Loading...
6.4. ERMUSR 10-14-2008~/ ~~ Elk River -~ Municipal Utilities 13069 Orono Parkway • P.O. Box 430 Elk River, MN 55330-0430 October 7, 2008 To: Elk River Municipal Utilities Commission Jerry Takle John Dietz Jerry Gumphrey From: Bryan Adams Subj: Three Phase Line Extension Phone: 763.441.2020 Fax: 763.441.8099 A church in Otsego is proposing to build a new facility on County Road #39 at the west end of our electric system. The location of this facility is currently served with singe phase power while the new church requires three phase power. To provide three phase power to this facility will necessitate burying approximately 2,500 feet of conductor at an estimated cost of: Line extension $45,000 3Q) J-boxes for future customers $13,000 Church service $16,000 TOTAL $74,000 The question at hand is what to we charge this customer to extend three phase power. Our current policy states: "COST OF EXTENSION DEFINED: The construction cost shall include all the costs of materials and labor and all other expenses incurred in the installation of poles, wire, cross arms, insulators, line hardware, switching and protective devices, meters, appurtenances, right-of--way permits and all other items of labor and materials incident to the construction of the extension. TERMS AND CONDITIONS OF ELECTRIC SERVICES: The Elk River Municipal Utilities Board of Commissioners shall make the determination as the feasibility of all electrical distribu- tion line extension petitions." For a commercial developer, per our policy, we typically charge 50% to extend service from source of power to the building. There is little probability that additional three phase customers will build in this area. The marginal revenue for this customer is in the 3¢ range depending on load factor or $270 per month. The two obvious options are as follows: 1. 50% of the cost from source of power or 50% ($74,000) _ $37,000 2. 100% of the line extension $45,000 0% 3f~ J-boxes for future use $ -0- 50% Church services $ 8,000 TOTAL $53,000 To date we have indicated to the owner the cost to provide three phase power is $53,000. We can lower this amount if this Commission desires otherwise. The cost to provide single phase power is in the $8000 range.