Loading...
5.11. & 5.12. SR 06-17-1996CONSULTINGENGINEERS 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax: 612-644-9446 CIVIl. ENGINEERING: ENVIRONMENTAL MUNICIPAL PLANNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA 5.11 & 5.12 June 13, 1996 File: 230-325-20/230-326-20 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: LEFT TURN LANE FOR SIMONET DRIVE SIGNALS AT UPLAND AND ASSOCIATED GEOMETRIC IMPROVEMENTS Dear Council Members: Gary Dirlam, the District 3 Traffic Engineer, has approached the City staff regarding the two projects mentioned above. MnDOT has both of these projects programmed for the next fiscal year. They have the money available, but do not have the resources to prepare the plans and specifications for construction. Therefore, they have asked if the City is interested in taking the lead on these projects with MnDOT paying their fair share through the cooperative agreement process. The two projects in question are developing a left turn lane for Simonet Drive and signalization and associated geometric improvements including realigning the frontage road at the Upland Avenue intersection. Approximately one week ago, I met with the MnDOT District 3 staff who would be involved in this project and got a good understanding of the scope of services involved in each one. The first step in this process would be to have the Council consider the two attached resolutions, which essentially ask MnDOT to enter into a cooperative agreement on each of these projects. From this point, we would define a scope of services and a cost which would be approved by MnDOT. The way the funding would work is, MnDOT would expect the City to front-end the design costs until the contract is let on these projects. Once the contract is let, MnDOT will reimburse their share of the design fees and all of the construction costs. At that point, the City would then pay the Contractor as the work is performed. So, essentially, the City could be expected to recover their carrying costs for the up-front design work during the construction process. If you have any questions regarding these two projects, or the attached Resolutions, I will be in attendance at your June 17, 1996, City Council meeting. Sincerely, MSA, CONSULTING ENGINEERS Terry I. Maurer, P.E. TJM:pd Attachments 325-1214.jun An Equal Opportunity Employer Im'16,1996 Minnesota Department of Transportation District 3 1991 Industrial Park Road Baxter, MN 56401 Tel: 218/828-2460 Fax: 218/828-2210 Toll Free: 1/800/657-3971 Mr. Patrick Klaers City Admimstrator P.O. Box 490 Elk River, MN 55330 Dear Mr. Klaers: RE: S.P. 7102-84 (T.H. 10) - Signals at Upland & Geometric Improvements S.P. 7102-88 (T.H. 10) - Left Turn Lane for Simonet Drive District 3 has scheduled the above project within 3'our communib,. Due to limited district resources, we are asking your assistance to keep these project on schedule. We are inquiring as to the City's willingness to manage a consultant to deliver the Preliminary Design, Final Design, Traffic, Materials, Surveys, Hydraulics and Construction activities for these projects. The district would review the consultant's work. The State would reimburse the cib' for the consultant costs after receipt of a fully executed cooperative agreement. (This is after plans are ready for letting). ;e State provides the cib, with the full State participation after a fully executed agreement and receiving an invoice from me City. Thus, while the city is "carr54ng" the Slate for consultant costs up to construction, the City will have the construction dollars for making pa~vrnents to the contractor. Such payments are on a graduated basis as the contractor completes the work. Therefore, we feel the city should recoup its handling costs for the project development consultant. We appreciate your initial positive phone response and look forward to the Council's approval. We would request the city to have its consulting engineer prepare a scope of service and fee proposal for the project. The district would review and comment to the city. Mr. Dave Solsrud, Preliminary Design Engineer and Mr. Bob Busch, Final Design Engineer will be contacts with respect io consultant's proposal. Sincerely, tx Gar~.', p~. Dirlam '"'-'--- District Traffic Engineer cc: Dave Solsrud - St. Cloud Bob Busch - Baxter G.N.Kreutzer- Baxter GPD:mc An equal opportunity employer RESOLUTION 96 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION REQUESTING MINNESOTA DEPARTMENT OF TRANSPORTATION TO ENTER INTO A COOPERATIVE AGREEMENT FOR IMPROVEMENTS TO WEST TRUNK HIGHWAY 10 AT SIMONET DRIVE WHEREAS, the City of Elk River is requesting the Minnesota Department of Transportation to participate in certain improvements along a