Loading...
5. - 11. ICESR 04-10-2007City of Elk River Ice Arena Commission Meeting Agenda Tuesday Apri110, 2007 Elk River City Hall /Upper Town meeting room 6:OOpm 1. Call meeting to order 2. Consider 4/10/07 Ice Arena Commission Agenda 3. Consider 1/10/07 Ice Arena Commission Minutes 4. Open Mike 5. Review 2006 operating finances /Current information on 2007 financial status 6. Ice Sales /Ice rates 7. Concession Stand 8. Energy Saving Measures • Co -Ray Vac (Heating over Bleachers) • Lighting for over the Rinks :• Low E -Ceiling (Insulating Ceiling over the rinks) • Energy Management System 9. Walking Track 10. Remodeling of the Entryway and Lobby 11. Staff Updates: 12. Other Business 13. Adjournment MEMORANDUM TO: Ice Arena Commission, Members FROM: Rich Czech, Arena Manager DATE: April 3, 2007 SUBJECT: Agenda Memo - Apri13, 2007 5. Review 2006 operating finances and current information on 2007 financial status Attached for your review are the financial summaries for the Arena for the years 2004, 2005, and 2006 along with the budget for 2006 and 2007. Included are some historical data and an outline of capital improvements that have been made over the years. Ice revenue for 2006 was projected to be $389,400.00; the actual revenue was $410,210.00, $20,810.00 higher than what was projected. This increase was due to the fact that more hours were rented in the summer than what was anticipated along with some of the later hours being rented during the season. Most of the other revenue items were very close to the budget, however the vending and building rental was down from what was budgeted. In talking to the Bernicks route driver, the owner of grand Prix Vending (our $.25 vending), and the owner of C.D.L. Video, they all felt that their business has been down this past year. I am working with C.D.L. Video on getting up to date video machines in the video area. Over the last few years we have not gotten the best machines. When talking to the owner he has said that machines are expensive to purchase and that he needed to get a certain volume from a machine in order to place it at a site. If I can not work out something with C.D.L., I will be looking at alternative companies for videos or a different venue for that area. The "Learn to Skate" program and skating Academy continues to grow. This is due in part to our Director, Janice Perszyk and her talented instructors. In 2006 the recreation programs took in over 24% more in revenue than in 2005. We will need to expand these programs this coming season to avoid over crowding during lessons. 2006 was the first full year that the Arena operated the concession. After expenses, the Concessions netted $22,503.00, a little over $1,000.00 from the 2006 budget. Next season will be more challenging since there will be less varsity games due to the fact that we will no longer be hosting Roger's High School home games. Before the Building debt, the Arena was $139,806.00 in the black. However after paying off the debt, the Arena ended $62,014.00 in the red. 6. Ice Sales /Ice Rates Attached for your review is the resent Minnesota Ice Arena Managers Association (M.I.A.M.A.) survey. As you will notice the hourly rate of some Arena's is approaching $200.00 an hour. When considering raising ice costs we have to take into consideration several factors. What are other rinks charging in our region, the Arena's expenses, and how it is going to affect our customer base? After researching and considering the above items, I am recommending that we raise our seasonal rates (September through Mid March) to $163.00 an hour for prime time ice, and $135.00 an hour for non prime time ice. Attached for your review is a graph of the customers during the 2005 - 2006 season and the 2006 - 2007 season, along an itemized break down of ice hours that they rented during each season. Even