Loading...
5.5. ERMUSR 10-14-2008J/ Elk River -^: Municipal Utilities 13069 Orono Parkway • P.O. Box 430 Elk River, MN 55330-0430 September 29, 2008 To: Elk River Municipal Utilities Commission Jerry Takle John Dietz Jerry Gumphrey From: Bryan Adams Subject: Electric Department Job Restructuring Phone: 763.441.2020 Fax: 763.441.8099 At the last Elk River Municipal Utilities commission meeting, the attached sheet was discussed reflecting the proposed workload redistribution within the electric department. This restructuring was brought to this commission first before talking to the affected employees to head off any perception of retaliation due to the ongoing internal investigations. The reason for this restructuring is to balance the workload to accommodate due to the lack of new development as we are doing substantially more maintenance and less expansion. Your staff has discussed this proposed shifting of duties with the affected parties particularly with Mike Thiry who is proposed to assume his former duties as a lead lineman. Mike Thiry understands the need for this change and felt it unnecessary to appear before this commission. We have started the necessary cross training to allow Mike to transfer his current duties to other employees. Electric Department restructuring to balance workload Job function Currently Done By Proposed to be Done By Electrical Design & Layout Prepare necessary permit applications Maintain MSDS Sheets (temporarily ) Subcontractor Field Support & Inspection Transformer Testing of PCB's Tool Repair Plant Safety Inspections Glenn Mike T Mike T Glenn, Wade & Mike T Mike T Mike T Mike T Troy & Mark F Wade Wade Possibly Chris K in Future Wade & Mark F Meter Shop Steve Z Chris K Lead Lineman Mark F Mike T