portion of Trunk Highway No. 10 located in the City of Elk River in Sherburne County; and WHEREAS, MSA Consulting Engineer representing of the City of Elk River has met with MnDOT District 3 in the planning of said improvements; and WHEREAS, said improvements will provide a protected left turn lane for west bound Trunk Highway 10; and WHEREAS, said improvements will improve the safety of west bound turning vehicles; WHEREAS, said improvements are programmed by MnDOT Districts 3 (S.P. 7102-88); NOW, THEREFORE, BIT IT RESOLVED by the Council of the City of Elk River, Minnesota: That the State of Minnesota, Department of Transportation is requested to enter into an agreement for improvements on the aforesaid portion of Trunk Highway 10 consisting of construction of a protected left turn for west bound vehicles and a possible relocation of the Simonet Drive intersection with Trunk Highway 10 to the east. BE IT FURTHER RESOLVED that following approval by the Minnesota Department of Transportation of plans and specifications for said improvements of said Trunk Highway and before a contract is awarded for the construction of said improvements: The State shall enter into an agreement with the City which shall provide that the State pay its share of the cost of the requested improvements as determined by the State in keeping with the latest edition of MnDOT Policy Guidelines (a copy of which has been received for the Minnesota Department of Transportation's District Engineer); and 230/325-1212.jun -1- If the City lets the construction contract, the State will deposit with the City, upon demand after execution of this agreement and before the start of construction, a sum equal to an estimate of the State's share as prepared by the Minnesota Department of Transportation. Passed and adopted this 17th day of June, 1996. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk 230/325-1212.jun -2- RESOLUTION 96 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION REQUESTING MINNESOTA DEPARTMENT OF TRANSPORTATION TO ENTER INTO A COOPERATIVE AGREEMENT FOR IMPROVEMENTS TO WEST TRUNK HIGHWAY 10 AT UPLAND AVENUE WHEREAS, WHEREAS, WHEREAS, the City of Elk River is requesting the Minnesota Department of Transportation to participate in certain improvements along a portion of Trunk Highway No. 10 located in the City of Elk River in Sherburne County; and MSA Consulting Engineer representing of the City of Elk River has met with MnDOT District 3 in the planning of said improvements; and said improvements will provide for the signalization of the Trunk Highway 10/Upland intersection and geometric improvements including the frontage roads; and WHEREAS, said improvements will improve the safe operation of the Trunk Highway 10/Upland intersection; WHEREAS, said improvements are programmed by MnDOT Districts 3 (S.P. 7102-84); NOW, THEREFORE, BIT IT RESOLVED by the Council of the City of Elk River, Minnesota: That the State of Minnesota, Department of Transportation is requested to enter into an agreement for improvements on the aforesaid portion of Trunk Highway 10 consisting of signalization of the Upland Avenue intersection associated geometric improvements including the adjacent frontage roads. BE IT FURTHER RESOLVED that following approval by the Minnesota Department of Transportation of plans and specifications for said improvements of said Trunk Highway and before a contract is awarded for the construction of said improvements: The State shall enter into an agreement with the City which shall provide that the State pay its share of the cost of the requested improvements as determined by the State in keeping with the latest edition of MnDOT Policy Guidelines (a copy of which has been received for the Minnesota Department of Transportation's District Engineer); and 230/326-1213.jun -1- If the City lets the construction contract, the State will deposit with the City, upon demand after execution of this agreement and before the start of construction, a sum equal to an estimate of the State's share as prepared by the Minnesota Department of Transportation. o The City shall, in addition to paying its proportionate share of the cost of the proposed work, obtain all necessary right-of-way easements and construction permits for the work to be performed outside the limits of the trunk highway or established City streets and roads, together with all drainage outlet rights where necessary. Such easements, permits and rights shall be obtained and certified copies of them furnished the Department of Transportation before and contract for the proposed work is awarded. Passed and adopted this 17th day of June, 1996. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk 230/326-1213.jun -2-