though we increased ice rentals in some areas, there were other areas where ice rentals went down resulting in a net loss of about 100 hours. Some of the lost hours came from the summer months where a few of the clinics had to reduce the amount of hours they rented due to low registration numbers. Due to low registration numbers the following clinics will not be returning to the Arena, John Bazzachini and the Adam Hauser Goalie clinic. Along with these two clinics we will no longer have the Roger's S.T.P. clinic due to the fact that they will be holding this clinic at their own rink. The Northwest suburban High school hockey league that rented evening hours in June has dropped their league and will be looking at running a roller blade clinic at the Arena instead. In all, I expect to sell about 1001ess hours this summer than last summer. To try to make up some of the lost hours in the off season, we are planning on marketing the Break Away program more aggressively to expand the number of teams that are participating in it. We will also be looking at other programming ideas, such as broomball and off season hockey tournaments. 7. Concession Stand The operations of the concession stand went very well this pass season. One area that needs to be worked on is the profit margin. Last year we were at about an 18.5% profit margin, my goal for next season is to get it above 20%. This season we introduced Caribou Coffee along with smoothies. Both sold very well and the profit margin on coffee is about the same as when we were selling the New England brand. This summer I will be looking at some options of purchasing our own coffee machines. With our own machines we do not have to lease the machines from any company which brings down the price of the coffee we purchase which will then increase our profit margin for coffee. Besides keeping them clean, the coffee Machines are pretty much maintenance free, however the initial cost of the machine can be expensive. 8. Energy Saving Measures A. Co Ray -Vac (Heating System over the Bleachers) Over the season we have made some minor changes to the co -ray vac system. The system has been re -wired so that when the heat is turned on by the staff it comes on at a pre determine amount of time. In the pass the system was on a timer, the timer could be turned on up to six hours at a time. There were several times when the heating system was turned on for six hours at a time when it only needed to be on for a couple of hours. Now staff just pushes a button and the system turns off in a couple of hours. Two zones were created when the system was re -wired. When staff turns on the system only two heaters turn on instead of all four. The remaining two heaters can be turned on by a key when there is a larger crowd such as during a varsity game. The heating system for the eastside bleachers has also been keyed so that it can not be turned on unless needed. The Barn heating system has also been re -wired so that when the button is pushed the heating system comes on for a couple of hours. B. Lighting System for over rinks As you are aware of, over the last few months we have been looking at replacing the lighting system over the rinks. The first company we dealt with gave us a figure of about $45,000.00 to replace the metal halide fixtures in the Olympic rink to fluorescent fixtures. After reviewing their numbers, the Arena Commission wanted a second quote. I meet with Nelson and Rudie & Associates. Attached for your review is their quote for the lighting system over the Olympic rink as well as lighting over the walking track. Their numbers are comparable to the first numbers we received, however their light fixtures are not the same quality as the first light fixtures that we were looking at. Nelson and Rudie were the engineers for the lighting system for the Roger's Arena. The