6.3. ERMUSR 08-12-2008Ji Elk River -~ Municipal Utilities 13069 Orono Parkway • PO. Box 430 Elk River, MN 55330-0430 August 4, 2008 To: Elk River Municipal Utilities Commission Jerry Takle John Dietz Jerry Gumphrey From: Bryan Adams Subject: United Health Group Data Center Phone: 763.441.2020 Fax: 763.441.8099 Starting on Saturday, July 26, 2008, United Health Group started their final testing and was utilizing approximately 9.3 MW/hour. Part of this testing is to run their onsite generation. This testing concluded approximately Friday, August 2, 2008. Because this week was hot and humid, GRE was interrupting their interruptible customers all week and declaring these days critical peak pricing. Critical peak pricing means our purchased energy price from GRE increases from $0.04406 to $0.09535. By UHG staying on our system during GRE's system peak, it would have cost us approximately $165,000 in demand costs and $2300/day in critical peak pricing. This savings is approximately 10% of our monthly power bill. As a result of these economics, we ask UHG to utilize their generators between 4:00 p.m. and 10:00 p.m. for the entire week as long as they were scheduled to run them anyway. They were gracious enough to comply with our wishes. Attached is our system load curve for Monday showing the load reduction. Apparently some of the neighbors around UHG became upset due to the additional noise of the engine/generators. I do not know how to resolve this sound issue. Apparently the noise levels at the property are within stated limits. ' ~ Q co Q M N 7 H N ~~- d N E_ ~~ a co a M a. N .-- Q {~~~ 0~~1 ~Nn~ ~~~I~ ~~~ ~b~ O O N C O UD N