Loading...
5.13. SR 06-17-1996CONSULTINGENGINEERS 1326 Energy Park Drive St. Paul, MN 5,.5108 612-644-4389 1-800-888-2923 Fax: 612-644-9446 CIVIL ENGINEERING: ENVIRONMENTAL MUNICIPAL PLANNING SOLID WASTE STRUCTURAL SURVEYING TRAFF}C TRANSPORTATION ELECTRICAL/MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA ITEM 5.13. June 12, 1996 File: 230-235-80 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: TRUNK HIGHWAY 10/MAIN STREET INTERSECTION Dear Council Members: As you may be aware, several years ago, we were asked to look at alternatives for improving the intersection of Main Street and Trunk Highway 10. Several options were prepared and presented to the City Council. Based on these concepts an ISTEA application was prepared and submitted. We were successful in getting our project programmed for FY 1996. We had estimated the cost of the project at $500,000 with $400,000 being Federally funded. This does not include the land acquisition issues, which obviously on this project would be substantial. Last year, we made a request to have this project moved from FY 1996 to FY 1997 in the ISTEA program. At the recently completed MnDOT tour this was one of the projects we discussed. Much of the discussion centered around whether or not there would be enough benefit gained from this type of improvement to commit much of the City's financial resources for the necessary land acquisition and construction cost. If in fact, the City Council feels that the City is not in a position to proceed with this project at this time, we should let MnDOT know officially and have it dropped from the program, so other projects within District 3 can be moved up to take our place. If you have questions regarding this, I will be in attendance at your June 17, 1996, City Council meeting. Sincerely, MSA, CONSULTING ENGINEERS Te~dSp. E.~~ TJM:pd 000-1202 .jun An Equal Opportunity Employer