light fixtures at Rogers are a nice fixture, however the first ones we were shown are a higher quality. On Friday (April 6th) I will be meeting with Ron Farm from Winn Electric to review another type of lighting, induction lighting. From the minimum amount that I know, initial costs up front is more but the bulbs last about fives times longer than fluorescents. I will have a better idea of this type of lighting at the meeting. After reviewing the layout with the Arena's electrician, we believe that we could install the fixtures without any middle person. This would save us about $10,000.00 - $15,000.00 depending on what type of fixture we decide on or what type of system we decide on. Over the next couple of months I will be working with the electrician to determine the best system for our needs. C. Low E -Ceiling A Low E Ceiling is basically an insulation system that covers the ceiling of the rink area. The Low E -Ceiling is designed to help reduce heat load to the ice sheet which will result in the compressors running less. There are several options and opinions out there from a number of manufactures. I talked with one representative from an low e -supplier, he gave me a rough quote of $40,000.00 for the Olympic, and $35,000.00 for the Barn. Since there are so many options, we are going to explore them and present them to the Commission at the next meeting. D. Energy Management System An energy management system would be a nice addition to the Arena. However the money that would be needed for such a system would be better spent on replacing some outdated equipment with energy efficient equipment. Some of these items include soft start motors for the compressors or adding capacitors to the existing compressors, and replacing Barn's condenser. After some of these items are completed, it would then make sense to move forward with an energy management system to control the buildings utilities. 9. Walking Track We have approached the Lions Club for a donation for a synthetic matting system for the walking track. The matting system would have a bottom padding that would help ease the stress on walkers joints when they are walking on the track. The synthetic matting is very durable and is easily maintained. The cost of this system is about $35,000.00. We are hoping that the Lions Club will respond considerately to our request. 10. Remodeling of front entryway and Lobby Over the years it has been apparent that the lobby at the arena is insufficient. When approaching the local youth hockey district about planning a big tournament at the rink, the first question or concern that is brought up is the size of the Lobby. During Varsity games it is extremely crowed and is almost impossible to navigate through the lobby to get to the bathrooms. People in line for the concession stand are constantly moving to allow people to cut in front or behind them in order to allow them to pass by. We are in need of a meeting room as well as an office area for staff and a storage area for janitorial supplies and equipment. The Skating Academy can not hold competitions due to the fact that their association requires a place for the judges as well as an area for a hospitality room. The list could go on, the bottom line is that we have out grown our lobby space a long time a go and need to move forward on a larger up to date space that will move us into the future. Bill and I have talked several times about the Arena's needs and would like to move forward with hiring an architect to get a rough draft of the design and the costs associated with the project. 