Loading...
5.4. SR 04-29-1996CONS[LTING ENGINEERS 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax: 612-644-9446 CIVIL ENGINEERJNG: ENVIRONMENTAL MUNICIPAL PLANNING · JOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA ITF~ 5.4. April 22, 1996 File: 230-223-30 Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: DOWNTOWN PARKING LOT REPAIRS Dear Mr. Klaers: This correspondence is intended to restate the status of the repairs on the downtown parking lot. As you recall, this project was done by a change order to the contract of Barbarossa & Sons for the Western Area Phase II improvements. That project is currently complete with the only outstanding issue being the downtown parking lot. We have met with Barbarossa & Sons and their subcontractor, Bauerly Brothers, Inc., last fall. The result of that meeting was the withholding of half of the payment for the bituminous pavement on the parking lot and a 1% withholding on the entire contract. As you recall, that contract was in excess of $2,000,000. Therefore, we have sufficient funds to repair the parking lot surface. We also left it that the repairs would be undertaken by the City and would include seal coating and possibly removal and replacement of specific areas. After the City has satisfactorily repaired the bituminous surface, we would provide Barbarossa & Sons with a full accounting of the money spent by the City and release the remaining payment for the bituminous surfacing and any retainage that is left. There are two schools of thought as to how and when the City can undertake this. One would be to undertake it as soon as weather permits in the spring to remedy the appearance problems of the parking lot. However, the method that I would recommend would be to wait until later in the summer or early fall. This would allow the landscaping in the parking lot to be completed and any bituminous that is marred by the landscaping operations could then be repaired with the seal coat. Also, by waiting until later in the summer, this would give us a little more time to see if there are any areas that need structural repair. None appeared to need structural repair last fall, but waiting a little longer in 1996 before the final repairs are made would be, in my opinion, a good idea. An Equal Opportunity Employer Mr. Pat Klaers April 22, 1996 Page Two Please let me know if you need any more specific questions answered regarding this issue. I would be available to talk directly to the EDA if that is necessary. Sincerely, MSA, CONSULTING ENGINEERS TJM:tw 223-2202. apr