Loading...
5.4. ERMUSR 01-13-2009Elk River Municipal Utilities 13069 Orono Parkway • P.O. Box 430 Elk River, MN 55330-0430 January 5, 2009 To: Elk River Municipal Utilities Commission Jerry Takle John Dietz Jerry Gumphrey Fr: Vance Zehringer Subj: Integrity Testing Policy Phone: 763.441.2020 Fax: 763.441.8099 New large demand customers or existing large demand customers that have installed new production equipment will usually conduct tests to determine the integrity of their production equipment and electrical system at some time during initial startup. This testing can have a negative impact on their power bill and it should coincide with Elk River Municipal Utilities billing peak resulting in a significant increase in our wholesale power bill for that month. We propose to discourage the practice of performing integrity tests during on-peak hours by offering an incentive to do those tests during off peak hours instead. The attached proposed Policy authorizes ERMU to ignore peaks established during off-peak hours for the purposes of billing if the customer agrees to shift integrity testing to off peak hours only and follow the dictates of the proposed Policy. As proposed, this Policy assures startup peaks will not contribute to ERMU's billing peaks. ELECTRIC RULES INTEGRITY TESTING New large demand customers or existing large demand customers that have installed new production equipment and conduct tests to determine the integrity of their production equipment and/or electrical system or Elk River Municipal Utilities (ERMU) electric distribution system can have a significant financial impact on their power bill especially if all equipment is energized simultaneously. It can also have a significant financial impact on ERMU's wholesale power bill if such testing coincides with the hour the monthly billing peak is established. To discourage the practice of performing integrity testing during on-peak hours, ERMU will offer new large demand customers or existing large demand customers that have installed new production equipment an incentive to conduct all integrity testing during off-peak hours. That incentive will come in the form of an agreement to waive the demand charge associated with the additional peak created by integrity testing providing the following are observed: 1. The term large demand customer applies to any business or facility that places a demand of one megawatt (1000 kW) or more on Elk River Municipal Utilities distribution system. Multiple facilities under a common name or ownership cannot aggregate to meet the minimum demand required to qualify for this offer. 2. The term off-peak hours refers to the six hours from midnight to 6 AM any weekday, or the ten hours from midnight to 10 AM any weekend day. 3. 24 hour notice that integrity testing will be conducted will be forwarded to ERMU by contacting 763-441-2020 to assure there are no extenuating circumstances that such tests should not be performed on that day. Such permission shall not unreasonably be withheld. 4. Initial startup refers to equipment and/or facility testing that is typically performed to test the integrity of the electrical system serving the equipment or facility prior to the business opening their doors for business to the general public. It also refers to equipment and/or facility testing that may be performed to test the integrity of the electrical system serving equipment that has been added to an existing business. If all integrity testing is performed within the parameters described in items 1 through 4 above, ERMU will ignore all demand peaks established during those off-peak hours for the purposes of establishing the customer's monthly billing demand. However, should integrity testing occur during both on-peak and off-peak hours, no demand peaks and/or resultant billing demand will be waived for that month.