75-! ~1-1 NAPLES ST./186TH AVE. POSSIBLE ASSESSMENT METHOD Elk ~iver ~J L.~.2 'J j Project: Parcel: Owner: ASSESSMENT SCHEDULE Constant Principal Payment Method Naples Street/186th Avenue Area UNPLATTED Interest Start Date: Repayment Period: Interest Rate: Assessments: a. Street & Utility Improvements 01-Jan-97 15 years 8.00% Quantity 1 Unit Measure LS Total Assessment Unit Price 12500.00 Amount $12,500.00 $12,500.00 YEAR 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 ANNUAL PAYMENT $1,833.33 $1,766.67 $1,700.00 $1,633.33 $1,566.67 $1,500.00 $1,433.33 $1,366.67 $1,300.00 $1,233.33 $1,166.67 $1,100.00 $1,033.33 $966.67 $900.00 $20,500.00 PRINCIPAL PAYMENT $0.00 $833.33 $833.33 $833.33 $833.33 $833.33 $833.33 $833.33 $833.33 $833.33 $833.33 $833.33 $833.33 $833.33 $833.33 $833.33 =Total of Annual Payments INTEREST PAYMENT $0.00 $1,000.00 $933.33 $866.67 $800.00 $733.33 $666.67 $600.00 $533.33 $466.67 $400.00 $333.33 $266.67 $200.00 $133.33 $66.67 PRINCIPAL REMAINING $12 500.00 $11 666.67 $10 833.33 $10 000.00 $9 166.67 $8 333.33 $7 500.00 $6 666.67 $5 833.33 $5 000.00 $4,166.67 $3,333.33 $2,500.00 $1,666.67 $833.33 $0.00 04/17/96 l ¥ ' River PROJECT SCHEDULE April 18, 1996 Informational Meeting May 6, 1996 May 20, 1996 June 17, 1996 Report to City Council, order Feasibility Study Present Feasibility Study, order Public Hearing Hold Public Hearing, order preparation of Plans and Specifications July 15, 1996 City Council approve Plans and Specifications, authorize the advertisement for bids August 12, 1996 Present bids to City Council, order Assessment Hearing September 2, 1996 Hold Assessment Hearing, award contract to low bidder September 1996 Start construction November 1996 Utilities ready for connection, suspend construction for winter May 1997 First payment and real estate taxes July 1997 Construction complete 230/000-1708.apr ~PR-25-1996 1~:~1 P.02/02 TOTgL P,02