11. Staff updates Over the last few months we have been pursuing a safety grant from the Minnesota Department of Labor and Industry for a scissors lift for the Arena. After being rejected two times, the third submittal was approved. The Department of Labor and Industry awarded $6,230.00 in matching funds for the scissor lift. On Apri12°a City Council Meeting, the Cities Safety Officer (Bruce West) and I proposed purchasing a scissor lift for $12, 460.11. The city council approved the request and the scissor lift was purchased the next day. The lift will be used for several items throughout the building, mainly for changing rink bulbs and cleaning higher areas in the buildings. The lift will also be used to change the Arena's parking lot bulbs and used for other projects throughout the city. This summer we have several projects that we will be working on. The north end of the Barn will be remodeled with the center wood to match the rest of the Barn. The railings in the Olympic rink will be painted along with some of the locker rooms and lobby. A portion of the roof over the lobby will be re done so that the water will floe to the roof drains and not pond up in the corner of the building. Locker room benches will be replaced in all of the locker rooms, provided that we receive the money needed from the land abatement fund. The Olympic rinks ice will be re painted this spring and will be ready to skate on in June. This is the time of the year that building receives its main cleaning, from top to bottom. The Veterans of Foreign War donated $3,500.00 to install a flag pole in front of the building, that project will include some prep work from the street department before it can begin. A N N S V N N N N N N (7 000000 p o O N N N N N E O O O 00 f0 t0 t00 0 °' n ~ ~ m O Z m W S O d O Z NC) d .~O G O B m m 1 8icn~wN 0 oom<o~o (1lAN o<omV°-. ~ mm~m g aom7m ~ , S ~. v m ;~ r Nmz m a ~°m7 m~ ~ wFnwmmtnc 3pp3~T ~ ~ ~ ~ m d O m a3B.m 3.3m ~D z ~ °1 ~ ~ o "y n a ~of°i 3 ~ O m O~ N N d~ 0 ° w d d d o d d d W ~ O d~ ~ m 7 ~ ~' ~~ = ' 7 d m ° > N V~ N bi ^ '~ 0 ~ m O ~ z - V N '. w w r p n U ~ I m a m ti 4 ~ o y ~~~'fi'Si'o N fD N w m m tO~-lodtnlo W3 ~ y N ~ c 7 m O ~ » Q 0 pX. d > ~ 3 3 N 7 a~ 3 m v m '~ ~ o da O N C ~ ym`° O N ~ c ZI y d n O. N N N !p a Z O d a l pp fn ~ 7 fA C~ -. a _ d ~ C _ r n Z N Q = ~ . 3 ui Fn d+ ~ 3~H o o o O a <n o- ~~ o g o W~ W d f i _O .~ N N m Q y O ~ ~ N Go d m~ m 3 y~ x N d+ p ~ ~ O W N d 7 7 y U m w ~ y d y O J O O° 00 A 7 O ~ [ ~ ~j W 7 ~ N 7 N fD fD to ~ ~_ 7 n d y C m m m 0 S 7 N w O N C ~ ,Z1 A ;l1 p. 3. N ~ d _ . m c m m ~ j fA m y w °'~ DDD (~ d .. _. _. N d j m ~ 4 m fn to fn o fD V J a ut (n Q W W ~ W O ~ C O ~ 8 d~ W~ m O d d d d y 33aro t0 m ~ 3. W °o ~ ~ O' N p [ ! 7 ~ V ~ NAl ~ N V D tl ~ O ~ 7 7 0 0 ~~ ~ d JJ f 1 O V •p (p~ 8 (p~ (q/~ 8 ( ~ ( p/~ (( 7p ( ~ ( J ~ f S N 7 Q C C 41 N d ~ a W ' O ~ O O O v v O O O v O O m m~~ m a m (O tp d y dlp~ = A 2 O U~ V r N W N O _ W W N N N N~ OW W N N WNW W ' WmW N O D ~ `~' ~ A m O OD O W S N O (O W OD O c0 O IV A m W tN0 OVi V N ~y N A A ~ W V OI U V W W W W OJ V O ~ ~ V ~~ OJ -+ WW A OWD O A (T OJ W V A W _ ~ N (Wp Nc0 ~ ~ a ~ N W ~ S N (n . ~j O N O O A (~~a A ~T V~ TfAO ~ (O O _ W OJ O) W V OOOON OWO 3 N J _ ~ ~ W ~-' N O aa V .~ N N OS A ODO c ~ N wm V O p m° dD O oW W ~ U w O N w V ~ ~~aoo~ O Ui W N ~ d (O d ~ ~ N V N O~ N W 01 V A O ~ Vm O a ' O m N V N N ~ ~ ~ O W ON _ O W ~ W O U N W O W (VO O ~ U N N ~ O N W t0 N (n W ~ p p A 01 O (!! O ~ ~ aD W O t0 O O O tD m N S N W A O D ~ A O IJ (O N O N O V~ ~. O W U ~ O> W O ~ N J T ~pp ~ U ( ~ ~ p O O N ( T i O W ~ O ( n N p, A W O OOO V O N fNp i O~ ~ OND O V N N O ~ W A O W o ~ S. ~ ~ N A N N -W+ ~ J fW0 N W ~ V V V N W P W V A V tW0 m N W J N A <O tD N (n ~fWO W N O) O W ~ tfDO )IA ~ O) VVi N ! j p pN V N ~ W OWW O A O 1 r 1 ~ W ~ W A U N A i my ~'m ~ W A ~ N ~ W U ~ r f0 N ~m~~ O J (NJ m N O W N N O (O U O O W W I~ ~ O~ N 7 7~ 0 a W~ m O~ a m°$ 0 7 N~y ~ m r a .