Loading...
4.2. SR 03-17-2003R3ver MEMORANDUM Item 4.2. TO: FROM: DATE: Mayor and City Council PMa~r ~'ha~i '2~ i0t3 Ad m i n~ SUBJECT: Consider Proposal for Inputting City Record Drawings into GIS Map The city GIS map is complete. The next step is to input all of our existing utility (sewer, water, storm sewer) information from 20 plus years of record drawings into the system. City staff has discussed this issue for the past few months and have reached a consensus that the best approach is to have Howard R. Green Company use interns to create these data files. (For all new plats the data will be required to be provided to the city by the developer in a GIS acceptable format.) A critical issue with this work project is funding. In this regard the Utilities General Manager Bryan Adams has agreed to participate (see attached memo from Michele McPherson, Director of Planning) and the city share will not exceed $9,000. This expense will come out of the city engineering general fund budget ($75,000 in 2003). This GIS expenditure can be funded within the engineering budget because the city is no longer absorbing the expense associated with the review of altered residential building plans (See attached memo from Steve Rohlf, Building and Zoning Administrator). In the past, the city paid Howard R. Green for review services when changes were requested and this expense came out of the city engineering budget. The city is now passing this cost on to the builder, who is directly benefiting from the plan changes. Recommendation It is recommended that the City Council approve the GIS record drawing input proposal as submitted by Howard R. Green Company in an amount not to exceed $15,000. S~ Coundl/ Pat/ GISMap TO: FROM: DATE: SUBJECT: For Your Info. MEMORANDUM Mayor and City Council Stephen Rohlf, Building and Zoning Administrator February 6, 2003 Engineering Fees for the Review of Surveys that are not in Compliance with Approved Development Plan To ensure home construct/on is consistent with the overall scheme for handling drainage in a plat, the city requires development plans. What type of house fits on each lot and how grading for that lot is to be done are some of the typical items on development plans. There are situations where deviations from the approved development plan (e.g. altered drainage, lower or higher lowest floor elevation, different house style, etc.) can be allowed without compromising the overall plat drainage. When significant deviations are proposed, they are reviewed by the City Engineer's office. The city incurs costs for the Engineer's review that are not accounted for in the building permit fee. The city receives between 50 and 75 requests per year for significant deviations from approved development plans. Starting February 1, 2003, an additional $150 engineering fee is being added to the cost Of those building permits where the builder wishes to significandy deviate from the approved development plan for a plat. Minor revisions are processed by the Building Department without additional charges. MEMOltANDUM TO: FROM: DATE: SUBJECT: Bryan Adams, Gen~.anager Elk River Municipal Utilities Michele McPhersot~,~1:)irector of Planning February 28, 2003 Cost Sharing of Record Drawing Input for GIS Mapping Attachments December 30, 2002 Letter from Terry Maurer - Howard R. Green Company As we discussed on Tuesday, February 25m you agreed to participate in the cost of inputting into the GIS system, the City's record drawings. As Mr. Maurer's letter indicates, there are approximately 2,000 sheets of record drawings and the total cost of utilizing Howard R. Green interns for completing this project will be approximately $15,000. Mr. Maurer's letter further indicates that a minimum of 35 percent of the information is for the water system. You agreed to participate in the cost of inputting this information in the amount of $6,000 (40% of the total project). The City will pay for the rest of the project costs. This memo serves to confirm our conversation and to note that any additional work outside of collecting the record drawing information that relates to the water system will be an additional cost to you. cc: Pat Klaers, City Administrator Terry Maurer, City Engineer S:M~LANNINGUMichele McPhersonMglEMOS\B Adams GIS.doc Howard R, Green Company December 30, 2002 File: 230000M-0325 Ms. Michele McPherson Director of Planning City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: GIS MAPPING INFORMATION RECORD DRAWING INPUT Dear Ms. McPherson: This correspondence is intended to serve as a formal proposal laying out the various options we discussed at our December 13, 2002, meeting for the input of available record drawing information onto the City's GIS Map. As you are aware, we have approximately 2,000 sheets of record drawing information dating back to the late 1970s. Information contained on these record drawing plan sheets consists of street, sanitary sewer, watermain, and storm drainage information. At our most recent GIS meeting on Friday, December 13, 2002, we discussed three options for getting this information from the record drawings into the City's GIS mapping system. The three alternatives are as follows: 1. Howard R. Green Company Interns As we indicated at our meeting, on Friday, December 13, 2002, we have done a small experiment to determine how long it would take an intern to pull the information off of the record drawings and create a database. By making some estimations from this small test relative to the number of sheets of record drawings and the amount of time it would take to compile the information contained on them, we have estimated that it would require approximately 375 hours of time to go through all of the record drawings from the last 25+ years. We believe this work could be competently accomplished by interns who have worked for us a few years. These interns are Civil Engineering students at the University of Minnesota. We would propose to discount their billing rates to $40/hour, which provides for the overhead required for these employees, plus a modest profit. In fact, we would be prepared to commit to the City of Elk River that, based on a $40/hour billing rate and an estimate of 375 hours to perform this work, we would agree to accomplish the work for a lump sum cost of $15,000, regardless of how long it takes. In order to accomplish this work utilizing interns from the University of Minnesota, a reasonable timeframe would have to be allowed to have the work accomplished. During the school year, the interns work as many hours as their school schedule will allow. During Winter Break, Spring Break, and summer, they are full-time employees. 2. City of Elk River Intern Working at HRG Offices We would be prepared to provide a workspace and computer equipment for the City of Elk River to place an intern working for the City into HRG's offices to facilitate the efficient collection of record drawing data. If the City chooses to use this route, there would be no charge to the City of Elk River from Howard R. Green Company for the use of office space and equipment. Ltr-122702-McPherson 1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Ms. Michele McPherson December 30, 2002 Page Two If the City desires, we could do a combination of a City employee working in HRG's offices and a HRG intern to accomplish the project. Under this scenario, we would charge $40/hour for the HRG intern. 3. City to Accomplish the Work at City Offices If the City desires to do this work with City employees at City Hall offices, we would be prepared to deliver to the City all record drawings for their use in accomplishing this task. Once the task is accomplished, we would be prepared to bring the record drawings back to the Howard R. Green Company offices for their continued storage. As you are aware, a major portion of this record drawing information is for the Elk River MUnicipal Utilities water system. I would estimate that at least 35 percent of the information is for the water system. This estimate assumes the record drawing information can be divided into thirds; sanitary sewer, water, and street and storm drainage combined. After you have had a chance to review these alternatives, I would be happy to sit down and discuss them further with you. Sincerely, Howard R. Green Company Terry J.,Maurer, P.E. c: Pat Klaers, City Administrator - City of Elk River Ltr-122702-McPherson Howard R, Green Company