~ d f0 p ~ j O d C (n ~ d < d y J N d 7 ~ j pp~ !p ~ 7 y fp 'm N O ~ NN A~ O D 1 l O J ~O D yp yp 0 88 p ( ( p~ p~ Qa E~ S 8 8 0 0 0~~ O O O O O rn N _ _ ~ ~ D N N W ~ (n W U i N (l~ N iO ~ O V O p pp ~~ pp { ( W O W V i N N W~ p _ OI W D N N ~~~~ 0 0 C O W W N W f0 O W t0 dl W (O ~ W (Vl~ ~ ~ ~ V ~ d G! t0 O V N O N dD ~ W m w ~ V _ W W fNp N N V V~ I (O ~ C V fp W N W N N O • d A - O W V W V V m N f 0 t D O O t 0 N O f 0 V N N _ _ -+ W D N ~ A O~ N V~ W A C S W ~ A N r~ ~O O p) d_ W V W ~~ O A V~ N (WJ N O N V tp fWp V W O W OW U W V~ V W A A S ~ W -~ OWi ~ W U W~ W V A A W C S N p ~ ~ ~ N O ° U d N W i V O f0~0- ~ UFO ~ - W N .W. V W ~ W ( n A W f0 ~ O ~ OO ,~ p ( N O ,, V O O O W O) NV W _ _ N m aD ~ U V N N tW0 O W U A O~ (mJ N W W O~ d~ ~ m 0 S O O N v N D aD _ _ ONNN ON +l~ ~ tD OOi . D W N W A W O W O O N m U p i O ~ N~ (n 4! OD V S _ N O A W O OI Q) W .U i O W (~ A p W O O O O m d~ A A V W O(n tD N ~m C F d ~ C j '~ a N m X D d N C d N C 3 ~ N W A L1 O v O (D O ~ N W A O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O North Metro Senior ~~; ~ ~ ~ I Wednesday North Metro i i Break Away C -Mites 0 I Break Away D -Mites 0 j ~ i I ~ Break Away Hockey Brea ~ ~ k Awa es I' y Mini Mit I Break Away Squirts A ~ ~ i i ~ ~ ~~ Elk River Arena Skills ~ ~ ~ ~ ~~ EI k River ' City Recreation i Skatin Acad 9 emy Skatin Acade 9 my Show i Adam Hauser Goalie Barry Hohlen/ERYHA ~ ~ ~ I ~ ~ I ~, Elk River ' Yo uth Ho ck e Y_ John Bazzachini ~ ,I ~ ~ --I ~ ~ ~ Scott Lines/Roger's YH ^ m ~ m ~ - - ~ Tim Marchand/Rogers ~ ~ o rn o con C7 Elk River Figure Skating c c '~ I D y ~ y ~ Elk River Boys Practice ~ ? ~ ? ~ ' ~ <D . ~ N Elk River Girl ~ ' ~ s Practice ~ ~ ~ ~ I ~ Elk River Gir Is Boo ~ ster i o 0 C ~~ ~ ~ ~ ~ W ~ Rogers Boys Practice ~' ~ p~ Roe ~G rs Girls practice ~ I ~ I ~ ~ Boys Varsity Sectionals ~ ~ ' a Elk River High School Boys ~ ~ ~ ~ ~ ~ n Elk River High School Girls ~ ~ ~ _ i Girls Hi h School I ' y 9 Sections ~ rr Rogers Boys Games ~ ~ j ,~ ~ ~ ~ C Rogers Girls Games ' ~ i ~ Individuals j Elk River B ' os • Ca tai Y ns p ~ ~ ~ Elk River Girls Captains ~ ~ ~~ ~ ~ Figure Skating Contract Ice ~ ~ ~ ~ ~ ~ ~' Open Hockey i ~~ I i ~ I Open Skating Rogers Boys Captains Practice ~ i ~ Rogers Girls Captains ~ ~ ~ ~ ' ~ ~ I ~ I District 10 P ' ' layoffs d i Elk River Youth Hockey i Elk River Youth Hockey/Tour ~ ' Rogers Youth Hockey i V.F.W. q -Bantam - ~~ 1 March 7, 2007 Nelson-Rudie & Associates, Inc. Structural -Mechanical -Electrical Consulting Engineers Rich Czech City Of Elk River- Arena Manager 1000 School Street NW Elk River, MN 55330 Re: Lighting Retrofit of Olympic Rink Rich: 2575 University Ave. West Suite 135 St. Paul, MN 55114 Please find below our proposal to change the lights from HID to fluorescent on the above mentioned project. The new lighting will provide an average of over 70 foot-candles and more light over the seating areas which had minimum levels before. New Rink Li hting_: • Remove existing 1000W MH fixtures • Provide 106 4-foot, 6-lamp fixtures • Install new 480/277V panel • Provide lighting control panel and two control stations for new lighting Preliminary Budget: $50,000 to $60,000 Break out cost for the lighting control panel: $3,500 New Walking Track Lights • Provide twenty-two (22) new strip fixtures around track • Provide control; either regular switching or tie into new lighting panel Preliminary Budget: $5,500 to $6,100 Engineering Fees are based upon your expectations of level of "completeness." For this project our fees would range between $2,000 and $3,000. Attached is the photometric layout with the new light fixtures. It indicates an average of approximately 71 foot candles. Dennis A. Nelson, P.E. Scott F. Rudie, P.E. Andrew N. Erdmann, P.E. Joseph M. Pearce, P.E. Michael D. Woehde P.E. TeI: (651) 644-2400 Fax: (651)647-4120 www,nelsonrudie.com ELK RIVER ICE RINK PROPOSAL PAGE 2 We look forward to working with you on this project. Please let me know if you have any questions regarding this proposal. Sincerely, Y.-- ~. Will Evans, P.E.